Search NASA⌕ Search

Engineering topics

Johnson, Christian

Publications and source records attributed to Johnson, Christian.

SOCRATES

SOCRATES is a Suite Of Comprehensive Rapid Analysis Tools for Environmental Sites. It provides tools to retrieve, filter, select, and view Hanford data and to perform multiple types of data analyses. SOCRATES currently includes four data analytics modules

Royer, Patrick↗

Direct detection of primordial black hole relics as dark matter

If dark matter is composed of primordial black holes, such black holes can span an enormous range of masses. A variety of observational constraints exist on massive black holes, and black holes with masses below 10 15 g are often assumed to have completely evaporated by the present day. But if the evaporation process halts at the Planck scale, it would leave behind a stable relic, and such objects could constitute the entirety of dark matter. Neutral Planck-scale relics are effectively invisible to both astrophysical and direct detection searches. However, we argue that such relics may typically carry electric charge, making them visible to terrestrial detectors. We evaluate constraints and detection prospects in detail, and show that if not already ruled out by monopole searches, this scenario can be largely explored within the next decade using existing or planned experimental equipment. A single detection would have enormous implications for cosmology, black hole physics, and quantum gravity.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Technical Evaluation of Iodine Remediation for 200-UP-1 - 16379

From the 1940's through the 1990's, liquid wastes from materials used and produced at the Hanford Site were disposed to the ground through cribs, ditches, ponds, and trenches. The major sources that contributed to groundwater contamination within the 200-UP-1 Operable Unit (OU) were associated with plutonium-separation and uranium recovery operations at the S Plant and U Plant facilities, as well groundwater migration from 200-ZP-1 OU. Iodine-129 is present in the groundwater and vadose zone beneath the 200-UP-1 OU, and is one of the primary risk drivers for the site. Hydraulic containment is the currently selected remedy for I-129 in the groundwater. There is currently no remedy selected for controlling migration of I-129 from the vadose zone to the groundwater. A UP-1 Evaluation Plan for I-129 was developed to provide the scientific and technical understanding necessary for developing remediation approaches for I-contaminated groundwater as well as risk-based approaches for managing I-129 present in the vadose zone. A site conceptual model for understanding the biogeochemical drivers for iodine speciation and determine the processes that drive the fate and transport of I-129 through the vadose zone and into groundwater was included. These data will provide the information to decrease the uncertainty related to the inventory, distribution, and transport properties which will lead to appropriate treatment strategies for the I-129 plume(s). A wide range of technologies and approaches are being evaluated including consideration of removal, cost, and long-term impacts to the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Endpoint Evaluation for 200-PW-1 Operable Unit Soil Vapor Extraction, Hanford Site, Washington - 16478

On the Central Plateau of the Hanford Site in semi-arid southeast Washington State, the 216-Z-9 Trench, 216-Z-1A Tile Field, and 216-Z-18 Crib were used from 1955 to 1973 for soil column disposal of liquid wastes containing carbon tetrachloride. The geological setting underneath these disposal areas consists of an approximately 70 m thick vadose zone with a nominally 5 m thick low-permeability layer at a depth of 30 m. Infiltration of the liquid waste through the vadose zone to the groundwater was driven by the liquid volume introduced during disposal. Carbon tetrachloride readily volatilises in the vadose zone, making soil vapor extraction (SVE) the preferred remediation technology. Between 1992 and 2012, SVE recovered 80,107 kg of carbon tetrachloride from the vadose zone below the three waste sites. Of this total recovery, 93 percent was removed during the first 5 years of operations. The last 7 percent was recovered in the last 16 years of operation. In 2011, a final cleanup level of 100 ppmv for carbon tetrachloride in soil vapor was established in the record of decision for the 200-PW-1 Operable Unit, which includes the three carbon tetrachloride waste sites. The final cleanup decision specified that soil vapor concentrations and the cleanup level would be further refined and assessed in the future to ensure groundwater protection. A subsequent treatability test was conducted and the results were used to further refine the definition of vadose zone source conditions that are protective of groundwater. Based on this treatability test, predictions indicate that current and future vadose zone conditions will meet groundwater protection objectives. SVE operations were not performed in 2013, 2014, and 2015, and soil vapor concentrations in all SVE wells (and all but two monitoring probes installed using direct-push technology) remained below the 100 ppmv cleanup level during this time. SVE endpoint guidance was prepared in 2013 as a joint effort between Pacific Northwest National Laboratory, U.S. Army Corps of Engineers, and U.S. Environmental Protection Agency. This SVE guidance was used to develop a path forward for the 200-PW-1 Operable Unit SVE remedy. The guidance asks the following questions: 1. Are data collected to date adequate to support a well-defined conceptual site model? 2. Have remediation goals (cleanup levels) been defined? 3. Are environmental pathways and risk understood well enough to support site closeout? 4. Will remaining contamination in the vadose zone cause groundwater cleanup levels to be exceeded? If the answer to the first three questions is 'Yes', and the answer to the fourth question is 'No', then the site is ready for closure. At this time, the site has compiled appropriate information to answer these questions to support a remedy decision to terminate SVE operations. The U.S. Environmental Protection Agency recently provided concurrence that termination of SVE operations within the 200-PW-1 Operable Unit is appropriate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Frozen Soil Barrier to Control Groundwater Inflow into Damaged Reactors at the Fukushima Daiichi Nuclear Power Station - 16613

Reactor buildings and support facilities at the Fukushima Daiichi Nuclear Power Station (F1 Site) were damaged by a March 2011 tsunami. In response, the Tokyo Electric Power Company (TEPCO) is implementing a number of countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of environmental protection. In general, the strategy represents an example of a 'defense in depth' concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area, reduce the amount of water entering damaged reactors, and reduce the resulting volume of contaminated water that requires treatment and storage. The frozen soil barrier was designed and installed by a team from TEPCO and Kajima Corporation. A group of scientists and engineers from US Department of Energy National Laboratories provided independent evaluation of the frozen barrier design and operational plans along with technical recommendations to the TEPCO team. The frozen soil barrier design extends to about 30 m depth; the bottom of the barrier is in a low permeability interval, and the total barrier length around the reactors is just over 1.5 km. The barrier required 1927 total boreholes: 1568 for freeze pipes plus 359 for temperature monitoring arrays. Drilling of all of the boreholes was completed November 9, 2015. Construction of the refrigeration plant is complete and all of the above ground piping/manifolds are in the final stages of construction. The DOE laboratory independent assessment of the frozen soil barrier concluded that the technical characteristics of a frozen barrier are relatively well suited to Fukushima-specific hydrogeologic conditions and the need for reducing the inflow of water into damaged reactors at the F1 Site. The scale of the Fukushima barrier is bounded by industry experience and the equipment and infrastructure proposed for the ground freezing is well understood. The on-site pilot test at Fukushima indicated predictable ground freezing and supported the full scale design parameters. These factors increase the confidence in the frozen soil barrier project underway at Fukushima. TEPCO is currently working with the Japanese Nuclear Regulatory Authority (NRA), providing operational plans/strategies for the frozen soil barrier and modeling results of the projected performance. Full scale frozen soil barrier operations are to begin after authorization from NRA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