Search NASASearch

Engineering topics

Interbartolo, Michael

Publications and source records attributed to Interbartolo, Michael.

At least 19 records

Apollo Spacecraft and Saturn V Launch Vehicle Pyrotechnics/Explosive Devices

The Apollo Mission employs more than 210 pyrotechnic devices per mission.These devices are either automatic of commanded from the Apollo spacecraft systems. All devices require high reliability and safety and most are classified as either crew safety critical or mission critical. Pyrotechnic devices have a wide variety of applications including: launch escape tower separation, separation rocket ignition, parachute deployment and release and electrical circuit opening and closing. This viewgraph presentation identifies critical performance, design requirements and safety measures used to ensure quality, reliability and performance of Apollo pyrotechnic/explosive devices. The major components and functions of a typical Apollo pyrotechnic/explosive device are listed and described (initiators, cartridge assemblies, detonators, core charges). The presentation also identifies the major locations and uses for the devices on: the Command and Service Module, Lunar Module and all stages of the launch vehicle.

Interbartolo, Michael

Apollo Guidance, Navigation, and Control (GNC) Hardware Overview

This viewgraph presentation reviews basic guidance, navigation and control (GNC) concepts, examines the Command and Service Module (CSM) and Lunar Module (LM) GNC organization and discusses the primary GNC and the CSM Stabilization and Control System (SCS), as well as other CSM-specific hardware. The LM Abort Guidance System (AGS), Control Electronics System (CES) and other LM-specific hardware are also addressed. Three subsystems exist on each vehicle: the computer subsystem (CSS), the inertial subsystem (ISS) and the optical subsystem (OSS). The CSS and ISS are almost identical between CSM and LM and each is designed to operate independently. CSM SCS hardware are highlighted, including translation control, rotation controls, gyro assemblies, a gyro display coupler and flight director attitude indicators. The LM AGS hardware are also highlighted and include the abort electronics assembly and the abort sensor assembly; while the LM CES hardware includes the attitude controller assembly, thrust/translation controller assemblies and the ascent engine arming assemble. Other common hardware including the Orbital Rate Display - Earth and Lunar (ORDEAL) and the Crewman Optical Alignment Sight (COAS), a docking aid, are also highlighted.

Interbartolo, Michael

Command and Service Module Communications

This viewgraph presentation examines Command and Service Module (CSM) Communications. The communication system's capabilities are defined, including CSM-Earth, CSM-Lunar Module and CSM-Extravehicular crewman communications. An overview is provided for S-band communications, including data transmission and receiving rates, operating frequencies and major system components (pre-modulation processors, unified S-band electronics, S-band power amplifier and S-band antennas). Additionally, data transmission rates, operating frequencies and the capabilities of VHF communications are described. Major VHF components, including transmitters and receivers, and the VHF multiplexer and antennas are also highlighted. Finally, communications during pre-launch, ascent, in-flight and entry are discussed. Overall, the CSM communication system was rated highly by flight controllers and crew. The system was mostly autonomous for both crew and flight controllers and no major issues were encountered during flight.

Interbartolo, Michael

Apollo Onboard Navigation Techniques

This viewgraph presentation reviews basic navigation concepts, describes coordinate systems and identifies attitude determination techniques including Primary Guidance, Navigation and Control System (PGNCS) IMU management and Command and Service Module Stabilization and Control System/Lunar Module (LM) Abort Guidance System (AGS) attitude management. The presentation also identifies state vector determination techniques, including PGNCS coasting flight navigation, PGNCS powered flight navigation and LM AGS navigation.

Interbartolo, Michael

Lunar Module ECS (Environmental Control System) - Design Considerations and Failure Modes

Design considerations and failure modes for the Lunar Module (LM) Environmental Control System (ECS) are described. An overview of the the oxygen supply and cabin pressurization, atmosphere revitalization, water management and heat transport systems are provided. Design considerations including reliability, flight instrumentation, modularization and the change to the use of batteries instead of fuel cells are discussed. A summary is provided for the LM ECS general testing regime.

Interbartolo, Michael

Apollo Lunar Module Electrical Power System Overview

Objectives include: a) Describe LM Electrical System original specifications; b) Describe the decision to change from fuel cells to batteries and other changes; c) Describe the Electrical system; and d) Describe the Apollo 13 failure from the LM perspective.

Interbartolo, Michael

Lunar Module Wiring Design Considerations and Failure Modes

This slide presentation reviews the considerations for the design of wiring for the Lunar Module. Included are a review of the choice of conductors and insulations, the wire splicing (i.e., crimping, and soldering), the wire connectors, and the fabrication of the wire harnesses. The problems in fabrication include the wires being the wrong length, the damage due to the sharp edges, the requried use of temproary protective covers and inadequate training. The problems in the wire harness installation include damge from sharp eges, work on adjacent harnesses, connector damage, and breaking wires. Engineering suggestions from the Apollo-era in reference to the conductors that are reviewed include: the use of plated conductors, and the use of alloys for stronger wiring. In refernce to insulation, the suggestions from Apollo era include the use of polymer tape-wrap wire insulation due to the light weight, however, other types of modern insulation might be more cost-effective. In reference to wire splices and terminal boards the suggestions from the Apollo Era include the use of crimp splices as superior to solder splices, joining multiple wire to a common point using modular plug-ins might be more reliable, but are heavier than crimp splicing. For connectors, the lessons from the Apollo era indicate that a rear environmental seal that does not require additional potting is preferred, and pins should be crimped or welded to the incoming wires and be removable from the rear of the connector.

