Search NASA⌕ Search

Engineering topics

Johns, Kevin C.

Publications and source records attributed to Johns, Kevin C..

Design and structural assessment of the Spallation Neutron Source 2.0 MW target

The Proton Power Upgrade (PPU) project is underway at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory. The project will double the proton accelerator power from 1.4 MW to 2.8 MW, increase power to the First Target Station (FTS), and enable a future Second Target Station (STS). The power increase partly comes from raising proton energy from 1.0 GeV to 1.3 GeV. The STS will operate at 0.7 MW at 15 Hz when completed. Until then, PPU will provide the capability to operate the FTS at 2.0 MW at 60 Hz. Maximum power at the FTS to date has been 1.4 MW at 60 Hz with 1.0 GeV protons. A new mercury target module design to operate reliably under PPU conditions has been completed after a multi-year effort. The design philosophy and assessment of the structural analysis are described here. This target underwent an unprecedented design and analysis process for SNS using the latest engineering techniques and incorporating years of operating lessons and outcomes from R&D to meet structural design criteria. Finally, it also incorporates high-flow gas injection to further mitigate pulse fatigue stresses as well as cavitation damage to the mercury vessel.

47 OTHER INSTRUMENTATION↗

Bubble Generation in the SNS 2 MW Mercury Target

The accelerator at the Spallation Neutron Source is currently being upgraded to increase the proton beam power from 1.4 MW to 2.8 MW. About 2 MW will go to the first target station, while the rest will go to the future second target station. The first target station uses a mercury target. When the short proton beam pulse hits it, strong pressure waves are developed inside the mercury and the vessel itself, causing weld failures and cavitation erosion. The pressure wave can be significantly mitigated by injecting small helium bubbles into the mercury. SNS has been injecting helium since 2017 using small orifices but has met challenges in fabrication and operations with them. Thus, for the 2 MW target, swirl bubblers will be used to increase gas injection and improve reliability. A 2 MW prototypical target was built and tested in a mercury process loop available at Oak Ridge National Laboratory. Acrylic viewports on the top of the target were used to determine the bubble size distribution (BSD) generated by the swirl bubblers. It was found that the bubblers were not only capable of generating small bubbles but that the BSD was independent of gas injection rate.

Barbier, Charlotte↗

Fatigue analysis of the Spallation Neutron Source 2 MW target design

Upgrades to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory are under way with two major projects. The first project is the Proton Power Upgrade (PPU), which will double the power capacity of the SNS accelerator system to enable the operation of a future second neutron source target station—the second project. PPU also will increase power to the SNS first target station – which currently operates at 1.4 MW with 1.0 GeV protons – to 2 MW with 1.3 GeV protons. Final design of the PPU 2 MW target module is finished, including all necessary design and analysis calculations. The fatigue evaluation described herein is an assessment of the fitness of the PPU 2 MW target mercury vessel to resist failure from cyclic loading from the pulsed 60 Hz proton beam and thermal changes from disrupted operation. In addition to the reliability predictions, the method, detail, and depth of this fatigue evaluation are superior to those of past target design assessments. Furthermore, the thermal fatigue life is predicted to exceed 3125 thermal cycles per 1250 h of operation for all load cases. The design also meets the (relative) fatigue design goal for combined thermal and pulse loading of greater than 0.5 times the minimum fatigue life calculated for a jet-flow target design operating at 1.4 MW—the most robust design to date in terms of resistance to fatigue failure. From the onset of the PPU, it has been known that pulse loading requires effective application of helium gas injection into the target mercury to reduce beam pressure loading. For the PPU 2 MW target, none of the pulse load cases requires a maximum strain reduction from gas injection of more than 50% (for base material) to meet the fatigue design goal. This level of reduction is achievable from gas injection, according to historical strain measurements from 1.4 MW target operation. Overall, the PPU 2 MW target design is predicted to have superior resistance to fatigue failure compared with past target designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