Search NASA⌕ Search

Engineering topics

Jha, V.

Publications and source records attributed to Jha, V..

Performance of prototype GE1/1 chambers for the CMS muon spectrometer upgrade

The high-luminosity phase of the Large Hadron Collider (HL-LHC) will result in ten times higher particle background than measured during the first phase of LHC operation. In order to fully exploit the highly-demanding operating conditions during HL-LHC, the Compact Muon Solenoid (CMS) Collaboration will use Gas Electron Multiplier (GEM) detector technology. The technology will be integrated into the innermost region of the forward muon spectrometer of CMS as an additional muon station called GE1/1. The primary purpose of this auxiliary station is to help in muon reconstruction and to control level-1 muon trigger rates in the pseudo-rapidity region 1.6 ≤ |η| ≤ 2.2. The new station will contain trapezoidal-shaped GEM detectors called GE1/1 chambers. The design of these chambers is finalized, and the installation is in progress during the Long Shutdown phase two (LS-2) that started in 2019. Several full-size prototypes were built and operated successfully in various test beams at CERN. Here, we describe performance measurements such as gain, efficiency, and time resolution of these prototype chambers, developed after years of R&D, and summarize their behavior in different gas compositions as a function of the applied voltage.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NIRVSS Aboard CLPS

NASA initiated the Commercial Lunar Payload Services (CLPS) program for flights to the lunar surface. Astrobotic was awarded a NASA contract to accommodate NASA payloads onto their Peregrine lander Astrobotic Mission One (ABM-1). ABM-1 is scheduled to land near Lacus Mortis, 44°N 25°E, in 2021. The Near-InfraRed Volatile Spectrometer System (NIRVSS) has evolved over time and was chosen as a NASA payload for ABM-1 and the flight model is scheduled to be delivered to Astrobotic at the end of March 2020.

Roush, T.L.↗

Layout and assembly technique of the GEM chambers for the upgrade of the CMS first muon endcap station

Triple-GEM detector technology was recently selected by CMS for a part of the upgrade of its forward muon detector system as GEM detectors provide a stable operation in the high radiation environment expected during the future High-Luminosity phase of the Large Hadron Collider (HL-LHC). In a first step, GEM chambers (detectors) will be installed in the innermost muon endcap station in the 1.6<|η|<2.2 pseudo-rapidity region, mainly to control level-1 muon trigger rates after the second LHC Long Shutdown. These new chambers will add redundancy to the muon system in the η-region where the background rates are high, and the bending of the muon trajectories due to the CMS magnetic field is small. A novel construction technique for such chambers has been developed in such a way where foils are mounted onto a single stack and then uniformly stretched mechanically, avoiding the use of spacers and glue inside the active gas volume. We describe the layout, the stretching mechanism and the overall assembly technique of such GEM chambers.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Operational Experience With the GEM Detector Assembly Lines for the CMS Forward Muon Upgrade

The CMS Collaboration has been creating large-area triple-gas electron multiplier (GEM) detectors to be installed in the muon Endcap regions of the CMS experiment in 2019 to maintain forward muon trigger and tracking performance at the High-Luminosity upgrade of the Large Hadron Collider (LHC); 10 preproduction detectors were built at CERN to commission the first assembly line and the quality controls (QCs). These were installed in the CMS detector in early 2017 and participated in the 2017 LHC run. The collaboration has prepared several additional assembly and QC lines for distributed mass production of 160 GEM detectors at various sites worldwide. In 2017, these additional production sites have optimized construction techniques and QC procedures and validated them against common specifications by constructing additional preproduction detectors. Using the specific experience from one production site as an example, we report on how the QCs make use of independent hardware and trained personnel to ensure fast and reliable production. Preliminary results on the construction status of CMS GEM detectors are presented with details of the assembly sites involvement.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