Engineering topics
Kempenaar, Jason G.
Publications and source records attributed to Kempenaar, Jason G..
Thermal design of the sample handling assembly in the sampling and caching subsystem on the Mars 2020 rover
The Mars 2020 Rover is scheduled to land on Mars on February 18, 2021. One of the primary mission objectives for the Mars 2020 Rover is to collect a set of Martian regolith samples for potential future return to Earth. Regolith and rock samples will be collected and placed into sample tubes using a coring drill, located at the end of a large Robotic Arm, on the outside of the rover. Filled sample tubes will be transferred from the outside of the Rover into the Adaptive Caching Assembly (ACA), located inside the Rover chassis, via the Bit Carousel. Once the filled sample tube is brought into the ACA, the Sample Handling Assembly (SHA) will transfer it to all of the internal processing stations of the ACA for volume assessment, sealing and finally drop-off on the Martian surface. The ACA is a volume within the rover chassis that is not temperature-controlled. Actuators inside the SHA and its End Effector (EE) must be warmed to above -55°C and -25°C, respectively, prior to use. This paper discusses the thermal design of the SHA that uses heaters and temperature sensors to warm up and maintain the temperature-sensitive arm components within temperature limits during operation. Thermal performance predictions for Mars surface operations are also presented.
Thermal testing of a Mars 2020 enhanced engineering camera
The upcoming Mars 2020 rover mission is introducing a new generation of engineering cameras (ECAMs) called the enhanced engineering cameras (EECAMs), which have advanced imaging capability over the previous ECAMs used on the Spirit, Opportunity, and Curiosity rovers. The Mars 2020 rover will have nine EECAMs – six upgraded HazCams used for hazard avoidance, two upgraded NavCams used for navigation, and a single CacheCam used to take images of samples obtained by the rover’s Sampling and Caching Subsystem (SCS). The detailed EECAM design was completed in April 2017, and since then the EECAM Subsystem has been in the process of fabrication, integration, and testing. This paper describes two thermal tests that were done for thermal model correlation and validation of the EECAM thermal design during Mars surface operations.
Thermal Operability Improvements for the Mars 2020 Rover Surface Mission
The Mars 2020 Rover is scheduled to land on Mars on February 18, 2021. One of the primary mission objectives for the Mars 2020 Rover is to perform in-situ science and collect a set of Martian regolith samples for possible future return to Earth. In order to meet mission requirements, 20 samples must be collected, assessed, and sealed during the prime mission (1.5 Martian years, approximately 1000 Sols). This requires that the Mars 2020 Rover operate in a much more efficient and autonomous manner than its predecessor, the Mars Science Laboratory (MSL) Rover, Curiosity. The thermal designs of both Curiosity and the Mars 2020 Rover utilize warmup heaters to bring the actuators and cameras, located on the outside of the vehicle, up to their operating temperatures prior to use. These heaters consume energy during the mission. The Rover energy balance, between energy production and consumption, must be maintained in order to keep the mission moving safely forward. Increased efficiency in the way this warmup heater energy is allocated and used in the Mars 2020 Rover operations plan will result in more energy available for science and engineering activities. This paper discusses the improvements that were made in both hardware and software to improve the way the Mars 2020 Rover will operate thermally on Mars.
Thermal Development of the Mars 2020 Enhanced Engineering Cameras
The engineering cameras (ECAMs) of the 2003 Mars Exploration Rover (MER) mission were re-flown on the Mars Science Laboratory (MSL) mission that launched in 2011. The upcoming Mars 2020 rover mission will introduce a new fleet of cameras called the enhanced engineering cameras (EECAMs). These EECAMs will have improved imaging capability, as the technology of the past ECAMs flown on Mars surface missions have become outdated. The EECAMs include six upgraded HazCams, two upgraded NavCams, and a single, newly-conceived CacheCam. The purposes of the HazCams and NavCams remain the same as they were for MER and MSL: to detect hazards to the front and rear of the rover, and to help in navigation across the Martian surface. The CacheCam will be used to take images of samples obtained by the rover’s Sample Caching System. This paper compares the differences in the thermal designs of the ECAMs and EECAMs, their design drivers, and their implications for the mission operations of the Mars 2020 rover.
Preliminary Surface Thermal Design of the Mars 2020 Rover
The Mars 2020 rover, scheduled for launch in July 2020, is currently being designed at NASA's Jet Propulsion Laboratory. The Mars 2020 rover design is derived from the Mars Science Laboratory (MSL) rover, Curiosity, which has been exploring the surface of Mars in Gale Crater for over 2.5 years. The Mars 2020 rover will carry a new science payload made up of 7 instruments. In addition, the Mars 2020 rover is responsible for collecting a sample cache of Mars regolith and rock core samples that could be returned to Earth in a future mission. Accommodation of the new payload and the Sampling Caching System (SCS) has driven significant thermal design changes from the original MSL rover design. This paper describes the similarities and differences between the heritage MSL rover thermal design and the new Mars 2020 thermal design. Modifications to the MSL rover thermal design that were made to accommodate the new payload and SCS are discussed. Conclusions about thermal design flexibility are derived from the Mars 2020 preliminary thermal design experience.