Commissioning of the IOTA Proton Injector
The IOTA Proton Injector (IPI) at the Fermilab Accelerator Science and Technology facility (FAST) is a machine capable of delivering up to 14 mA pulses of protons at 2.5 MeV to the Integrable Optics Test Accelerator (IOTA) ring. Its construction was completed in the fall of 2025, followed by a successful commissioning run scheduled to conclude at the end of May 2026. It operates alongside the existing electron injector beamline to facilitate further beam physics research and continued development of novel accelerator technologies at the IOTA ring. This report details the current operational profile, known challenges, and future plans for the proton program development at FAST.