Search NASA⌕ Search

Engineering topics

Jing, Chunguang

Publications and source records attributed to Jing, Chunguang.

At least 19 records

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS↗

Summary of Working Group 7: Linear colliders

The contributions presented during the Working Group 7: Linear Colliders (WG7) sessions at the 2024 Advanced Accelerator Concepts Workshop are briefly summarized, as well as the discussions regarding a design initiative for a linear collider based on wakefield accelerator technology.

Advanced Accelerator Concepts↗

CW copper injector for SRF industrial cryomodules

Compact SRF industrial linacs can provide unique parameters of the beam (>1 MW and >1-10 MeV) hardly achievable by normal conducting linacs within limited space. SRF technology was prohibitively expensive until the development of conduction cooling which opened the way for compact stand alone SRF systems suitable for industrial and research applications. Limited cooling capacity puts strict requirements on the beam parameters with zero losses of the beam on the SRF cavity walls. This implies strict requirements on the beam energy to be accepted by the cryomodule and most importantly the beam bunching with zero particles in between. We designed a CW normal conducting RF injector which consists of a gridded RF gun integrated with a first cell of a copper booster cavity to satisfy these requirements. Here we present a complete design of a booster cavity including beam dynamics, RF, thermomechanical and engineering design.

43 PARTICLE ACCELERATORS↗

Low RF loss DC conductive ceramic for RF windows

Charging of RF windows has historically been problematic, frequently resulting in damage to the window severe enough that the window needs to be replaced. Many attempts have been made to prevent charging and therefore improve window lifetime, the most successful and common of which is coating the window with titanium nitride (TiN). Surface coatings such as TiN rely on the secondary electron yield of the coating material being lower than that of the ceramic window material, reducing the number of electrons emitted from a variety of mechanisms. An alternative approach is to introduce a small amount of DC conductivity to the ceramic itself, turning the traditionally insulating window into a mildly conductive one. This allows any charge on the surface of the window to drain rather than build until a discharge happens. A magnesium titanate ceramic has been developed with a small DC conductivity and used to make RF windows. Several window assemblies have been produced and tested, including 1.3 GHz waveguide and 650 MHz coaxial designs. The results of the conductive ceramic window test program will be presented.

43 PARTICLE ACCELERATORS↗

First conduction cooled photoinjector status

SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb3Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only 2W of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. We aim for generation of the first beam in 2024. In this paper, we present the most up-to-date progress including results of the first cool down of the gun-cavity in the newly developed conduction cooled cryomodule and LLRF system development.

43 PARTICLE ACCELERATORS↗

Towards Construction of a Novel Nanometer-Resolution MeV-STEM for Imaging Thick Frozen Biological Samples

Driven by life-science applications, a mega-electron-volt Scanning Transmission Electron Microscope (MeV-STEM) has been proposed here to image thick frozen biological samples as a conventional Transmission Electron Microscope (TEM) may not be suitable to image samples thicker than 300–500 nm and various volume electron microscopy (EM) techniques either suffering from low resolution, or low speed. The high penetration of inelastic scattering signals of MeV electrons could make the MeV-STEM an appropriate microscope for biological samples as thick as 10 μm or more with a nanoscale resolution, considering the effect of electron energy, beam broadening, and low-dose limit on resolution. The best resolution is inversely related to the sample thickness and changes from 6 nm to 24 nm when the sample thickness increases from 1 μm to 10 μm. To achieve such a resolution in STEM, the imaging electrons must be focused on the specimen with a nm size and an mrad semi-convergence angle. This requires an electron beam emittance of a few picometers, which is ~1000 times smaller than the presently achieved nm emittance, in conjunction with less than 10 -4 energy spread and 1 nA current. We numerically simulated two different approaches that are potentially applicable to build a compact MeV-STEM instrument: (1) DC (Direct Current) gun, aperture, superconducting radio-frequency (SRF) cavities, and STEM column; (2) SRF gun, aperture, SRF cavities, and STEM column. Beam dynamic simulations show promising results, which meet the needs of an MeV-STEM, a few-picometer emittance, less than 10 -4 energy spread, and 0.1–1 nA current from both options. Also, we designed a compact STEM column based on permanent quadrupole quintuplet, not only to demagnify the beam size from 1 μm at the source point to 2 nm at the specimen but also to provide the freedom of changing the magnifications at the specimen and a scanning system to raster the electron beam across the sample with a step size of 2 nm and the repetition rate of 1 MHz. This makes it possible to build a compact MeV-STEM and use it to study thick, large-volume samples in cell biology.

