Skylab 1 and 2 - Pilots' report
Details of powered flight are considered, giving attention to the lift-off, engine thrust, and separation from the S-1VB stage. The rendezvous checklist was performed on time and exactly prior to the first phasing maneuver. The Command Service Module was finally maneuvered to a position for hard docking. Attention is given to aspects of extravehicular activity during the mission and delays experienced in the separation procedure.
Charles Conrad, Jr.↗