Search NASA⌕ Search

Engineering topics

Kelly, M.

Publications and source records attributed to Kelly, M..

22 records · Page 2

Results of the technical exchange agreement between NASA and DuPont on the containerless drop tube solidification of NiAl3

The final results of the Drop Tube Solidification of NiAl3 are presented. Problems associated with the utilization of a dripper furnace in the drop tube are discussed and the modification of experimental procedures required to achieve results are described. Sample microstructures of drop tube samples are compared with other samples. The dendrite arm spacings of drop tube samples are correlated with the rapid cooling rates.

Ethridge, E. C.↗

Containerless drop tube solidification and grain refinement of NiAl3

The possibility of undercooling Ni-Al alloys below the liquidus in order to produce a single phase peritectic structure by containerless drop tube solidification was studied. Containerless process is a technique for both high purity contamination free studies as well as for investigating the undercooling and rapid solidification of alloys by suppression of heterogeneous nucleation on container walls. In order to achieve large undercoolings one must avoid heterogeneous nucleation of crystallization. It was shown that the Marshall Space Flight Center drop tubes ae unique facilities for containerless solidification experiments and large undercoolings are possible with some alloys. The original goal of undercooling the liquid metal well below the liquidus to the peritectic temperature during containerless free to form primarily NiAl3 was achieved. The microstructures were interesting from another point of view. The microstructure from small diameter samples is greatly refined. Small dendrite arm spacings such as these could greatly facilitate the annealing and solid state transformation of the alloy to nearly 10% NiAl3 by reducing the distance over which diffusion needs to occur. This could minimize annealing time and might make it economically feasible to produce NiAl3 alloy.

Ethridge, E. C.↗

Tracking and data system support for the Mariner Mars 1971 mission. Volume 2: First trajectory correction maneuver through orbit insertion

The Deep Space Tracking and Data System activities in support of the Mariner Mars 1971 project from the first trajectory correction maneuver on 4 June 1971 through cruise and orbit insertion on 14 November 1971 are presented. Changes and updates to the TDS requirements and to the plan and configuration plus detailed information on the TDS flight support performance evaluation and the preorbital testing and training are included. With the loss of Mariner 8 at launch, a few changes to the Mariner Mars 1971 requirements, plan, and configuration were necessitated. Mariner 9 is now assuming the former mission plan of Mariner 8, including the TV mapping cycles and a 12-hr orbital period. A second trajectory correction maneuver was not required because of the accuracy of the first maneuver. All testing and training for orbital operations were completed satisfactorily and on schedule. The orbit insertion was accomplished with excellent results.

Textor, G. P.↗

Tracking and data system support for the Mariner Mars 1971 mission. Prelaunch phase through first trajectory correction maneuver, volume 1

The DSN command system provided the capability to enter commands in a computer at the deep space stations for transmission to the spacecraft. The high-rate telemetry system operated at 16,200 bits/sec. This system will permit return to DSS 14 of full-resolution television pictures from the spacecraft tape recorder, plus the other science experiment data, during the two playback periods of each Goldstone pass planned for each corresponding orbit. Other features included 4800 bits/sec modem high-speed data lines from all deep space stations to Space Flight Operations Facility (SFOF) and the Goddard Space Flight Center, as well as 50,000 bits/sec wideband data lines from DSS 14 to the SFOF, thus providing the capability for data flow of two 16,200 bits/sec high-rate telemetry data streams in real time. The TDS performed prelaunch training and testing and provided support for the Mariner Mars 1971/Mission Operations System training and testing. The facilities of the ETR, DSS 71, and stations of the MSFN provided flight support coverage at launch and during the near-earth phase. The DSSs 12, 14, 41, and 51 of the DSN provided the deep space phase support from 30 May 1971 through 4 June 1971.

Laeser, R. P.↗