External Fast Electrically-Controlled Ferroelectric Tuners for SRF Cavities
Explore the source record for details and available documents.
Engineering topics
Publications and source records attributed to Kanareykin, Alex.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
This project pursues demonstration of the complete staging of high gradient wakefield acceleration at Argonne Wakefield Accelerator (AWA) facility, which is well aligned with the core mission of AWA and the roadmap laid out for the dielectric wakefield accelerator technology toward future linear colliders. During the project, we have successfully demonstrated the feasibility of the staged short pulse TBA (C. Jing, et al, Nucl. Instrum. Meth. A., 898, 72-76, 2018). We have successfully performed the first over 100MW dielectric power extractor. As the last task, one of the key elements for the drive beam distribution system, the fast kicker, has been built and successfully demonstrated this year too. The staging technology demonstrated in this project is crucial for the 500MeV Demonstrator that is planned at AWA in the next five years. The plan is to use two staged meter long dielectric disk accelerators to achieve 500MeV energy gain within ~10 meter long experimental space. While this SBIR project is closed, we plan to continue to investigate the dielectric accelerator technologies under Euclid's general scientific and commercial interests.
Beam-driven wakefield acceleration is one of the most promising advanced accelerator concepts. With this approach, the main beam is accelerated by absorbing the energy from a drive beam, which has a lower kinetic energy, but a much higher current. For efficient acceleration, it is important to shape the drive beam axially, to increase the so-called transformer ratio: the energy gain by the main beam over the energy loss of the drive beam. In most cases, the drive beam shaping is done with the help of beam phase space manipulations, along with removing portions of the beam with a scraper. Such shaping is complicated by itself, causing charge loss and thermal heating, but can also lead to beam instabilities, due to the alteration of the beam phase space. How the problem is being addressed: In this project, Euclid Techlabs proposes to reduce the complexity of this process by shaping the laser beam incident on the photocathode instead of the electron beam itself. This approach yields an additional “tuning knob” for shaping the electron beam. The photocathode laser pulse can be modified to have the desired longitudinal profile, which will result in the desired profile of the electron beam after acceleration in the photoinjector. Laser shaping is, in fact, analogous to previous electron beam shaping approaches. A chirped beam is passed through a dispersive element (spatial light modulator), and masked to achieve the desired shape.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Each niobium cavity employed in superconducting accelerators requires a power coupler that supplies it with up to hundreds of kW’s of CW RF power, which is delivered to the 2K or 4K cold cavity from a Room Temperature (RT) source. Coupler design is a challenging task. It should transmit the minimum possible thermal power flow to the cavity, because a single watt at 2K requires 1 kW of cryogenic system power to remove it. Since the coupler connects the cold cavity to a Room Temperature (RT) power source, it transmits a static thermal load due to its thermal conductivity. Also, the coupler experiences heating by RF fields. This dissipated power partially penetrates to the 2K zone, and is called a dynamic load. From one point of view, the coupler should have low thermal conductivity, in order to decrease the static load. Stainless steel (SS) is usually used for that reason, but it also has low electrical conductivity, which introduces a high dynamic load. Copper plating on the SS is required to improve the electrical conductivity, but it is not reliable and often flakes. One copper flake might cause an electrical discharge and contaminate the surface of the niobium cavity, thus spoiling its Q-factor. In that case, decommissioning of the entire cryomodule is required to restore the cavity Q-factor, which means it is a tremendously expensive procedure. That is why an improved reliability coupler is of very high interest. As a result, the main idea of the proposed project is to completely eliminate the unreliable copper plating by employing solid copper shields to screen the SS pipe from RF fields.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.