Optimizing the use of pressurized bladders for the assembly of HL-LHC MQXFB magnets

The use of pressurized bladders for stress control of superconducting magnets was firstly proposed at Lawrence Berkeley National Laboratory in the early 2000s. Since then, the so-called ‘bladders and keys’ procedure has become one of the reference techniques for the assembly of high-field accelerator magnets and demonstrators. Exploiting the advantages of this method is today of critical importance for Nb$_{3}$Sn-based accelerator magnets, whose production requires the preservation of tight stress targets in the superconducting coils to limit the effects of the strain sensitivity and brittleness of the conductor. The present manuscript reports on the results of an experimental campaign focused on the optimization of the ‘bladders and keys’ assembly process in the MQXFB quadrupoles. These 7.2 m long magnets shall be among the first Nb$_{3}$Sn cryomagnets to be installed in a particle accelerator as a part of the High Luminosity upgrade of the LHC. One of the main practical implications of the bladders technique, especially important when applied to long magnets like MQXFB, is that to insert the loading keys, the opening of a certain clearance in the support structure is required. The procedure used so far for MQXF magnets involved an overstress in the coils during bladder inflation. The work presented here shows that such an overshoot can be eliminated thanks to additional bladders properly positioned in the structure. This optimized method was validated in a short model magnet and in a full-length mechanical model, becoming the new baseline for the series production at CERN. Furthermore, the results are supported by numerical predictions using finite element models.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

Status and Challenges of the Interaction Region Magnets for HL-LHC

About one hundred magnets of six different types shall be installed in the High Luminosity LHC (HL-LHC) in the years 2026-2028 at CERN. The magnets design, construction and test are based on CERN collaborations with institutes and industrial partners in USA, Spain, Italy, Japan and China. Three types of correctors are based on Nb-Ti technology and feature conductor peak fields in the 2 to 4 T range: for all of them the prototype phase has been successfully completed. The production is well advanced for the superferric correctors, and is starting for the canted cosine theta correctors and for the nested correctors. The separation and recombination Nb-Ti dipoles D1 and D2, with a 4.5-6 T bore field range, are both in the prototype phase after the completion of the short model program. The most challenging magnet, the Nb 3 Sn quadrupole with conductor peak field above 11 T, is in the prototype phase at CERN and halfway through the production phase in the USA. In this paper we will give, for each type of magnet, an overview of the main achievements obtained so far and we will outline the technical points still needing validation from the prototype program.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Analysis of MQXFA07 Test Non-Conformity

MQXFA07 did not meet acceptance requirement during vertical test. This report presents the analysis of MQXFA07 components related to the limited test performance, and the damage mechanism as it was understood by the MQXFA team.

43 PARTICLE ACCELERATORS↗

Accelerator Technology Magnets

The Snowmass community exercise started in April 2020 to identify and document a scientific vision for the future of particle physics in the US and international partners. The AF7-Magnets working group was charged to a) address the potential contributions of magnet technology to future HEP facilities, b) evaluate the R&D required to enable these opportunities, c) estimate the time and cost scales of these efforts, and d) assess the needs for associated fabrication infrastructure and test facilities. This report addresses the working group charge, summarizes the status of accelerator and detector magnet technologies, and discuss ideas and plans to push this key area of the US and international HEP to new horizons.

43 PARTICLE ACCELERATORS↗