Advanced Solid Rocket Motor Project Status
The objectives of the project are the following: (1) to improve system safety and reliability; (2) to improve Space Shuttle Payload performance - 12,000 lb; (3) to optimize program cost; and (4) to promote a competitive solid rocket motor industry. The topics are presented in viewgraph form and include the Advanced Solid Rocket Motor (ASRM) project team, ASRM design, design schedules, and technical issues.
Keith Coates↗