The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy

STOP Modeling for the JWST: Techniques, Results, and Sensitivities

The James Web Space Telescope (JWST) is a large, infrared-optimized, space telescope scheduled for launch to L2 in 2011. It must meet rigorous thermal stability requirements, almost all of which will be verified through analysis. Terrestrial testing will be performed but even that will require significant analytical interpretation of results. Preliminary analysis indicates that traditional second-order effects could cause the telescope to exceed established performance requirements. This leads to very large detailed models, primarily since composite tubes are being modeled using solid elements. To minimize differences between the current baseline and the model the project is using a number of rapid analysis cycles. The large size of the telescope models and the short cycle time creates a demanding multidisciplinary analysis environment.

John D. Johnston

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS