Search NASA⌕ Search

Engineering topics

Kempton, Willett

Publications and source records attributed to Kempton, Willett.

Industrializing Offshore Wind Power with Serial Assembly and Lower-cost Deployment - Final Report

A team of engineers and contractors has developed a method to move offshore wind installation toward lower cost, faster deployment, and lower environmental impact. A combination of methods, some incremental and some breaks from past practice, interact to yield multiple improvements. Three designs were evaluated based on detailed engineering: 1) a 5 MW turbine on a jacket with pin piles (base case), 2) a 10 MW turbine on a conventional jacket with pin piles, assembled at sea, and 3) a 10 MW turbine on tripod jacket with suction buckets (caissons) and with complete turbine assembly on-shore. The larger turbine, assembly ashore, and the use of suction buckets together substantially reduce capital cost of offshore wind projects. Notable capital cost reductions are: changing from 5 MW to 10 MW turbine, a 31% capital cost reduction, and assembly on land then single-piece install at sea an additional 9% capital cost reduction. An estimated Design 4) estimates further cost reduction when equipment and processes of Design 3) are optimized, rather than adapted to existing equipment and process. Cost of energy for each of the four Designs are also calculated, yielding approximately the same percentage reductions. The methods of Design 3) analyzed here include accepted structures such as suction buckets used in new ways, innovations conceived but previously without engineering and economic validation, combined with new methods not previously proposed. Analysis of Designs 2) and 3) are based on extensive engineering calculations and detailed cost estimates. All design methods can be done with existing equipment, including lift equipment, ports and ships (except that design 4 assumes a more optimized ship). The design team consists of experienced offshore structure designers, heavy lift engineers, wind turbine designers, vessel operators, and marine construction contractors. Comparing the methods based on criteria of cost and deployment speed, the study selected the third design. That design is, in brief: a conventional turbine and tubular tower is mounted on a tripod jacket, in turn atop three suction buckets. Blades are mounted on the tower, not on the hub. The entire structure is built in port, from the bottom up, then assembled structures are queued in the port for deployment. During weather windows, the fully-assembled structures are lifted off the quay, lashed to the vessel, and transported to the deployment site. The vessel analyzed is a shear leg crane vessel with dynamic positioning like the existing Gulliver, or it could be a US-built crane barge. On site, the entire structure is lowered to the bottom by the crane vessel, then pumping of the suction buckets is managed by smaller service vessels. Blades are lifted into place by small winches operated by workers in the nacelle without lift vessel support. Advantages of the selected design include: cost and time at sea of the expensive lift vessel are significantly reduced; no jack up vessel is required; the weather window required for each installation is shorter; turbine structure construction is continuous with a queue feeding the weather-dependent installation process; pre-installation geotechnical work is faster and less expensive; there are no sound impacts on marine mammals, thus minimal spotting and no work stoppage Industrializing Offshore Wind Power 6 of 96 9 for mammal passage; the entire structure can be removed for decommissioning or major repairs; the method has been validated for current turbines up to 10 MW, and a calculation using simple scaling shows it usable up to 20 MW turbines.

17 WIND ENERGY↗

Electric vehicle station equipment for grid-integrated vehicles

Methods, systems, and apparatus transferring power between the grid and an electric vehicle are disclosed. The apparatus may include at least one vehicle communication port for interfacing with electric vehicle equipment (EVE) and a processor coupled to the at least one vehicle communication port to establish communication with the EVE, receive EVE attributes from the EVE, and transmit electric vehicle station equipment (EVSE) attributes to the EVE. Power may be transferred between the grid and the electric vehicle by maintaining EVSE attributes, establishing communication with the EVE, and transmitting the EVSE maintained attributes to the EVE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Open V2X at ESIF: June 2015 - February 2017 (Final Report)

