Multi-Objective Multi-User Scheduling for Space Science Missions

We have developed an architecture called MUSE (Multi-User Scheduling Environment) to enable the integration of multi-objective evolutionary algorithms with existing domain planning and scheduling tools. Our approach is intended to make it possible to re-use existing software, while obtaining the advantages of multi-objective optimization algorithms. This approach enables multiple participants to actively engage in the optimization process, each representing one or more objectives in the optimization problem. As initial applications, we apply our approach to scheduling the James Webb Space Telescope, where three objectives are modeled: minimizing wasted time, minimizing the number of observations that miss their last planning opportunity in a year, and minimizing the (vector) build up of angular momentum that would necessitate the use of mission critical propellant to dump the momentum. As a second application area, we model aspects of the Cassini science planning process, including the trade-off between collecting data (subject to onboard recorder capacity) and transmitting saved data to Earth. A third mission application is that of scheduling the Cluster 4-spacecraft constellation plasma experiment. In this paper we describe our overall architecture and our adaptations for these different application domains. We also describe our plans for applying this approach to other science mission planning and scheduling problems in the future.

science planning↗

Deep Space Network Scheduling Using Multi-Objective Optimization with Uncertainty

We have developed a novel technique to incorporate uncertainty modeling within an evolutionary algorithm approach to multi-objective scheduling, with the goal of identifying a Pareto frontier (tradeoff curve) that recognizes the likelihood of events that can impact the schedule outcome. Our approach is particularly applicable to the generation of multiobjective optimized robust schedules, where objectives are assigned a service level, for example that we require an objective value to be greater than or equal to X with Y% confidence. We have demonstrated that such an approach can, for example, minimize scheduling on less reliable resources, based solely on a resource reliability model and not on any ad hoc heuristics. We have also investigated an alternative method of optimizing for robustness, in which we add to the set of objectives a failure risk objective to minimize. We compare the advantages and disadvantages of these two approaches. Future plans for further developing this technology include its application to space-based observatory scheduling problems.

Johnston, Mark D.↗

Integrated Planning for Telepresence with Time Delays

Teleoperation of remote robotic systems over time delays in the range of 2-10 seconds poses a unique set of challenges. In the context of a supervisory control system for the JSC Robonaut humanoid robot, we have developed an 'intelligent assistant' that integrates an Artificial Intelligence planner (JSHOP2) with execution monitoring of the state of both the human supervisor and the remote robot. The assistant reasons simultaneously about the world state on both sides of the time delay, which represents a novel application of this technology. The purpose of the assistant is to provide advice to the human supervisor about current and future activities, derived from a sequence of high-level goals to be achieved. To do this, the assistant must simultaneously monitor and react to various data sources, including actions taken by the supervisor who is issuing commands to the robot (e.g. with a data glove), actions taken by the robot, and the environment of the robot, both as currently perceived over the time delay, along with the current sequence of goals. We have developed a 'leader/follower' software architecture to handle the dual time-shifted streams of execution feedback. In this paper we describe the integrated planner and its executive, and how it operates in normal and anomaly situations.

remote robotic systems↗

Integrated Planning for Telepresence with Time Delays

Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.

teleoperation↗

Optimizing observing sequence design for periodic and non-periodic phenomena : a Bayesian approach

In this paper we report on our progress on addressing these issues. We have developed an approximate expression for the uniformity of phase coverage that can be used when scheduling to assess candidate sample times. We describe the results obtained using this estimator, and compare them with detailed simulations. We describe our progress and plans for integrating optimizing criteria for both periodic and non-periodic observations into a single observation sequence.

