Search NASA⌕ Search

Engineering topics

Kashikhin, V. [Fermilab] (ORCID:0000000172494300)

Publications and source records attributed to Kashikhin, V. [Fermilab] (ORCID:0000000172494300).

Magnetic Measurements of Fermilab Rapid-Cycling Booster Gradient Magnets

Fermilab is upgrading its Booster synchrotron to increase ramp rate and intensity. This is part of the Proton Improvement Plan (PIP-II) that will allow the Main Injector to achieve proton beam power of 1.2 MW within the next few years. This upgrade includes running the 55-year-old Booster magnets at 20 Hz instead of the usual 15 Hz, and construction of some shorter and wider aperture versions of these combined-function gradient magnets. Magnetic measurements were performed to characterize the present 15 Hz AC performance, and then again with 20 Hz ramp cycle to ensure performance and compatibility in this new operating regime. A 3 m-long curved flat-coil was developed for these measurements using Printed Circuit Board (PCB) technology. The probe also has a separate 0.5 m-long body-field probe, allowing integral, body, and end fields to be measured across 100 mm of the magnet aperture. The sampling rate for these measurements during the AC cycle was 200 kHz, and field resolution was better than 0.01%. Details of the probe, measurements, and results are presented.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗

Development of Design for the STS Extraction Magnet System

The Oak Ridge National Laboratory STS Project will enhance the Spallation Neutron Source by adding a new neutron source. The upgrade includes a 30% increase in beam energy and a 50% boost in beam current, doubling the accelerator's power capability to 2.8 MW. The Ring-to-Second-Target Beam Transport (RTST) system is vital in directing high-energy proton beams to the new second target station. New magnets have to fit into a restricted space within the existing beamline to add the new extraction line. New, fast kicker magnets (Pulsed Dipole), a focusing quad with an aperture for both beamlines (Large Quad) and the replacement of existing 21Q40 Quads with 'Narrow Quads' having identical fields as the existing design are Fermilab's responsibility. The design of these magnets poses unique challenges, as in addition to the high requirements on the quality of magnetic fields, they are subject to major restrictions related to their dimensions.

Chernenok, V. [Fermilab] (ORCID:0009000778148215)↗

Oakridge PPU Magnets: Results and Measurements

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) is being upgraded from 1.0 GeV to 1.3 GeV (or 1.4 to 2.8 MW). Several water-cooled magnets have been upgraded to transport 30% higher beam energy. Fermilab contributed the magnet design for the new chicane magnets and injection/extraction septum. Designing the magnets was a challenging task because the new magnets required good combined integrated field quality and needed to occupy the old magnets space but with about 20% greater integrated magnetic field. Additional strong requirements applied to the magnets fringe field so as not to disturb the circulating beam. After fabrication of the magnets, an extensive measurement campaign was developed and performed at Fermilab’s Magnet Test Facility. The measurements needed to assess magnet performance and provide comparison to design calculations. These included verification of field strength and harmonics along an 8 m length and 200 mm good field diameter for the chicane dipoles, end-field Hall probe mapping of these magnets, and measurements along two differently curved trajectories within the ∼3 m septum gradient magnet. Details of the measurements and systems are presented along with results and comparison to field models.

DiMarco, J. [Fermilab] (ORCID:0000000228400036)↗