SECARB-USA: A Sub-Basin Framework for Future CO 2 Infrastructure Development
Task 4 of the SECARB-USA Project is designed to evaluate the regional needs and challenges for the development of a safe and environmentally sound CO 2 transport infrastructure. This infrastructure would transport CO 2 capture from power generating plants and/or industrial sources and distribute it to oil fields for associated storage in EOR operations, saline storage, and/or other suitable storage sites. The objective of this report on Sub-Basin Prospective Areas (Deliverable 4.1.a), is to provide the framework for understanding how regional infrastructure development could occur. The sub-basin prospective areas, in conjunction with the locations of CO 2 sources and pipeline infrastructure (for source-sink matching networks), form the basis for the analysis that will be performed in the Techno-Economic Analysis of Infrastructure Buildout Scenarios (Deliverable 4.1.b).