Search NASASearch

Engineering topics

J. Howard

Publications and source records attributed to J. Howard.

LISA Telescope Technology Development Update

A telescope for the LISA Mission is currently under development under a contract with L3Harris in Rochester, New York. The contract was kicked off March 19, 2020, and includes the design, construction and test of a Structural Thermal Model (STM), and two Engineering Development Units (EDUs). The program has just successfully passed a System Requirements Review (SRR) and is proceeding toward a Preliminary Design Review (PDR). We will describe requirements, design, and current status of the program, including some of the design challenges, some of the key trades, and some of the key interfaces.

J. Livas