The University of Delaware (UD), and their industrial partners, have carried out testing, documentation, and standards development at ESIF. These activities are intended to help meet the objective of NREL's INTEGRATE program, to enable clean energy technologies to increase the hosting capacity of the grid, by providing grid services in a holistic manner using an open source, interoperable platform. In particular, the 'Open V2X at ESIF' project worked to facilitate standardization and interoperability for Electric Vehicle technologies, including battery electric vehicles and plug-in hybrid vehicles (hence EV) to provide grid services. This was done by interconnecting and testing EV and EVSE (charging station) hardware from different manufacturers, by developing standards and test protocols for standards, and by documenting new protocols to be proposed as standards. Contractor-supplied equipment used in the testing included Vehicle Smart Links (VSLs) installed in an EV and School Bus, single-phase and three-phase charging stations, and an optimizing aggregator (software running on a server, hence just 'Aggregator'). The Aggregator software was developed by U of Delaware and is now licensed to Nuvve Corp for commercial development, and licensed to NRG/EVgo for demonstrations. The Aggregator monitors capacity and operations of the EVs and EVSEs, dispatches them in response to requests, and reports their operations and metered power flow. In operation, as vehicles move, plug-in and unplug, the aggregator tracks the total capacity available within a defined jurisdiction or RTO (Regional Transmission Organization, synonym for ISO or TSO), and dispatches part or all of that capacity based on market or direct dispatch signals from a grid entity. The VSL is the data acquisition and control module in the resource itself (EVSE or EV), with rich communication between a single Optimizing Aggregator and many VSL (one in each resource). All requests and dispatch events are also logged by the aggregator to make the provision of grid power auditable. For these tests, the dispatch was typically a recorded signal, the VSL was in the EV or EVSE, and the recording of experimental performance was often carried out by the normal logging functions of the aggregator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mid-Atlantic Offshore Wind Interconnection and Transmission (MAOWIT)

This project has carried out a detailed analysis to evaluate the pros and cons of offshore transmission, a possible method to decrease balance-of-system costs and permitting time identified in the DOE Office Wind Strategic Plan (DOE, 2011). It also addresses questions regarding the adequacy of existing transmission infrastructure and the ability of existing generating resources to provide the necessary Ancillary Services (A/S) support (spinning and contingency reserves) in the ISO territory. This project has completed the tasks identified in the proposal: 1. Evaluation of the offshore wind resource off PJM, then examination of offshore wind penetrations consistent with U.S. Department of Energy’s (DOE) targets and with their assumed resource size (DOE, 2011). 2. Comparison of piecemeal radial connections to the Independent System Operator (ISO) with connections via a high-voltage direct current (HVDC) offshore network similar to a team partner. 3. High-resolution examination of power fluctuations at each node due to wind energy variability 4. Analysis of wind power production profiles over the Eastern offshore region of the regional ISO to assess the effectiveness of long-distance, North- South transmission for leveling offshore wind energy output 5. Analysis of how the third and fourth items affect the need for ISO grid upgrades, congestion management, and demand for Ancillary Services (A/S) 6. Analysis of actual historic 36-hr and 24-hr forecasts to solve the unit commitment problem and determine the optimal mix of generators given the need to respond to both wind variability and wind forecasting uncertainties.

17 WIND ENERGY↗

Advanced Offshore Wind Energy: Atlantic Consortium

This project developed relationships among the lead institution, U of Delaware, wind industry participants from 11 companies, and two other universities in the region. The participating regional universities were University of Maryland and Old Dominion University. Research was carried out in six major areas: Analysis and documentation of extreme oceanic wind events & their impact on design parameters, calibration of corrosivity estimates measured on a coastal turbine, measurment and modeling of tower structures, measurement and modeling of the tribology of major drive components, and gearbox conditioning monitoring using acoustic sensors. The project also had several educational goals, including establishing a course in wind energy and training graduate students. Going beyond these goals, three new courses were developed, a graduate certificate program in wind power was developed and approved, and an exchange program in wind energy was established with Danish Technical University. Related to the installation of a Gamesa G90 turbine on campus and a Gamesa-UD research program established in part due to this award, several additional research projects have been carried out based on mutual industry-university interests, and funded by turbine revenues. This award and the Gamesa partnership have jointly led to seven graduate students receiving full safety and climb training, to become “research climbers” as part of their wind power training, and contributing to on-turbine research. As a result of the educational program, already six graduate students have taken jobs in the US wind industry.

17 WIND ENERGY↗

Aggregation server for grid-integrated vehicles

Methods, systems, and apparatus for aggregating electric power flow between an electric grid and electric vehicles are disclosed. An apparatus for aggregating power flow may include a memory and a processor coupled to the memory to receive electric vehicle equipment (EVE) attributes from a plurality of EVEs, aggregate EVE attributes, predict total available capacity based on the EVE attributes, and dispatch at least a portion of the total available capacity to the grid. Power flow may be aggregated by receiving EVE operational parameters from each EVE, aggregating the received EVE operational parameters, predicting total available capacity based on the aggregated EVE operational parameters, and dispatching at least a portion of the total available capacity to the grid.

25 ENERGY STORAGE↗