Search NASA⌕ Search

Engineering topics

Keeley, J. T.

Publications and source records attributed to Keeley, J. T..

Orbital transfer vehicle concept definition and system analysis study, 1985. Volume 2: OTV concept definition and evaluation. Book 2: OTV concept definition

This portion of the Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Study, Volume 2, Book 2, summarizes the flight vehicle concept selection process and results. It presents an overview of OTV mission and system design requirements and describes the family of OTV recommended, the reasons for this recommendation, and the associated Phase C/D Program.

Dickman, Glen J.↗

Orbital transfer vehicle concept definition and system analysis study, 1985. Volume 2: OTV concept definition and evaluation. Book 4: Operations

The benefits of the reusable Space Shuttle and the advent of the new Space Station hold promise for increasingly effective utilization of space by the scientific and commercial as well as military communities. A high energy reusable oribital transfer vehicle (OTV) represents an additional capability which also exhibits potential for enhancing space access by allowing more ambitious missions and at the same time reducing launch costs when compared to existing upper stages. This section, Vol. 2: Book 4, covers launch operations and flight operations. The launch operations section covers analyses of ground based and space based vehicles, launch site facilities, logistics requirements, propellant loading, space based maintenance and aft cargo carrier access options. The flight operations sections contain summary descriptions of ground based and space based OTV missions, operations and support requirements, and a discussion of fleet implications.

Mitchell, Jack C.↗

Atmospheric, Magnetospheric and Plasmas in space (AMPS) spacelab payload definition study. Volume 4. Part 1, AMPS program specification

The AMPS Program Specification delineates the AMPS Program requirements consistent with the resources defined in the AMPS Project Plan. All subsidiary specifications and requirements shall conform to the requirements presented. The requirements hierarchy for the AMPS program is illustrated. A brief description of each of the requirements documents and their intended use is provided.

Keeley, J. T.↗

Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study; volume 4: Part 2, Labcraft payload general specification

The Labcraft Payload General Specification (LPGS) amplifies those general requirements in the Labcraft Program Specification (LPS) to ensure that all hardware, software, and STS elements will successfully function as an integrated system to accomplish the objectives of the first Labcraft mission. Contract End Item Specifications (CEIS) and Procurement Drawings (PDs) prepared and implemented for all deliverable hardware and software elements are discussed.

Keeley, J. T.↗

Atmospheric, Magnetospheric and plasmas in Space (AMPS) spacelab payload definition study; Volume 4: Part 3, Labcraft instrument systems general specification

Guidelines and general requirements applicable to the development of instrument flight hardware intended for use on the GSFC Shuttle Scientific Payloads Program are given. Criteria, guidelines, and an organized approach to specifying the appropriate level of requirements for each instrument in order to permit its development at minimum cost while still assuring crew safety, are included. It is recognized that the instruments for these payloads will encompass wide ranges of complexity, cost, development risk, and safety hazards. The flexibility required to adapt the controls, documentation, and verification requirements in accord with the specific instrument is provided.

Keeley, J. T.↗

Atmospheric, Magnetospheric and Plasmas in Space (AMPS) spacelab payload definition study - program analysis and planning for phase C/D document - Volume 7

Typical missions identified for AMPS flights in the arly 1980's are described. Experiment objectives and typical scientific instruments selected to accomplish these objectives are discussed along with mission requirements and shuttle and Spacelab capabilities assessed to determine any AMPS unique requirements. Preliminary design concepts for the first two AMPS flights form the basis for the Phase C/D program plan. This plan implements flights 1 and 2 and indicates how both the scientific and flight support hardware can be systematically evolved for future AMPS flights.

Keeley, J. T.↗

Atmospheric, Magnetospheric, and Plasmas in Space (AMPS) spacelab payload definition study, technical summary document

Some 60 instrument candidates and 80 possible science investigations were evaluated. The early analysis emphasized the science aspect in terms of the functional requirements for each of the potential experiments identified by the AMPS science working group. These requirements were then used for the grouping of instruments into practical payloads which would fit the capabilities of the Shuttle/Spacelab. This analysis resulted in the definition of eleven different AMPS configurations. The data were then used to define a typical set of requirements for a flexible AMPS laboratory. The data gathered to this point showed that a planned sequential buildup of the laboratory would be necessary to meet both physical and funding limitations. This led to the definition of five strawman payloads by the science working group, which were used to establish a conceptual laboratory and to define preliminary design of a configuration which could satisfy AMPS needs during the early program period.

Keeley, J. T.↗