Search NASA⌕ Search

Engineering topics

Hutton, Andrew

Publications and source records attributed to Hutton, Andrew.

25 records · Page 2

Field Work Proposal: PUBLIC OUTREACH EVENT FOR ACCELERATOR STEWARDSHIP TEST FACILITY PILOT PROGRAM

Jefferson Lab’s outreach efforts towards the goals of Accelerator Stewardship Test Facility Pilot Program consist of the lab’s efforts in three venues. The first venue, at the end of March is to meet with the members of Virginia Tech Corporate Research Center (VTCRC) (http://www.vtcrc.com/tenant-directory/) in Blacksburg, Virginia. Of the nearly 160 members, we expect that many engineering companies (including mechanical, electrical, bio, software) will be present. To this group, we will describe the capabilities of Jefferson Lab’s accelerator infrastructure. The description will include not only the facilities but also the intellectual expertise. No funding is requested for this effort. The second venue is to reach the industrial exhibitors at the 6th International Particle Accelerator Conference (IPAC’15). Jefferson Lab will host a booth at the conference to reach out to the >75 industrial exhibitors (https://www.jlab.org/conferences/ipac2015/SponsorsExhibitors.php) who represent a wide range of technologies. A number of these industries could benefit if they can access Jefferson Lab’s accelerator infrastructure. In addition to the booth, where written material will be available, we plan to arrange a session A/V presentation to the industry exhibitors. The booth will be hosted by Jefferson Lab’s Public Relations staff, assisted on a rotating basis by the lab’s scientists and engineers. The budget with IPAC’15 designations represents the request for funds for this effort. The third venue is the gathering of Southeastern Universities Research Association (SURA) university presidents. Here we plan to reach the research departments of the universities who can benefit by availing themselves to the infrastructure (material sciences, engineering, medical schools, material sciences, to name a few). Funding is requested to allow for attendance at the SURA Board Meeting. We are coordinating with DOE regarding these costs to raise the projected conference management cost ceiling in the Conference Management Tool.

99 GENERAL AND MISCELLANEOUS↗

Plans for an ERL Test Facility at CERN

The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERNhas started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. However, the ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D.

Jensen, Erik↗

Field Emission and Consequences as Observed and Simulated for CEBAF Upgrade Cryomodules

High gamma and neutron radiation levels were monitored at the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Laboratory (JLab) after installation of new cavity cryomodules and initial test runs in the frame of the ongoing 12 GeV upgrade program. The dose rates scaled exponentially with cavity accelerating fields, but were independent of the presence of an electron beam in the accelerator. Hence, field emission (FE) is the source of origin. This has led to concerns regarding the high field operation (100 MV per cryomodule) in the future 12 GeV era. Utilizing supercomputing, novel FE studies have been performed with electrons tracked through a complete cryomodule. It provides a principal understanding of experimental observations as well as ways to mitigate FE as best as practicable by identification of problematic cavities.

Marhauser, Frank↗

Thorium Energy Futures

The potential for thorium as an alternative or supplement to uranium in fission power generation has long been recognised, and several reactors, of various types, have already operated using thorium-based fuels. Accelerator Driven Subcritical (ADS) systems have benefits and drawbacks when compared to conventional critical thorium reactors, for both solid and molten salt fuels. None of the four options - liquid or solid, with or without an accelerator - can yet be rated as better or worse than the other three, given today's knowledge. We outline the research that will be necessary to lead to an informed choice.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ADS-Related Initiatives in the US

Even though there are no government-funded ADS initiatives in the USA, there are many activities that are relevant for ADS, particularly in the domain of high-power superconducting accelerators. The talk will provide an overview of these activities, including operational experience from CEBAF (electrons) and SNS (protons), prototyping of Project X linac cavities, and a brief introduction to topics presented in detail later in the conference. There have been several conferences on the use of Thorium as a nuclear fuel and these will be summarized for completeness.

Hutton, Andrew↗

Coherent Electron Cooling Demonstration Experiment

Coherent electron cooling (CEC) is considered to be on of potential candidates capable of cooling high-energy, high-intensity hadron beams to very small emittances. It also has a potential to significantly boost luminosity of high-energy hadron-hadron and electron-hadron colliders. In a CEC system, a perturbation of the electron density caused by a hadron is amplified and fed back to the hadrons to reduce the energy spread and the emittance of the beam. Following the funding decision by DoE office of Nuclear Physics, we are designing and building coherent electron cooler for a proof-of-principle experiment at RHIC to cool 40 GeV heavy ion beam. In this paper, we describe the layout of the CeC installed into IP2 interaction region at RHIC. We present the design of the CeC cooler and results of preliminary simulations.

Litvinenko, Vladimir N.↗