Search NASASearch

Engineering topics

Johnson, P. J.

Publications and source records attributed to Johnson, P. J..

The In-Orbit Battery Reconditioning Experience On Board the Orion 1 Spacecraft

The Orion 1 spacecraft is a three-axis stabilized geostationary earth orbiting commercial communications satellite which was launched on November 29, 1994 aboard an Atlas II launch vehicle. The power subsystem is a dual bus, dual battery semi-regulated system with one 78 Ampere-hour nickel-hydrogen battery per bus. The batteries were built and tested by Eagle Picher Industries, Inc., of Joplin, MO and were integrated into the spacecraft by its manufacturer, Matra Marconi Space UK Ltd. This paper presents the results obtained during the first four in-orbit reconditioning cycles and compares the battery performance to ground test data. In addition, the on-station battery management strategy and implementation constraints are described. Battery performance has been nominal throughout each reconditioning cycle and subsequent eclipse season.

Hoover, S. A.

Battery performance of the SKYNET 4A spacecraft during the first six years of on station operation

The SKYNET 4A spacecraft is a three-axis stabilized geostationary earth-orbiting military communications satellite which was launched on 1 Jan. 1990 aboard a Titan 3 launch vehicle. The power subsystem is a twin bus, twin battery semi-regulated system and is equipped with one 28-cell, 35 Ampere-hour battery per bus. The cells were manufactured by Gates Aerospace Batteries of Gainesville, FL, and the batteries were built, tested and integrated by British Aerospace Space Systems Ltd. This paper presents a brief survey of the first six years of on-station operation and the operational battery management strategy that has been adopted. Thermal management constraints have led to an unconventional battery operational regime. However, no sign of degradation is evident and the observed spacecraft battery performance remains nominal.

Johnson, P. J.