Accumulator Ring Beam Optics [Poster]
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Johnstone, John A..
Explore the source record for details and available documents.
In foil stripping of H⁻ some fraction of the emerging neutral H⁰ will be in excited states, which can then strip through the Stark effect in the magnetic field of the downstream orbit bump magnet. The resultant H⁺ will experience a depleted net kick compared to protons emerging from the foil and will track on trajectories different from the nominal circulating beam. This will lead to irradiation of downstream machine components. An analysis of these processes is of particular importance looking forward to the much higher beam power of the Fermilab PIP-II era. This study investigates where these errant protons will be lost, how much power is deposited, and whether this will be a shielding concern.
This paper investigates the feasibility of re-purposing the MuCool Test Area (MTA) beamline and experimental hall to support a Muon Spin Resonance (MuSR) facility, which would make it the only such facility in the US. This report reviews the basic muon production concepts studied and operationally implemented at TRIUMF, PSI, and RAL and their application in the context of the MTA facility. Two scenarios were determined feasible. One, an initial minimal-shielding and capital-cost investment stage with a single secondary muon beamline that utilizes an existing high- intensity beam absorber and, another, upgraded stage, that implements an optimized production target pile, a proximate high-intensity absorber, and optimized secondary muon lines. A unique approach is proposed which chops or strips a macropulse of H$^-$ beam into a micropulse substructure – a muon creation timing scheme – which allows Muon Spin Resonance experiments in a linac environment. With this timing scheme, and attention to target design and secondary beam collection, the MTA can host enabling and competitive Muon Spin Resonance experiments.
This paper investigates the feasibility of re-purposing the MuCool Test Area beamline and experimental hall to support a Muon Spin Resonance facility, which would make it the only such facility in the US. This report reviews the basic muon production concepts studied and operationally implemented at TRIUMF, PSI, and RAL and their application to the MTA facility. Two scenarios were determined feasible. One represents an initial minimal-shielding and capital-cost investment stage with a single secondary muon beamline that transports the primary beam to an existing high-intensity beam absorber located outside of the hall. Another, upgraded stage, involves an optimized production target pile and high-intensity absorber installed inside the experimental hall and potentially multiple secondary muon lines. In either scenario, with attention to target design, the MTA can host enabling and competitive Muon Spin Resonance experiments
For the Long Baseline Neutrino Experiment (LBNE) at Fermilab 120 GeV/c protons will be transported from the Main Injector (MI) to an on-site production target. The lattice design and optics discussed here has the beam extracted vertically upwards from MI-10 and the keeps the majority of the line at an elevation above the glacial till/rock interface and terminates on a target at 10 ft above grade. The LBNE beamline discussed here is a modular optics design comprised of 3 distinct lattice configurations, including the specialized MI {yields} LBNE matching section and Final Focus. The remainder of the line is defined by six FODO cells, in which the length and phase advance are chosen specifically such that beam size does not exceed that of the MI while also making the most efficient use of space for achromatic insertions. Dispersion generated by variations in the beam trajectory are corrected locally and can not bleed out to corrupt the optics elsewhere in the line. Aperture studies indicate that the line should be able to transport the worst quality beam that the Main Injector might provide. New IDS dipole correctors located at every focusing center provide high-quality orbit control and further ensure that LBNE meets the stringent requirements for environmental protection.