Search NASA⌕ Search

Engineering topics

Julie Kleinhenz

Publications and source records attributed to Julie Kleinhenz.

At least 19 records

Lunar Water ISRU Measurement Study (LWIMS): Establishing a Measurement Plan for Identification and Characterization of a Water Reserve

NASA’s Artemis program aims to achieve a sustainable lunar presence by 2028. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources (e.g., water) to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles, butthe nature and extent of this resource is not well understood. Identification of the presence of water alone is not adequate for ISRU architecture planning and engineering design. The Lunar Water ISRU Measurement Study (LWIMS) assessed and defined the type, amount, and fidelity of the information and measurements needed to select mining locations for lunar water ISRU and to define requirements for ISRU hardware and architecture development. Current ISRU requirements were used to define a water ‘reserve’ in this context. A measurement plan to achieve these goals includes three key elements; a predictive ‘water favorability’ model to identify and map potential deposits, continued assessment of orbital data, and three types of landed missions to make direct ground measurements. Corresponding mission scenarios and instrument suites will depend on risk posture and timelines for ISRU implementation.

In situ resource utilization↗

In-Situ Resource Utilization Options for the Moon and Mars

In-Situ Resource Utilization (ISRU) is key to enabling extended presence at exploration locations. NASA’s focus for ISRU to date has been human exploration locations: the Moon and Mars. Likewise the primary target for ISRU has been the production of mission consumables for propulsion and life support. Producing oxygen alone from minerals on the Moon or atmosphere on Mars can provide the majority of these consumables. However, accessing water at either location allows for full propellant production (fuel and oxidizer) as well as other applications (eg life support). Current and previous study efforts have looked at mission architectures and ISRU mass payback for these options. Studies have also identified gaps in information needed to design effective ISRU hardware and choose best architectures

In-Situ Resource Utilization↗

Case Study for Lunar ISRU Systems Utilizing Polar Water

In-Situ Resource Utilization (ISRU) is key to long term presence at any extraterrestrial destination. Current NASA direction is to achieve a sustainable presence on the lunar surface by 2028. Mission plans currently target the lunar South Pole to leverage the extended periods of solar illumination and allows for potential access to water ice in the permanently shadowed areas around the poles. With water, it is possible to produce both fuel and oxidizer to fully refuel a vehicle. In order to address ISRU infusion into mission planning, a study of an end-to-end ISRU propellant production system was initiated to assess ISRU architectures and obtain mass and power estimates for each. The results of these case studies will be presented. For this study, The ISRU system architecture involved two sites; the mine site in a shadowed crater where water ice is excavated and extracted from the regolith and the propellant production site at an illuminated ridge where the water is processed into liquefied O2 and H2 propellants. Fixed hardware would be emplaced at each site, with two alternating water tankers to transport water between them. Notional lunar sites were identified for this architecture for baseline environmental parameters. Technology solutions for each subsystem were selected based on those with the highest fidelity models or those that have empirical laboratory data to anchor to. While power needs were identified for each location, a power solution was not prescribed, therefore the masses presented do not include surface power systems. The baseline case in this study assumed that 10 mT of oxygen, along with enough hydrogen to support a propulsion mixture ratio of 6, must be produced in 225 days. Therefore 15 mT of water would need to be collected and processed. The baseline solution resulted in a system mass of5 mT and a total required power of 68kW. The majority of the mass was split between the ridge site system and the two water tankers (2.6 mTand 1.8mTrespectively). The majority of the required power was with three subsystems at approximately 20 kW each: hydrogen liquefaction, electrolysis, and the water extractor subsystem. Trades for four key variables are also presented, namely production rate, water concentration, dry overburden depth, and number of water transport trips. This can be compared to a system that targets oxygen from the minerals in the surface regolith material. A carbothermal reduction reactor system was used for this comparison. The use of direct solar thermal energy to process the regolith and the ease of access of the resource resulted in significantly lower values for the oxygen case: approximately 2.7 mT and 11.8 kW. However, the mass trade would favor the water case over successive missions where the hydrogen up-mass of 2 mT per mission will accrue against the oxygen system.1Aerospace Research Engineer, Chemical and Thermal Propulsion Systems Branch, Senior Member.2Mechanical Engineer, Propulsion and Power Division/Energy Conversion Systems, 2101 Nasa Pkwy/Mailcode EP3 Houston, TX 77058, AIAA member.