Interbartolo, Michael

Apollo CSM Power Generation System Design Considerations, Failure Modes and Lessons Learned

The objectives of this slide presentation are to: review the basic design criteria for fuel cells (FC's), review design considerations during developmental phase that affected Block I and Block II vehicles, summarize the conditions that led to the failure of components in the FC's, and state the solution implemented for each failure. It reviews the location of the fuel cells, the fuel cell theory the design criteria going into development phase and coming from the development phase, failures and solutions of Block I and II, and the lessons learned.

Interbartolo, Michael

Apollo Lunar Module Propulsion Systems Overview

This slide presentation describes the propulsion system for the Apollo Lunar Module (LM). It defines they systems for the LM propulsion and the control system. It lists the times during the mission at which each system was used. It describes the basic components and the operation of the Descent and Ascent Propulsion systems. It also describes LM reaction control system.

Interbartolo, Michael

Saturn V Stage I (S-IC) Overview

Objectives include: a) Become familiar with the Saturn V Stage I (S-IC) major structural components: Forward Skirt, Oxidizer Tank, Intertank, Fuel Tank, and Thrust Structure. b) Gain a general understanding of the Stage I subsystems: Fuel, Oxidizer, Instrumentation, Flight Control, Environmental Control, Electrical, Control Pressure, and Ordinance.

Interbartolo, Michael

Lunar Surface Operations: Post-Touchdown Lunar Surface and System Checkouts - Part 1

This slide presentation reviews the first part of the post-touchdown lunar surface and system checkout tasks. A stay/no stay decision for the lunar lander was made based on the questions: "Is the Lunar Module (LM) stable on the lunar surface?"; "Are there any time critical systems failures or trends indicating impending loss of capability to ascent and achieve a safe lunar orbit?"; and "Is there loss of capability in critical LM systems?" The sequence of these decisions is given as a time after touchdown on the surface of the moon. After the decision to stay is made the next task is to checkout status of the lunar module. While the status of the lunar module is checking out certain conditions, the Command Service Module was also engaged in certain checkout activities.

Interbartolo, Michael

Apollo Recovery Operations

Objectives include: a) Describe the organization of recovery force command and control and landing areas; b) Describe the function and timeline use of the Earth Landing System (ELS); c) Describe Stable 1 vs Stable 2 landing configurations and the function of the Command Module Uprighting System; d) Explain the activities of the helicopter and swimmer teams in egress and recovery of the crew; e)Explain the activities of the swimmer teams and primary recovery ship in recovery of the Command Module; and f) Describe several landing incidents that occurred during Apollo.

Interbartolo, Michael

Sequential Events Control System (SECS) Overview

This slide presentation will cover the Sequential Events Control System (SECS), which is the Apollo spacecraft subsystem that controls the automatically sequenced functions during the mission and during any a borts that could be performed. Included in this presentation are its general architecture, its integration into and use of the spacecraft' s other systems, and details on the functions it is responsible for c ontrolling during the mission. The objectives are to describe the system's architecture, the major components in the system, and the major system functions.

Interbartolo, Michael

Saturn V - Design Considerations and Launch Issues

Objectives include: a) Understand some of the design considerations that went into creating the Saturn V launch vehicle; b) Gain an appreciation for some of the manufacturing issues concerning the Saturn V; and c) Review three major problems that affected Saturn V launches.

Interbartolo, Michael

Lunar Surface Operations: Surface Duration - Part 2

The objectives of this slide presentation are to review the activities on the lunar surface during the stay. The objectives include (1) Summarize Lunar Module Basics emphasizing module layout and storage. (2) Identify the primary activities occurring during each of the lunar s urface timelines, (3) List the EVA Prep tasks, (4) Identify the EVA Objectives, (5) Identify the activities associated with Post EVA (6) Describe the lessons learned during both EVA and Non EVA activities. Included are overview drawings of the Lunar Roving Vehicle, pictures of the tools, and sample return containers. There are also time lines for the Apollo 11, and Apollo 12 through 14, Apollo 15, Apollo 16 and Apollo 17. Diagrams of the EVA suits are shown, including the Liquid Cooling Garment, and the Pressure Garment Assembly. The activity prior to the EVA are reviewed. The science mission assignments of each mission are viewed. The activities after the EVA are reviewed

Interbartolo, Michael

Earth Parking Orbit and Translunar Injection

The objectives of this slide presentation are to (1) Describe the general characteristics of the Earth Parking Orbit (EPO) and Translunar Injection (TLI) (2) List the general activities that occurred during EPO (4) State what went into verifying a working Saturn IVB S-IVB IU and a CSM GNC (5) Differentiate between a Free-Return Trajectory vs. a Hybrid Non-Free-Return Trajectory (6) Identify the crew monitoring task during the TLI Burn and (7) Identify the abort modes in the event of severe systems problems during the TLI timeframe

Interbartolo, Michael