Graphical timeline editing

NASA's Experiment Scheduling Program (ESP), which has been used for approximately 12 Spacelab missions, is being enhanced with the addition of a Graphical Timeline Editor. The GTE Clipboard, as it is called, was developed to demonstrate new technology which will lead the development of International Space Station Alpha's Payload Planning System and support the remaining Spacelab missions. ESP's GTE Clipboard is developed in C using MIT's X Windows System X11R5 and follows OSF/Motif Style Guide Revision 1.2.

Meyer, Patrick E.

A format for the interchange of scheduling models

In recent years a variety of space-activity schedulers have been developed within the aerospace community. Space-activity schedulers are characterized by their need to handle large numbers of activities which are time-window constrained and make high demands on many scarce resources, but are minimally constrained by predecessor/successor requirements or critical paths. Two needs to exchange data between these schedulers have materialized. First, there is significant interest in comparing and evaluating the different scheduling engines to ensure that the best technology is applied to each scheduling endeavor. Second, there is a developing requirement to divide a single scheduling task among different sites, each using a different scheduler. In fact, the scheduling task for International Space Station Alpha (ISSA) will be distributed among NASA centers and among the international partners. The format used to interchange scheduling data for ISSA will likely use a growth version of the format discussed in this paper. The model interchange format (or MIF, pronounced as one syllable) discussed in this paper is a robust solution to the need to interchange scheduling requirements for space activities. It is highly extensible, human-readable, and can be generated or edited with common text editors. It also serves well the need to support a 'benchmark' data case which can be delivered on any computer platform.

Jaap, John P.

The scheduling techniques of ESP2

The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center has developed a robust automatic scheduler which can produce detailed schedules for the multi-step activities required for payload operations on the Space Station. This scheduler, a part of the Expert Scheduling Program (ESP2), has five components: the bookkeeper, checker, loader, selector, and explainer. The bookkeeper maintains the usage profiles for nondepletable resources, consumables, equipment, crew, and the times of all the steps for the payload activities for several different schedules simultaneously. The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system that uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating constraints (such as crew, resources, and orbit opportunities). The checker searches the data maintained by the bookkeeper and finds times when the constraints of each step of an activity are satisfied. The loader is an expert system which uses the techniques of forward chaining, depth-first searching, and backtracking to manage the workings of the checker so that activities are placed in the schedule without violating the constraints. The selector has several methods of choosing the next activity for the loader to schedule. The explainer shows the user why an activity was or was not scheduled at a certain time; it offers a unique graphical explanation of how the expert system (the loader) works.

Jaap, John P.

Space station payload operations scheduling with ESP2

The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

Stacy, Kenneth L.