Lunar↗

Lunar In-situ Resource Utilization Concept to Reality

ISRU is a capability involving multiple elements to achieve final products (mobility, product storage and delivery, power, crew and/or robotic maintenance, etc.) ‘ISRU’ does not exist on its own. By definition, it must connect and tie to users/customers of ISRU products and services Living Off the Land: ISRU involves any hardware or operation that harnesses and utilizes ‘in-situ’ (local) resources to create products and services for robotic and human exploration. Resource Examples •Water •Oxygen •Hydrogen •Carbon •Metals •Silicon •Nitrogen •Regolith/Rock •Discarded materials Product Examples •Propellant •Life Support Consumables •Feed stock for •Additive manufacturing •Construction •Agriculture substrate and/or fertilizer

lunar↗

A Lunar Water ISRU System Study for Human-Scale Propellant Production

NASA’s plans to return to the moon in the Artemis campaign include intentions for sustainable surface operations. In-Situ Resource Utilization (ISRU) is key to enabling sustainability. The use of water, which has been identified in the lunar polar regions [1-4], could be pivotal to a sustainable architecture. While water has been identified, there is limited information regarding its form and distribution. The Lunar Water ISRU Measurement Study (LWIMS) [5] outlined the current state of knowledge regarding water resources on the moon, what information is lacking, and how to approach a measurement campaign to close those knowledge gaps. However the NASA timeline necessitates that lunar surface water prospecting, or reconnaissance, efforts and ISRU system design to occur in parallel. ISRU hardware and systems development must proceed without key resource knowledge. Yet, engineering design requires come constraints and targets to work to. The goal of this study was to define a set of lunar water reference cases, based on the cur-rent lunar water information, to help focus ISRU de-sign and planning. This approach is similar to an study focused on Mars resources called Mars Water ISRU Planning (MWIP) [6].

Lunar Water↗

An Overview of the Lunar Water ISRU Measurement Study (LWIMS)

NASA announced plans for the Artemis program, which would send crewed missions to the Moon by 2024 and achieve a sustainable lunar presence by 2028 [1]. To carry out sustained crewed surface operations, In-Situ Resource Utilization (ISRU), which would use lunar resources to produce mission consumables, will be critical. Water-bearing materials have been identified at both lunar poles and are often associated with Permanently Shadowed Regions (PSRs). These constitute a geological resource that may or may not be convertible to reserves with additional exploration. This water could provide both fuel and oxygen for refueling vehicles as well as life support consumables. However, the nature and extent of this resource is not well understood. Detection of water alone is not adequate for ISRU planning. For this reason, NASA chartered the Lunar Water ISRU Measurement Study (LWIMS). The goal of this study was to assess and define the type, amount, and fidelity of the measurements needed to select mining locations for lunar water ISRU and to define resource-related requirements for ISRU hardware development and architectures (mining operations, hardware emplacement, concept of operations).

Julie Kleinhenz↗

Lunar Resources Catalog (LRC): Viper Pathfinder Dataset

Introduction: A new era in lunar exploration has recently begun. Through NASA’s robotic Commercial Lunar Payload Services (CLPS) initiative, international and the human Artemis programs, multiple assets are being deployed to explore the Moon and at a rapid cadence. There will be a huge expanse in lunar surface exploration with mobility (e.g., rovers). Several missions are focused on collecting data for assessing lunar resources for potential In-Situ Resource Utilization (ISRU). With this expansion in exploration there will be a commensurate expansion in the volume and variety of data. Work has begun on establishing a measurement plan (i.e., what data is needed) for ISRU [1] but how to integrate these data into the broader Planetary Data Ecosystem (PDE) following FAIR (i.e., Findability, Accessibility, Interoperability, and Reuse) data practices has not been addressed. The VIPER team intends to engage this challenge.

VIPER↗

In Situ Resource Utilization (ISRU) Envisioned Future Priorities

The National Aeronautics and Space Administration (NASA) of the United States of America (US) has initiated the Artemis Moon to Mars program to send astronauts (the first woman and person of color) back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface in the 2030’s. A major objective of this program is to characterize the resources that exist on the Moon and Mars, and learn how to utilize them for sustained and affordable exploration. Commonly known as In Situ Resource Utilization (ISRU), the search for, acquisition, and processing of resources in space has the potential to greatly reduce the dependency on transporting mission consumables and infrastructure from Earth, thereby reducing mission costs, risks, and dependency on Earth. Through the extraction and processing of resources into mission commodities such as rocket propellants, life support consumables, and fuel cell reactants, ISRU enhances and evolves the cis-lunar, lander, and surface transportation systems required for human exploration; expanding and ehancing HOW humans get to, explore, and return from the Moon. Through the extraction and processing of resources into metals, silicon, and other manufacturing and construction feedstock, ISRU enhances and allows for the expansion of critical infrastructure through in situ manufacturing and construction capabilities needed for WHAT humans do on the Moon and in cis-lunar space. Because of this, ISRU supports and enables commercial involvement beyond NASA and governmental agencies by both lowering the cost of sustained transportation to/from/on the Moon as well as supporting the market required for needing these transportation systems. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) ensures the coordinated development of ISRU and other critical space and surface infrastructure elements such as propulsion, power, manufacturing, construction, and robotics through the Strategic Technology Architecture Roundtable (STAR) process. Through STAR, an integrated framework and process has been created allowing for capabilities and technologies to be linked and assessed, gaps to be identified, specifications and metrics to be established, and provide a means to prioritize and implement technology development and missions. For lunar ISRU, three primary areas of development have been initiated, (1) understanding, mapping, extracting, and processing water and other volatiles found in polar permanently shadowed regions (PSRs), (2) methods, technologies to extract oxygen from regolith, and (3) methods, technologies, and use cases for metals, silicon, and other feedstock commodities extracted and produced from lunar resources. This presentation will briefly discuss the STAR process and elaborate on the current status and future plans for ISRU development, demonstration, and architecture implementation of NASA’s Envisioned Future Priorities plan for ISRU.

