Update on Parallel Process Execution in the Next Generation System Analysis Model

As of the end of 2021, 88,880 metric tons of heavy metal (MTHM) (44,741 MTHM in dry storage; 44,139 MTHM in wet storage) of spent nuclear fuel (SNF) were stored at various reactor sites across the United States [1]. The Office of Storage and Transportation in the Department of Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, allocation priority, available facilities, start dates, etc.) and study the implications of these changes on site clearance schedules, campaign costs, transportation infrastructure acquisition, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Update on Parallel Process Execution in the Next Generation System Analysis Model (NGSAM)

As of the end of 2022, it is estimated that over 90,000 metric tons of heavy metal (MTHM) of spent nuclear fuel (SNF) were stored at various commercial nuclear power reactor sites (both operating and shutdown) across the United States [1]. The Office of Storage and Transportation within the U.S. Department of Energy’s Office of Nuclear Energy is planning for the transportation, storage, and eventual disposal of SNF and high-level radioactive waste (HLW). To aid in this effort and inform decision-makers about the backend of the spent fuel cycle, systems analysis tools capable of analyzing the various options with respect to SNF and HLW management are being used as well as continuously improved to meet the evolving needs of the program. System analysts typically use these tools to vary underlying assumptions (shipping rates, available facilities, start dates, interim storage capacity, etc.) and study the associated system implications such as timing for clearing sites of SNF, various cost elements, transportation infrastructure acquisition needs, etc.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consolidated Interim Storage Advantages and Disadvantages from Prior Reports and Studies

The question of whether centralized storage of civilian spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. Since the Nuclear Waste Policy Act (NWPA) (U.S. House of Representatives 1982) was enacted, the need for interim storage facilities (ISFs) as part of the federal waste management system has been analyzed and documented in numerous reports and studies. This paper summarizes the advantages and disadvantages as described in those reports of incorporating an ISF into the waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Equity Considerations in Siting Consolidated Interim Storage Facilities for Commercial Spent Nuclear Fuel

Questions of equity and fairness are often raised by representatives from State, Tribal and local governments and members of the public when resolving conflicts over siting of nuclear facilities. However, the two terms are not synonymous: equity can be quantified while fairness is much more subjective. The Department of Energy's (DOE) December 2021 Request for Information sought input on how to site federal facilities for the temporary, consolidated storage of spent nuclear fuel (SNF) using a consent-based approach. It is anticipated that just such questions about equity and fairness associated with the potential emergence of more than one host site may be raised by the twelve groups of university, nonprofit and private sector partners (Consortia) working to support community engagement, inclusively involve stakeholders, build relationships, and develop innovative forms of mutual learning and public capacity to participate in the consent-based siting process for a federal consolidated interim storage facility during the current Planning & Capacity Building stage of the consent-based siting process. In terms of DOE's Integrated Waste Management System (IWMS), sociopolitical equity concepts are a factor in all aspects of IWMS development and operations and will be particularly applicable should two or more host sites become a possibility, either by the emergence of multiple volunteer hosts or by pursuit as a IWMS program strategy. This paper summarizes recent analyses that explore how four equity metrics - number of states, division of the projected SNF total by the year 2083, current population and land area - might be perceived by host communities, states and regions if two, three or four sites for hosting federal consolidated interim storage facilities were to be contemporaneously realized. Existing institutional arrangements, including Nuclear Regulatory Commission regions, Federal Energy Regulatory Commission regions and Low-Level Radioactive Waste Disposal Compacts, were selected to create hypothetically merged two, three and four-region scenarios to calculate how the four metrics balance out. Projected SNF burden was prioritized with regional contiguity of the consolidated regions a requirement for a functional scenario. The intent was not to promote or suggest any construct as a program objective; the configurations are geopolitical abstractions only to explore potential perceptions of equity. Understanding the possible issues of equity that could arise may benefit program efforts toward achieving a cooperative federalism wherein both the federal and multiple State governments share the goal of manifesting more than one federal consolidated interim storage facility. The main finding is that it is not possible to optimize for all four metrics simultaneously. The analyses demonstrate that trying to create a sense of equity by backfitting a solution to a random population and land distribution will always contain a degree of artificiality.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transportation and Systems Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. An analyst using NGSAM has the ability to define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions on and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams had been working closely for several years before formalizing this collaboration. START provides the SNF routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM, as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Consolidated Interim Storage Advantages and Disadvantages from Prior Reports and Studies

The question of whether centralized storage of civilian spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. Since the Nuclear Waste Policy Act (NWPA) [1] was enacted, the need for interim storage facilities (ISFs) as part of the federal waste management system has been analyzed and documented in numerous reports and studies. This presentation summarizes the advantages and disadvantages, as described in those reports, of incorporating an ISF into the waste management system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Analysis Modeling and Intermodal Transportation for Commercial Spent Nuclear Fuel

This is a technical presentation that does not take into account contractual limitations or obligations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). For example, under the provisions of the Standard Contract, spent nuclear fuel in multi-assembly canisters is not an acceptable waste form, absent a mutually agreed to contract amendment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The U.S. Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Waste Management (IWM) program is examining a suite of IWM system options and conducting supporting analyses to enable future informed choices. The IWM program is currently organized into the following four major areas: (1) IWM facilities and equipment concepts and development, (2) transportation capability analysis and support, (3) information technology solutions and support, and (4) system integration analysis and support. This paper focuses on the activities ongoing in the IWM system integration analysis and support area. Two main research activities in this area are: data and tools development, validation, and maintenance; and special studies, analyses, and assessments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

System Analysis Modeling and Intermodal Transportation for Commercial Spent Nuclear Fuel

The United States Department of Energy (DOE) Office of Nuclear Energy is applying knowledge and understanding in the areas of systems level engineering, analysis, and decision making to better inform the waste management pathways for U.S. spent nuclear fuel (SNF). Currently there are 93 operating and 23 shutdown commercial nuclear reactors in the United States. SNF at most of these locations is being stored in spent fuel pools, dry storage, or both [1, 2]. This paper initially goes over the basics of the agent-based simulation tool known as the Next Generation System Analysis Model (NGSAM) that has the capability to model interaction and movements of individual components or groups like casks, railcars etc. The next section covers some of the methods implemented in the Java Transportation Operations Model (JTOM) to facilitate the movement of assemblies, casks, railcars etc. and the various intermodal transfer options. This section also covers the current cask loading and intermodal transfer times implemented in NGSAM. The last section goes over the proposed values for intermodal transportation, and cask transfer/loading operations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