High-brightness Electron Beam Evolution Following Laser-based Cleaning of a Photocathode
Abstract Not Provided
Engineering topics
Publications and source records attributed to Iverson, R.
Abstract Not Provided
Abstract Not Provided
FACET (Facility for Advanced Accelerator and Experimental Tests) is a new User Facility at SLAC National Accelerator Laboratory. Its high power electron and positron beams make it a unique facility, ideal for beam-driven Plasma Wakefield Acceleration studies. The first 2 km of the SLAC linac produce 23 GeV, 3.2 nC electron and positron beams with short bunch lengths of 20 {mu}m. A final focusing system can produce beam spots 10 {mu}m wide. User-aided Commissioning took place in summer 2011 and FACET will formally come online in early 2012. We present the User Facility, the current features, planned upgrades and the opportunities for further experiments. Accelerators are our primary tool for discovering the fundamental laws to the universe. Each new frontier we probe requires a new, more powerful method. Accelerators are therefore increasing in size and cost. The future of this field requires new accelerating techniques that can reach the high energies required over shorter distances. New concepts for high gradient acceleration include utilizing the wakes in plasma and dielectric and metallic structures. FACET was built to provide a test bed for novel accelerating concepts with its high charge and highly compressed beams. As a test facility unlike any other, it has also attracted groups interested in beam diagnostic techniques and terahertz studies. The first phase of the construction was completed in May 2011. Beam commissioning began in June and was interleaved with the installation of five experiments. Users were invited to aid with the commissioning for the month of August during which time experimental hardware and software were checked out and some first measurements were taken. FACET is currently in the process of becoming a Department of Energy User Facility for High Energy Physics.
The PEP-II B-Factory at SLAC (3.1 GeV e{sup +} x 9.0 GeV e{sup -}) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. In the end PEP-II surpassed, by four times, its design luminosity reaching 1.21 x 10{sup 34} cm{sup -2}s{sup -1}. It also set world stored beam current records of 2.1 A e{sup -} and 3.2 A e{sup +}. Continuous injection was implemented with BaBar successfully taking data. The total delivered luminosity to the BaBar detector was 557.4 fb{sup -1} spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP.
The PEP-II B-Factory operated at peak and integrated luminosity several times the original design values. Its storage rings operated at world-record beam currents with bunch lengths of about 10 mm. Correspondingly significant heat load was imposed on the vacuum system, both due to synchrotron radiation and by energy loss into higher-order modes. The latter in turn would lead to local heating or discharges wherever such energy got absorbed. Over the course of PEP-II running we experienced numerous such effects, which lead to upgrade programs of significant scope. In the following we will describe the most significant of such effects and their mitigation: (1) Upgrades and repairs of RF seals and shields in both rings; (2) Redesign of overheating stripline kicker electrodes to withstand higher powers; and (3) Redesign and replacement of BPM buttons following failure.