36 MATERIALS SCIENCE↗

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Characterization of transverse electron pulse trains using RF powered traveling wave metallic comb striplines

Advancements in ultrafast electron microscopy have allowed elucidation of spatially selective structural dynamics. However, as the spatial resolution and imaging capabilities have made progress, quantitative characterization of the electron pulse trains has not been reported at the same rate. In fact, inexperienced users have difficulty replicating the technique because only a few dedicated microscopes have been characterized thoroughly. Systems replacing laser driven photoexcitation with electrically driven deflectors especially suffer from a lack of quantified characterization because of the limited quantity. The primary advantages to electrically driven systems are broader frequency ranges, ease of use and simple synchronization to electrical pumping. Here, we characterize the technical parameters for electrically driven UEM including the shape, size and duration of the electron pulses using low and high frequency chopping methods. At high frequencies, pulses are generated by sweeping the electron beam across a chopping aperture. For low frequencies, the beam is continuously forced off the optic axis by a DC potential, then momentarily aligned by a countering pulse. Using both methods, we present examples that measure probe durations of 2 ns and 10 ps for the low and high frequency techniques, respectively. Here, we also discuss how the implementation of a pulsed probe affects STEM imaging conditions by adjusting the first condenser lens.

36 MATERIALS SCIENCE↗

Nb$_{3}$Sn SRF Photogun High Power Test at Cryogenic Temperatures

Superconducting RF (SRF) photoguns are emerging as promising candidates to produce highly stable electrons for Ultra fast Electron Diffraction/Microscopy (EUD/UEM) applications due to the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb 3 Sn and conduction cooling. SRF gun can provide a CW operation capability while consuming only several Watts of RF power which eliminates the need of an expensive high power RF system and saves a facility footprint. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. Here, in this paper, we present first high power results of the gun covered with Nb 3 Sn.

43 PARTICLE ACCELERATORS↗

First High-Gradient Results of UED/UEM SRF Gun at Cryogenic Temperatures

Benefiting from the rapid progress on RF photogun technologies in the past two decades, the development of MeV range ultrafast electron diffraction/microscopy (UED and UEM) has been identified as an enabling instrumentation. UEM or UED use low power electron beams with modest energies of a few MeV to study ultrafast phenomena in a variety of novel and exotic materials. SRF photoguns become a promising candidate to produce highly stable electrons for UEM/UED applications because of the ultrahigh shot-to-shot stability compared to room temperature RF photoguns. SRF technology was prohibitively expensive for industrial use until two recent advancements: Nb₃Sn and conduction cooling. The use of Nb₃Sn allows to operate SRF cavities at higher temperatures (4K) with low power dissipation which is within the reach of commercially available closed-cycle cryocoolers. Euclid is developing a continuous wave (CW), 1.5-cell, MeV-scale SRF conduction cooled photogun operating at 1.3 GHz. In this paper, we present first high gradient results of the gun conducted in liquid helium.

43 PARTICLE ACCELERATORS↗

Demonstration of sub-GV/m accelerating field in a photoemission electron gun powered by nanosecond 𝑋-band radio-frequency pulses

Radio-frequency (rf) photoemission electron guns operating at higher accelerating gradients offer a pathway to produce brighter electron bunches. Brighter beams are expected to revolutionize many areas of science: they could form the backbone of next-generation compact x-ray free-electron lasers or provide coherent ultrafast quantum electron probes. We report on the experimental demonstration of an rf photoemission electron source supporting an accelerating field close to 400 MV/m at the photocathode surface without major rf breakdown or significant dark current over a 3-week experimental run. This unprecedented gradient was achieved by operating the gun in a new regime with short rf pulses, ~9ns X-band (11.7 GHz). The demonstrated paradigm provides a viable path to form relativistic electron beams with unprecedented brightness.

43 PARTICLE ACCELERATORS↗

Toward Emittance Measurements at 11.7 GHz Short-Pulse High-Gradient RF Gun

A short pulse high gradient RF gun has been recently tested at Argonne Wakefield Accelerator (AWA) facility. The carried-out test showed that the 1,5-cell gun was able to inject 3 MeV, up to 100 pC bunches at room tem-perature being fed by 9 ns up to 300 MW 11.7 GHz puls-es. The cathode field was as high as about 400 MV/m. So high field is aimed to mitigate repealing Coulomb forces substantially. In accordance with simulations the emit-tance could be as low as less than 0.2 mcm. To obtain so low emittance in the experiment, the gun is assumed to be equipped with a downstream linac to be fed from the same power extractor as the gun itself. Here we report design of the RF power distribution system splitting RF power among the gun and the linac, results of low-power tests, and emittance measurement plans for upcoming new experiment at AWA.

43 PARTICLE ACCELERATORS↗