Search NASA⌕ Search

Engineering topics

Jones, Drew

Publications and source records attributed to Jones, Drew.

Charting a course to the sun: flight path control for Parker Solar Probe

The successful launch of the Parker Solar Probe (PSP) on August 12, 2018 with a Delta IV rocket and Star-48BV third stage has placed the spacecraft on a 7-year trajectory to study the Sun. The goals of PSP are to better characterize our solar environment and advance our understanding of the Sun at 9.86 Rs. A total of 42 trajectory correction maneuvers are planned. This paper documents trajectory correction maneuver analysis performed just prior to launch until just past the first solar encounter. The pre-launch analysis culminated in two final design cycles which analyzed 24 reference trajectories.

Ryne, Mark↗

Flight Path Control Analysis for Parker Solar Probe

An unprecedented NASA mission to study the Sun, known as Parker Solar Probe (PSP), is under development. The primary objective of the PSP mission is to gather new data within 10 solar radii of the Sun’s center. The purpose of this paper is to review the statistical analysis of trajectory correction maneuvers (TCMs) for PSP’s baseline trajectory. The baseline mission includes a total of 42 TCMs that will be accomplished with a monopropellant propulsion system that consists of twelve 4.4 N thrusters. Assuming current navigation models, statistical analyses for each reference trajectory during the 20-day launch period result in a total V99 of less than 100 m/s.

Mottinger, Neil↗

Parker Solar Probe Navigation: one year from launch

Parker Solar Probe (PSP) will be the first spacecraft designed to fly deep within the Sun’s lower corona and also becoming the fastest spacecraft flown. Launch is scheduled for next year, with a 20-day launch period beginning on 31 July 2018. PSP will be on a ballistic trajectory, requiring seven Venus flybys to progressively lower the perihelion over the seven-year mission. This near-solar environment can be particularly challenging from a spacecraft design as well as a navigation perspective. We discuss an overview of the mission along with some of the particular challenges in navigating PSP.

Valerino, Powtawche↗

GTOC9: Methods and Results from the Jet Propulsion Laboratory Team

The removal of 123 pieces of debris from the Sunsynchronous LEO environment is accomplished by a 10-spacecraft campaign wherein the spacecraft, flying in succession over an 8-yr period, rendezvous with a series of the debris objects, delivering a de-orbit package at each one before moving on to the next object by means of impulsive manoeuvres. This was the GTOC9 problem, as posed by the European Space Agency. The methods used by the Jet Propulsion Laboratory team are described, along with the winning solution found by the team. Methods include branch-and-bound searches that exploit the natural nodal drift to compute long chains of rendezvous with debris objects, beam searches for synthesising campaigns, ant colony optimisation, and a genetic algorithm. Databases of transfers between all bodies on a fine time grid are made, containing an easyto- compute yet accurate estimate of the transfer V . Lastly, a final non-linear programming optimisation is performed to ensure the trajectories meet all the constraints and are locally optimal in initial mass.

Sims, Jon↗

MAVEN Navigation During the First Mars Year of the Science Mission

The Mars Atmosphere and Volatile Evolution mission (MAVEN) is the first mission devoted to studying the Martian atmosphere. From a Navigation perspective it is unique in that science is performed at near aerobraking altitudes. This results in the requirements on Navigation trajectory accuracy requirements which are an order of magnitude tighter than those of aerobraking phases on previous missions. Navigation experiences with the Mars atmosphere are described as they pertain to Navigation models, trajectory reconstructions, trajectory predictions, density corridor control, and collision avoidance of other bodies around Mars.

Demcak, Stuart↗