Status of the Super-B factory Design

The SuperB international team continues to optimize the design of an electron-positron collider, which will allow the enhanced study of the origins of flavor physics. The project combines the best features of a linear collider (high single-collision luminosity) and a storage-ring collider (high repetition rate), bringing together all accelerator physics aspects to make a very high luminosity of 10{sup 36} cm{sup -2} sec{sup -1}. This asymmetric-energy collider with a polarized electron beam will produce hundreds of millions of B-mesons at the Y(4S) resonance. The present design is based on extremely low emittance beams colliding at a large Piwinski angle to allow very low {beta}{sub y} without the need for ultra short bunches. Use of crab-waist sextupoles will enhance the luminosity, suppressing dangerous resonances and allowing for a higher beam-beam parameter. The project has flexible beam parameters, improved dynamic aperture, and spin-rotators in the Low Energy Ring for longitudinal polarization of the electron beam at the Interaction Point. Optimized for best colliding-beam performance, the facility may also provide high-brightness photon beams for synchrotron radiation applications.

43 PARTICLE ACCELERATORS↗

Site Studies for the SuperB Collider and Synchrotron Radiation Facility Project

The SuperB complex project aims at the construction of a very high luminosity (10{sup 36} cm{sup -2}s{sup -1}) asymmetric e{sup +}e{sup -} B-factory and a few X-ray synchrotron beam lines (SR). The project has been recently approved by the Italian Government as part of the National Research Plan. The Tor Vergata University location has been chosen and a Consortium among INFN, University of Rome II Tor Vergata and the Research Ministry is being signed, allowing for the constitution of the 'Cabibbo Laboratory', where the SuperB project will be hosted. This paper presents and describes the status of the preliminary design of the site layout, related issues for the chosen site and the preliminary ground motion (GM) measurement results.

43 PARTICLE ACCELERATORS↗

Recent SuperB Design Choices Improve Next-Generation e e___ B-Factory Collider

The SuperB international team continues to optimize the design of an electron-positron collider, which will allow the enhanced study of the origins of flavor physics. The project combines the best features of a linear collider (high single-collision luminosity) and a storage-ring collider (high repetition rate), bringing together all accelerator physics aspects to make a very high luminosity of 10{sup 36} cm{sup -2} sec{sup -1}. This asymmetric-energy collider with a polarized electron beam will produce hundreds of millions of B-mesons at the {Upsilon}(4S) resonance. The present design is based on extremely low emittance beams colliding at a large Piwinski angle to allow very low {beta}*{sub y} without the need for ultra short bunches. Use of crab-waist sextupoles will enhance the luminosity, suppressing dangerous resonances and allowing for a higher beam-beam parameter. The project has flexible beam parameters, improved dynamic aperture, and spin-rotators in the Low Energy Ring for longitudinal polarization of the electron beam at the Interaction Point. Optimized for best colliding-beam performance, the facility may also provide high-brightness photon beams for synchrotron radiation applications.

43 PARTICLE ACCELERATORS↗

Vibration Budget for SuperB

We present a vibration budget for the SuperB accelerator. We include ground motion data, motion sensitivity of machine components, and beam feedback system requirements. The SuperB accelerator design attains at least 50 times higher than current B-factories due to smaller beam sizes and a crabbed waist crossing angle scheme at the IP (interaction point). The beam size (1{sigma}) at the IP will be about 10 {micro}m (horizontal) by 40 nm (vertical). These small beam sizes will make the luminosity very sensitive to mechanical vibration and electrical noise. Relative vertical misalignment of the two beams at the IP by only 8 nm will result in a 1% reduction in luminosity. The corresponding horizontal alignment tolerance of is 250x looser (2 {micro}m). The vertical beam angle at the IP for a 1% luminosity loss is fairly loose at 200 {micro}rad, and the horizontal beam angle tolerance is looser still. We will focus on vertical beam position at the IP, since this presents the greatest alignment challenge. The values presented here are for a closed orbit with tunes near a half-integer in the SuperB v.12 lattice.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

43 PARTICLE ACCELERATORS↗