Search NASA⌕ Search

Engineering topics

Ianakiev, Kiril D

Publications and source records attributed to Ianakiev, Kiril D.

At least 19 records

Field Trial of LANL On-Line Advanced Enrichment Monitor for UF6 GCEP

The outline of this presentation is: (1) Technology basis of on-line enrichment monitoring; (2) Timescale of trial; (3) Description of installed equipment; (4) Photographs; (5) Results; (6) Possible further development; and (7) Conclusions. Summary of the good things about the Advanced Enrichment Monitor (AEM) performance is: (1) High accuracy - normally better than 1% relative, (2) Active system as accurate as passive system, (3) Fast and accurate detection of enrichment changes, (4) Physics is well understood, (5) Elegant method for capturing pressure signal, and (6) Data capture is automatic, low cost and fast. A couple of negative things are: (1) Some jumps in measured passive enrichment - of around +2% relative (due to clock errors?); and (2) Data handling and evaluation is off-line, expensive and very slow. Conclusions are: (1) LANL AEM is being tested on E23 plant at Capenhurst; (2) The trial is going very well; (3) AEM could detect production of HEU at potentially much lower cost than existing CEMO; (4) AEM can measure {sup 235}U assay accurately; (5) Active system using X-Ray source would avoid need for pressure measurement; (6) Substantial work lies ahead to go from current prototype to a production instrument.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gas centrifuge enrichment plants inspection frequency and remote monitoring issues for advanced safeguards implementation

Current safeguards approaches used by the IAEA at gas centrifuge enrichment plants (GCEPs) need enhancement in order to verify declared low enriched uranium (LEU) production, detect undeclared LEU production and detect high enriched uranium (BEU) production with adequate probability using non destructive assay (NDA) techniques. At present inspectors use attended systems, systems needing the presence of an inspector for operation, during inspections to verify the mass and {sup 235}U enrichment of declared cylinders of uranium hexafluoride that are used in the process of enrichment at GCEPs. This paper contains an analysis of how possible improvements in unattended and attended NDA systems including process monitoring and possible on-site destructive analysis (DA) of samples could reduce the uncertainty of the inspector's measurements providing more effective and efficient IAEA GCEPs safeguards. We have also studied a few advanced safeguards systems that could be assembled for unattended operation and the level of performance needed from these systems to provide more effective safeguards. The analysis also considers how short notice random inspections, unannounced inspections (UIs), and the concept of information-driven inspections can affect probability of detection of the diversion of nuclear material when coupled to new GCEPs safeguards regimes augmented with unattended systems. We also explore the effects of system failures and operator tampering on meeting safeguards goals for quantity and timeliness and the measures needed to recover from such failures and anomalies.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Improving accuracy and reliability of 186-keV measurements for unattended enrichment monitoring

Improving the quality of safeguards measurements at Gas Centrifuge Enrichment Plants (GCEPs), whilst reducing the inspection effort, is an important objective given the number of existing and new plants that need to be safeguarded. A useful tool in many safeguards approaches is the on-line monitoring of enrichment in process pipes. One aspect of this measurement is a simple, reliable and precise passive measurement of the 186-keV line from {sup 235}U. (The other information required is the amount of gas in the pipe. This can be obtained by transmission measurements or pressure measurements). In this paper we describe our research efforts towards such a passive measurement system. The system includes redundant measurements of the 186-keV line from the gas and separately from the wall deposits. The design also includes measures to reduce the effect of the potentially important background. Such an approach would practically eliminate false alarms and can maintain the operation of the system even with a hardware malfunction in one of the channels. The work involves Monte Carlo modeling and the construction of a proof-of-principle prototype. We will carry out experimental tests with UF{sub 6} gas in pipes with and without deposits in order to demonstrate the deposit correction.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