Status of the ITER IC H and CD System

The ITER Ion Cyclotron Heating and Current Drive system will deliver 20 MW of radio frequency power to the plasma in quasi continuous operation during the different phases of the experimental programme. The system also has to perform conditioning of the tokamak first wall at low power between main plasma discharges. This broad range of requirements imposes a high flexibility and a high availability. The paper highlights the physics and design requirements on the IC system, the main features of its subsystems, the predicted performance, and the current procurement and installation schedule.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Lower Hybrid Current Drive System for ITER and High Power CW Klystron Development

A 20 MW/5 GHz Lower Hybrid Current Drive (LHCD) system was initially due to be commissioned and used for the second mission of ITER, i.e. the Q = 5 steady state target. Though not part of currently planned procurement phase, it is now under consideration for an earlier delivery. An LH program has been initiated under EFDA, following the ITER STAC recommendation, to provide a pre-design document including the conceptual design, costing, possible procurement allocation, WBS and R and D needs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Progress on the heating and current drive systems for ITER

The electron cyclotron (EC), ion cyclotron (IC), heating-neutral beam (H-NB) and, although not in the day 1 baseline, lower hybrid (LH) systems intended for ITER have been reviewed in 2007/2008 in light of progress of physics and technology in the field. Although the overall specifications are unchanged, notable changes have been approved. Firstly, it has been emphasized that the H&CD systems are vital for the ITER programme. Consequently, the full 73 MW should be commissioned and available on a routine basis before the D/T phase. Secondly, significant changes have been approved at system level, most notably: the possibility to operate the heating beams at full power during the hydrogen phase requiring new shine through protection; the possibility to operate IC with 2 antennas with increased robustness (no moving parts); the possible increase to 2 MW of key components of the EC transmission systems in order to provide an easier upgrading of the EC power as may be required by the project; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognised. The review describes these changes and their rationale.

08 HYDROGEN↗

Demonstration of particle exhaust control during ELM suppression by resonant magnetic perturbations in DIII-D

A 20 MW/5 GHz lower hybrid current drive (LHCD) system was initially due to be commissioned and used for the second mission of ITER, i.e. the Q = 5 steady state target. Though not part of the currently planned procurement phase, it is now under consideration for an earlier delivery. In this paper, both physics and technology conceptual designs are reviewed. Furthermore, an appropriate work plan is also developed. This work plan for design, R&D, procurement and installation of a 20 MW LHCD system on ITER follows the ITER Scientific and Technical Advisory Committee (STAC) T13-05 task instructions. It gives more details on the various scientific and technical implications of the system, without presuming on any work or procurement sharing amongst the possible ITER partners(b). This document does not commit the Institutions or Domestic Agencies of the various authors in that respect.

Hoang, G T↗