An Agile-Like Approach to Hardware Development: The Ejectable Data Recorder (EDR) for Orion’s Ascent Abort 2 (AA-2) Test Flight
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Jenny Devolites.
Explore the source record for details and available documents.
This presentation describes a distributed, data-centric collaborative information management (DDCIM) approach for project management and SE&I that was successfully implemented on two in-house NASA flight test projects.
On July 2, 2019, the Ascent Abort 2 (AA-2) Flight Test Vehicle was launched from Cape Canaveral, with the goal of demonstrating the performance of Orion’s Launch Abort System (LAS) and collecting data from hundreds of sensors throughout the vehicle. The data collected during this test flight is of paramount importance, as it will be used to certify the Orion vehicle for human spaceflight. Originally, the data was to be downlinked via a single string network of antennas on the LAS, with the associated risk of potential data dropouts, as well as loss of data once the LAS was jettisoned. Thus, additional antennas were added onto the crew module (CM) to support data downlink post-LAS jettison, a buffer rebroadcast capability was added to fill in any gaps in data downlink transmissions, and an ejectable data recorder (EDR) subsystem was added to the CM as a redundant measure to collect all the instrumentation data. The EDR subsystem was added to the project about one year after the project commenced, which significantly reduced the available development time when compared with the other subsystems of the AA-2 Test Flight. The project was further accelerated by six months, around the critical design review gate. Due to the schedule compression challenge and the fact that the EDR subsystem was a backup system and not flight critical, the EDR subsystem was further challenged to find a new and more efficient way to develop hardware. Thus, the EDR subsystem experimented with different management and systems engineering processes, team sizes, communication methods, and tools. Some examples are novel uses of SharePoint as a Data-centric Project Management & Systems Engineering environment, a continuous testing approach through the lifecycle, and a Skunkworks approach to managing the team. The EDR subsystem blended Commercial Off The Shelf (COTS) hardware with in-house developed hardware and software to create a novel data retrieval capability. The capability evolved rapidly through a hardware in the loop simulation environment that enabled incremental component updates for not only the EDR subsystem but across the entire Crew Module. This paper will present an overview of how the EDR subsystem was managed and compare it to an Agile approach to managing projects. The paper will further provide a recommended approach to future Agile-like hardware development that incorporates lessons learned from the EDR experience.
NASA is developing the Orion spacecraft to transport crew from the Earth to the Moon as part of the Artemis series of missions. To provide a crew escape capability from pre-launch through ascent, the Orion vehicle is equipped with a Launch Abort System (LAS), built by Lockheed Martin, which pulls the capsule away from the launch vehicle in the event of an abort scenario. The Ascent Abort 2 (AA-2) test flight occurred on July 2, 2019,and tested a production version of the LAS to ensure that it can operate as intended, and to collect a large data set from hundreds of sensors on the vehicle to support Orion flight certification. In the original AA-2 architecture, a single-string set of communications antennas on the LAS would downlink all of the in-flight test data to ground stations. However, that communications architecture was predicted to have data dropouts during abort and jettison of the LAS, and would not support data transmission at all after LAS jettison. As a result, a comprehensive trade study was completed, yielding the addition of antennas on the crew module (CM), a buffer/rebroadcast capability for key portions of the flight, and an ejectable data recorder (EDR) subsystem. This EDR subsystem would serve as a backup to the radio frequency (RF) communications system, and would be non-flight critical, providing a unique capability that enabled management to take a different approach with the hardware and software development. The Crew Module and Separation Ring were developed as “Class 1”Flight Hardware, albeit with some tailoring approaches to enable efficiencies. The Class 1 designation requires full rigor for flight hardware and software, documenting everything that happens to a piece of hardware from procurement through disposal, requiring a full spectrum of acceptance tests, and the highest rigor of quality assurance processes. At the other end of the spectrum, Class 3hardware is controlled, but not intended for flight, and leaves the level of rigor up to the project manager. This classification is often used for research and development projects. Similarly,Class-1E has been recently defined at NASA for ISS payloads and technology development projects that are not flight critical and do not need the full rigor of Class 1 to be successful. The EDR subsystem was challenged at commencement to adopt a skunkworks and agile-like approach to hardware development, allowing for a different risk posture than the rest of the AA-2 hardware. After initially pursuing Class 1 processes, the EDR subsystem design evolved to incorporating numerous commercial components, leading to re-designation as a Class-1E subsystem. The resulting EDR subsystem was fully successful in meeting all flight system requirements, and achieved 100% retrieval of flight test data. This paper will discuss the risk posture of the EDR subsystem and the subsequent tailoring that was enacted as part of its Class-1E status.
The purpose of this presentation is to describe key features of the streamlined systems engineering approach for two in-house NASA projects, the Morpheus lander (2010-2014) and Orion’s Ascent Abort 2 (AA-2) Crew Module and Separation Ring (CSR) project.