RF Test Results from Cryomodule 1 at the Fermilab SRF Beam Test Facility

Powered operation of Cryomodule 1 (CM-1) at the Fermilab SRF Beam Test Facility began in late 2010. Since then a series of tests first on the eight individual cavities and then the full cryomodule have been performed. We report on the results of these tests and lessons learned which will have an impact on future module testing at Fermilab. Since November 2010 Cryomodule 1 has been operating at 2 Kelvin. After evaluating each of the eight cavities while individually powered, the entire module has recently been powered and peak operation determined as shown in Figure 4. Several more weeks of measurements are planned before the module is warmed up, removed and replaced with Cryomodule 2 now under assembly at Fermilab.

43 PARTICLE ACCELERATORS↗

First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab

In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, {beta} = 0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Q{sub ext} test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Q{sub ext} {approx} 10{sup 6} was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.

43 PARTICLE ACCELERATORS↗

Space charge measurements with a high intensity bunch at the Fermilab Main Injector

For Project X, the Fermilab Main Injector will be required to operate with 3 times higher bunch intensity. The plan to study the space charge effects at the injection energy with intense bunches will be discussed. A multi-MW proton facility has been established as a critical need for the U.S. HEP program by HEPAP and P5. Utilization of the Main Injector (MI) as a high intensity proton source capable of delivering in excess of 2 MW beam power will require a factor of three increase in bunch intensity compared to current operations. Instabilities associated with beam loading, space charge, and electron cloud effects are common issues for high intensity proton machines. The MI intensities for current operations and Project X are listed in Table 1. The MI provides proton beams for Fermilab's Tevatron Proton-Antiproton Collider and MINOS neutrino experiments. The proposed 2MW proton facility, Project X, utilizes both the Recycler (RR) and the MI. The RR will be reconfigured as a proton accumulator and injector to realize the factor 3 bunch intensity increase in the MI. Since the energy in the RR and the MI at injection will be 6-8 GeV, which is relatively low, space charge effects will be significant and need to be studied. Studies based on the formation of high intensity bunches in the MI will guide the design and fabrication of the RF cavities and space-charge mitigation devices required for 2 MW operation of the MI. It is possible to create the higher bunch intensities required in the MI using a coalescing technique that has been successfully developed at Fermilab. This paper will discuss a 5 bunch coalescing scheme at 8 GeV which will produce 2.5 x 10{sup 11} protons in one bunch. Bunch stretching will be added to the coalescing process. The required RF parameters were optimized with longitudinal simulations. The beam studies, that have a goal of 85% coalescing efficiency, were started in June 2010.

43 PARTICLE ACCELERATORS↗

LLRF design for the HINS-SRF test facility at Fermilab

The High Intensity Neutrino Source (HINS) R&D program requires super conducting single spoke resonators operating at 325 MHz (SSR1). After coupler installation, these cavities are tested at the HINS-SRF facility at Fermilab. The LLRF requirements for these tests include support for continuous wave and pulsed mode operations, with the ability to track the resonance frequency of the tested cavity. Real-time measurement of the cavity loaded Q and Q{sub 0} are implemented using gradient decay techniques, allowing for Q{sub 0} versus E{sub acc} plots. A real time cavity simulator was also developed to test the LLRF system and verify its functionality.

43 PARTICLE ACCELERATORS↗

Progress in Multi-Batch Slip Stacking in the Fermilab Main Injector and Future Plans

The multi-batch slip stacking has been used for operations since January, 2008 and effectively increased proton intensity to the NuMI target by 50% in a Main Injector (MI) cycle. The MI accepts 11 batches at injection energy from the Booster, and sends two batches to antiproton production and nine to the NuMI beam line. The total beam power in a cycle was increased to 340 kW on average. We have been doing beam studies in order to increase the beam power to 400 kW and to control the beam loss. We will also discuss 12 batch slip stacking scheme which is going to be used for future neutrino experiments.

43 PARTICLE ACCELERATORS↗

The ILC global control system.

The scale and performance parameters of the ILC require new thinking in regards to control system design. This design work has begun quite early in comparison to most accelerator projects, with the goal of uniquely high overall accelerator availability. Among the design challenges are high control system availability, precision timing and rf phase reference distribution, standardizing of interfaces, operability, and maintainability. We present the current state of the design and take a prospective look at ongoing research and development projects.