Search NASA⌕ Search

Engineering topics

Kelly, George

Publications and source records attributed to Kelly, George.

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Defining the Value of IECRE Certifications for Providing Confidence in PV System Performance

The International Electrotechnical Commission (IEC) established a new conformity assessment system for renewable energy (IECRE) to address the industry's need to assure investors of the value of their PV power plants. There has been significant activity in the past three years devoted to defining the requirements for several types of PV system certificates, and publication of the international standards upon which these certifications are based. Now the IECRE system faces the challenge of defining the value proposition for certification and convincing stakeholders that it should be a standard requirement in the marketplace. This paper presents a detailed analysis of the present situation and the plan for promotion of IECRE certifications to help achieve wider market penetration of PV power generation.

14 SOLAR ENERGY↗

Marrying Quality Assurance with Design Engineering - A Winning Partnership! But, a Cultural Divide

Investors would like to be confident that a PV plant will work as promised before investing large sums of money. Data showing that PV modules can withstand thousands of hours of accelerated testing are a comfort, but are not sufficient to characterize the economic useful life (EUL) of the whole PV system. An inability to be confident of every aspect of the system can motivate less favorable contract terms. In the end, a winning partnership is obtained when a carefully engineered, durable design is married with a robust quality management system and the marriage is extended across all parts of the value chain. However, this marriage is challenging because of the conventional cultural divide between design engineers and quality management specialists. International standards are being developed to facilitate this partnership and include technology-specific requirements in the quality management systems used for component manufacture and system design, construction and operation.

14 SOLAR ENERGY↗

Marrying Quality Assurance with Design Engineering - A Winning Partnership! But, a Cultural Divide?: Preprint

Investors would like to be confident that a PV plant will work as promised before investing large sums of money. Data showing that PV modules can withstand thousands of hours of accelerated testing are a comfort, but are not sufficient. An inability to be confident of every aspect of the system can motivate higher interest rates; high degradation or failure rates can substantially decrease the return on investment and the value of the plant for resale later on. In the end, a winning partnership is obtained when a carefully engineered, durable design is married with a robust quality management system and the marriage is extended across all parts of the value chain. However, this marriage is challenging because of the conventional cultural divide between design engineers and quality management specialists. This paper discusses the motivation for increased emphasis on quality assurance and describes three new standards that detail requirements for a higher level of quality assurance for 1) PV module manufacturing, 2) inverter and other balance-of-systems (BOS) manufacturing, and 3) control of the system installation and operation. The paper concludes with a discussion of the challenges and benefits of marrying the quality assurance program with further optimization of the PV system design.

14 SOLAR ENERGY↗

Streamlining the Bankability Process using International Standards

NREL has supported the international efforts to create a streamlined process for documenting bankability and/or completion of each step of a PV project plan. IECRE was created for this purpose in 2014. This poster describes the goals, current status of this effort, and how individuals and companies can become involved.

14 SOLAR ENERGY↗

Coordination of International Standards with Implementation of the IECRE Conformity Assessment System to Provide Multiple Certification Offerings for PV Power Plants

To help address the industry's needs for assuring the value and reducing the risk of investments in PV power plants; the International Electrotechnical Commission (IEC) has established a new conformity assessment system for renewable energy (IECRE). There are presently important efforts underway to define the requirements for various types of PV system certificates, and publication of the international standards upon which these certifications will be based. This paper presents a detailed analysis of the interrelationship of these activities and the timing for initiation of IECRE PV system certifications.

14 SOLAR ENERGY↗

Examination of a Size-Change Test for Photovoltaic Encapsulation Materials: Preprint

We examine a proposed test standard that can be used to evaluate the maximum representative change in linear dimensions of sheet encapsulation products for photovoltaic modules (resulting from their thermal processing). The proposed protocol is part of a series of material-level tests being developed within Working Group 2 of the Technical Committee 82 of the International ElectrotechnicalCommission. The characterization tests are being developed to aid module design (by identifying the essential characteristics that should be communicated on a datasheet), quality control (via internal material acceptance and process control), and failure analysis. Discovery and interlaboratory experiments were used to select particular parameters for the size-change test. The choice of a sandsubstrate and aluminum carrier is explored relative to other options. The temperature uniformity of +/- 5C for the substrate was confirmed using thermography. Considerations related to the heating device (hot-plate or oven) are explored. The time duration of 5 minutes was identified from the time-series photographic characterization of material specimens (EVA, ionomer, PVB, TPO, and TPU). Thetest procedure was revised to account for observed effects of size and edges. The interlaboratory study identified typical size-change characteristics, and also verified the absolute reproducibility of +/- 5% between laboratories.

14 SOLAR ENERGY↗

ON THE FORMATION OF GLYCOLALDEHYDE IN DENSE MOLECULAR CORES

Glycolaldehyde is a simple monosaccharide sugar linked to prebiotic chemistry. Recently, it was detected in a molecular core in the star-forming region G31.41+0.31 at a reasonably high abundance. We investigate the formation of glycolaldehyde at 10 K to determine whether it can form efficiently under typical dense core conditions. Using an astrochemical model, we test five different reaction mechanisms that have been proposed in the astrophysical literature, finding that a gas-phase formation route is unlikely. Of the grain-surface formation routes, only two are efficient enough at very low temperatures to produce sufficient glycolaldehyde to match the observational estimates, with the mechanism culminating in CH{sub 3}OH + HCO being favored. However, when we consider the feasibility of these mechanisms from a reaction chemistry perspective, the second grain-surface route looks more promising, H{sub 3}CO + HCO.

79 ASTRONOMY AND ASTROPHYSICS↗