In Situ Resource Utilization↗

ISRU Potential Water Mine Sites; Preliminary Evaluation for NASA Artemis Campaign

The NASA Artemis Campaign aims to return to the Moon to maintain a sustainable presence [1], and In-Situ Resource Utilization (ISRU)is a key part of sustainability. The regions of interest for the Artemis campaign, as outlined in [1] and shown in Fig 1, are at Lunar the South Pole where water ice has been identified. The potential use of this water, and oxygen/hydrogen, for NASA and commercial applications such as refueling vehicles and power systems, and supplying life support consumables is one of the considerations the NASA Artemis team is using to evaluate these regions. As such, analyses are underway to evaluate the ISRU ice mining potential of these regions of interest. To do so, a set of ground rules for ISRU sites have been developed to align with current assumptions for customer needs, hardware capabilities, initially limited infrastructure, and lunar environments/terrain. The customer could be a lander, habitat, or other asset that makes use of ISRU product within the Artemis architecture. At this time, four of the regions of influence (the ‘western’ cluster in Fig. 1) have undergone preliminary ISRU evaluation. It should be noted that variety of other efforts have done similar evaluations of this nature with different assumptions or viewpoints, such as the most recent[2]. However, most evaluations focus on large permanently shadowed regions (PSRs) and craters due to orbital data resolution limitations, whereas early ice mining operations will likely occur in much smaller PSRs

In situ resource utilization↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

Evaluation of the NASA Artemis Regions of Interest for ISRU Water Mine Potential

The NASA Artemis Campaign has a stated goal to return to the Moon to maintain a sustainable presence; In-Situ Resource Utilization (ISRU) is a key part of sustainability. The regions of interest identified for the Artemis campaign are at Lunar the South Pole where water ice, a valuable resource for ISRU, has been identified. As such, a preliminary evaluation of the ISRU ice mining potential has been performed for of these regions of interest. A set of ground rules for this evaluation were developed to align with current assumptions for customer needs, hardware capabilities, an initially limited infrastructure, and lunar environments/terrain. These ground rules, and the evaluation of six regions of interest, are presented here. The site selections (ISRU and customer assets) and their associated traverses are notional and were intended only to provide a broad preliminary evaluation of the water ISRU potential of the regions. Evaluation of these regions are subject to change as decisions regarding utilization are made. Water ISRU is possible at all regions, though the degree to which each criterion are met is variable. The two regions near Shackleton ranked highest in this evaluation, while the de Gerlache region presented the most difficulties meeting the current criteria. The regions were not explicitly ranked due to the nuances associated with the high number of variables but evaluation summaries of each are presented. It should also be noted that all ISRU ‘mine’ sites in this analysis focused on smaller (few kilometer) size permanently shadowed regions (PSRs). This was necessary to meet proximity requirements between these PSRs and the highly illuminated regions needed for customers and ISRU processing. The areas identified in this study are meant to focus exploration and reconnaissance efforts needed to better evaluate the ISRU potential.

In-situ resource utilization↗

ISRU Evaluation of Artemis Campaign Sites: Considerations and Methodology

The Artemis campaign has stated goals of ‘sustainable exploration’ [1] which includes In-Situ Resource Utilization (ISRU). The selection of the lunar polar region for Artemis was in part due to the identification of water in permanently shadowed regions (PSRs) which is of both scientific and exploration interest. The potential use of this water (as is, or as oxygen/hydrogen) for NASA and commercial applications, such as refueling vehicles, for power systems, or supplying life support consumables, is reflected in NASA’s Moon to Mars objectives (LI-7) [2]. These objectives also specify the need to locate and characterize the lunar water such that a water ‘reserve’ can be identified (AS-3). While infusion of ISRU capabilities is not planned for Artemis III, it is an opportunity to collect information to identify water reserves for later Artemis and commercial use. Selection of an Artemis III site with ISRU consideration will help advance the infusion of ISRU into later missions.

In situ resource utilization↗

Kiloton Class ISRU Systems for LO2/LCH4 Propellant Production on the Mars Surface

As part of the 2023 strategic analysis cycle to explore the trade space, the NASA Mars Architecture Team wanted to explore what it takes to produce in situ on Mars many hundreds of tons of propellants for a large all-chemical transportation system. The conceptual operations and design of the LO 2 /LCH 4 in situ resource utilization (ISRU) water acquisition, propellant production and liquification system was assigned to the NASA Compass concurrent engineering team with support from various NASA ISRU, cryogenic fluid management, and surface power experts. The conceptual point design examined one case producing 300 t of LO 2 /LCH 4 from the Mars atmosphere and delivered water in 20 months and storing the liquified propellants in a to-be-reused lander. Several of these large single-stage, all-chemical class large vertical landers would deliver the required ISRU equipment. The required 150 t of water stock for the ISRU system was traded between three options: delivered, pumped from subsurface ice deposits or extracted from surface soils. The large propellant production systems consist of atmospheric CO 2 collection scroll pumps, a combined solid oxide electrolysis and methanation system to convert the CO 2 and water into gaseous O 2 and CH 4 , and various dryers, scrubbers, and separators to remove the excess water, CO 2 and H 2 . The liquefaction system consisted of 90 K cryocoolers to provide cold Ne to the launch vehicle tanks to liquify these CH 4 and O 2 gases and store them as rocket propellants. The systems are deployed using a 6 t (payload) capable chassis derived from conceptual pressurized rover designs. In total, the propellant production and liquefaction systems required three propellant production pallets, two liquefaction pallets, two water tankers, and six 40 kW-fission surface power systems (FSPS) with cabling. All this equipment was found to notionally fit inside two- 75 metric ton payload capacity Mars ascent and landing vehicles (MALV). For the case where 150 t of water delivered from Earth, four cargo MALVs are required for the full system. The same is true when the 150 t of water is extracted through surface mining. For the borehole system, only 3 cargo MALVs are necessary. A comparison of approaches in terms of number of landers, number and type of elements, power and time is made.

ISRU↗

Lunar Surface Missions for Resource Reconnaissance: NASA's PRIME-1 and VIPER

In 2019 NASA announced it would return to the Moon where it would seek to establish a sustainable lunar presence. In Situ Resource Utilization (ISRU) is a critical part of the infrastructure needed to sustain and grow human surface exploration. NASA further codified its ISRU intentions with the release of the Moon to Mars objectives in 2022, which calls out specific infrastructure goals, and in the release of the Architecture Definition Document in 2023. While there are a variety of resources that are of interest, including oxygen from regolith minerals, water is a game changing resource for in-situ consumable and propellant production. NASA’s intention of targeting of the lunar polar region for Artemis is, in part due to the potential of water resources there.

Lunar↗

Moon to Mars In Situ Resource Utilization (ISRU) Status Update

In 2017, NASA initiated the Artemis program to send astronauts back to the lunar surface, create a sustainable human lunar exploration program, and lead the first human exploration mission to the Mars surface. While much of NASA’s plans for the Artemis program currently focus on the Human Lunar Return and the ability for astronauts to explore the lunar surface for limited durations each year, the longer-term vision for the Artemis program is to enable sustained human exploration and commercial operations in cis-lunar space and the lunar surface. An important aspect of achieving this long-term vision, is to better understand and characterize the resources on the Moon and Mars and learn how to extract and use these resources. Known as In Situ Resource Utilization (ISRU), the identification, mapping, extraction, and processing of space resources has the potential to greatly reduce the cost and risk of human exploration. These are achieved by reducing what needs to be delivered from Earth and the dependency on these supplies, lowering costs through commercial operations, and expanding infrastructure for safer and more capable exploration and surface operations. To guide development of ISRU technologies and systems on the ground and demonstrate these capabilities on the Moon and Mars, the NASA Space Technology Mission Directorate (STMD) created and released the ISRU Envisioned Future Priorities (EFP) strategic plan in 2022 and updated it in 2023. While lunar ISRU technology development had already started, these publicly released strategic plans have been used to guide and prioritize technology development, and assess the progress in achieving the vision. Since the release of the ISRU EFP, there have been several significant activities/events that have occurred with respect to human lunar exploration, surface infrastructure, and ISRU. This presentation will provide an overview and status of on-going technology and system development activities, an update of ISRU into the Artemis campaign, an update on ISRU-related activities.

NASA↗