Bayesian↗

Automating Deep Space Network scheduling and conflict resolution

The Deep Space Network (DSN) is a central part of NASA's infrastructure for communicating with active space missions, from earth orbit to beyond the solar system. We describe our recent work in modeling the complexities of user requirements, and then scheduling and resolving conflicts on that basis. We emphasize our innovative use of background 'intelligent' assistants' that carry out search asynchrnously while the user is focusing on various aspects of the schedule.

conflict resolution↗

Development of an expert data reduction assistant

We propose the development of an expert system tool for the management and reduction of complex datasets. the proposed work is an extension of a successful prototype system for the calibration of CCD (charge coupled device) images developed by Dr. Johnston in 1987. (ref.: Proceedings of the Goddard Conference on Space Applications of Artificial Intelligence). The reduction of complex multi-parameter data sets presents severe challenges to a scientist. Not only must a particular data analysis system be mastered, (e.g. IRAF/SDAS/MIDAS), large amounts of data can require many days of tedious work and supervision by the scientist for even the most straightforward reductions. The proposed Expert Data Reduction Assistant will help the scientist overcome these obstacles by developing a reduction plan based on the data at hand and producing a script for the reduction of the data in a target common language.

Miller, Glenn E.↗

Spike: AI scheduling for Hubble Space Telescope after 18 months of orbital operations

This paper is a progress report on the Spike scheduling system, developed by the Space Telescope Science Institute for long-term scheduling of Hubble Space Telescope (HST) observations. Spike is an activity-based scheduler which exploits artificial intelligence (AI) techniques for constraint representation and for scheduling search. The system has been in operational use since shortly after HST launch in April 1990. Spike was adopted for several other satellite scheduling problems; of particular interest was the demonstration that the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. We describe the recent progress made in scheduling search techniques, the lessons learned from early HST operations, and the application of Spike to other problem domains. We also describe plans for the future evolution of the system.

Johnston, Mark D.↗

An extended abstract: A heuristic repair method for constraint-satisfaction and scheduling problems

The work described in this paper was inspired by a surprisingly effective neural network developed for scheduling astronomical observations on the Hubble Space Telescope. Our heuristic constraint satisfaction problem (CSP) method was distilled from an analysis of the network. In the process of carrying out the analysis, we discovered that the effectiveness of the network has little to do with its connectionist implementation. Furthermore, the ideas employed in the network can be implemented very efficiently within a symbolic CSP framework. The symbolic implementation is extremely simple. It also has the advantage that several different search strategies can be employed, although we have found that hill-climbing methods are particularly well-suited for the applications that we have investigated. We begin the paper with a brief review of the neural network. Following this, we describe our symbolic method for heuristic repair.

Minton, Steven↗

Development of an expert data reduction assistant

We propose the development of an expert system tool for the management and reduction of complex data sets. The proposed work is an extension of a successful prototype system for the calibration of CCD images developed by Dr. Johnston in 1987. The reduction of complex multi-parameter data sets presents severe challenges to a scientist. Not only must a particular data analysis system be mastered, (e.g. IRAF/SDAS/MIDAS), large amounts of data can require many days of tedious work and supervision by the scientist for even the most straightforward reductions. The proposed Expert Data Reduction Assistant will help the scientist overcome these obstacles by developing a reduction plan based on the data at hand and producing a script for the reduction of the data in a target common language.

Miller, Glenn E.↗

The application of artificial intelligence to astronomical scheduling problems

Efficient utilization of expensive space- and ground-based observatories is an important goal for the astronomical community; the cost of modern observing facilities is enormous, and the available observing time is much less than the demand from astronomers around the world. The complexity and variety of scheduling constraints and goals has led several groups to investigate how artificial intelligence (AI) techniques might help solve these kinds of problems. The earliest and most successful of these projects was started at Space Telescope Science Institute in 1987 and has led to the development of the Spike scheduling system to support the scheduling of Hubble Space Telescope (HST). The aim of Spike at STScI is to allocate observations to timescales of days to a week observing all scheduling constraints and maximizing preferences that help ensure that observations are made at optimal times. Spike has been in use operationally for HST since shortly after the observatory was launched in Apr. 1990. Although developed specifically for HST scheduling, Spike was carefully designed to provide a general framework for similar (activity-based) scheduling problems. In particular, the tasks to be scheduled are defined in the system in general terms, and no assumptions about the scheduling timescale are built in. The mechanisms for describing, combining, and propagating temporal and other constraints and preferences are quite general. The success of this approach has been demonstrated by the application of Spike to the scheduling of other satellite observatories: changes to the system are required only in the specific constraints that apply, and not in the framework itself. In particular, the Spike framework is sufficiently flexible to handle both long-term and short-term scheduling, on timescales of years down to minutes or less. This talk will discuss recent progress made in scheduling search techniques, the lessons learned from early HST operations, the application of Spike to other problem domains, and plans for the future evolution of the system.

Johnston, Mark D.↗

SPIKE: AI scheduling techniques for Hubble Space Telescope

AI (Artificial Intelligence) scheduling techniques for HST are presented in the form of the viewgraphs. The following subject areas are covered: domain; HST constraint timescales; HTS scheduling; SPIKE overview; SPIKE architecture; constraint representation and reasoning; use of suitability functions by scheduling agent; SPIKE screen example; advantages of suitability function framework; limiting search and constraint propagation; scheduling search; stochastic search; repair methods; implementation; and status.

Johnston, Mark D.↗

The min-conflicts heuristic: Experimental and theoretical results

This paper describes a simple heuristic method for solving large-scale constraint satisfaction and scheduling problems. Given an initial assignment for the variables in a problem, the method operates by searching through the space of possible repairs. The search is guided by an ordering heuristic, the min-conflicts heuristic, that attempts to minimize the number of constraint violations after each step. We demonstrate empirically that the method performs orders of magnitude better than traditional backtracking techniques on certain standard problems. For example, the one million queens problem can be solved rapidly using our approach. We also describe practical scheduling applications where the method has been successfully applied. A theoretical analysis is presented to explain why the method works so well on certain types of problems and to predict when it is likely to be most effective.

Minton, Steven↗

Data reduction expert assistant

Viewgraphs on data reduction expert assistant are presented. Topics covered include: data analysis systems; philosophy of these systems; disadvantages; expert assistant; useful goals; and implementation considerations.

Miller, Glenn E.↗

An approach to rescheduling activities based on determination of priority and disruptivity

A constraint-based scheduling system called SPIKE is being used to create long term schedules for the Hubble Space Telescope. Feedback for the spacecraft or from other ground support systems may invalidate some scheduling decisions and those activities concerned must be reconsidered. A function rescheduling priority is defined which for a given activity performs a heuristic analysis and produces a relative numerical value which is used to rank all such entities in the order that they should be rescheduled. A function disruptivity is also defined that is used to place a relative numeric value on how much a pre-existing schedule would be changed in order to reschedule an activity. Using these functions, two algorithms (a stochastic neural network approach and an exhaustive search approach) are proposed to find the best place to reschedule an activity. Prototypes were implemented and preliminary testing reveals that the exhaustive technique produces only marginally better results at much greater computational cost.

Sponsler, Jeffrey L.↗

Learning in stochastic neural networks for constraint satisfaction problems

Researchers describe a newly-developed artificial neural network algorithm for solving constraint satisfaction problems (CSPs) which includes a learning component that can significantly improve the performance of the network from run to run. The network, referred to as the Guarded Discrete Stochastic (GDS) network, is based on the discrete Hopfield network but differs from it primarily in that auxiliary networks (guards) are asymmetrically coupled to the main network to enforce certain types of constraints. Although the presence of asymmetric connections implies that the network may not converge, it was found that, for certain classes of problems, the network often quickly converges to find satisfactory solutions when they exist. The network can run efficiently on serial machines and can find solutions to very large problems (e.g., N-queens for N as large as 1024). One advantage of the network architecture is that network connection strengths need not be instantiated when the network is established: they are needed only when a participating neural element transitions from off to on. They have exploited this feature to devise a learning algorithm, based on consistency techniques for discrete CSPs, that updates the network biases and connection strengths and thus improves the network performance.

Johnston, Mark D.↗

Automated observation scheduling for the VLT

It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

Johnston, Mark D.↗