Search NASA⌕ Search

Engineering topics

Ken Zuo

Publications and source records attributed to Ken Zuo.

Artemis I Prelaunch Flight Readiness Analysis

The Prelaunch loads analysis traditionally captures the vehicle and Mobile Launcher (ML) loads associated with stacking in the Vehicle Assembly Building (VAB), rollout to the pad, and high-speed winds while out on the pad prior to liftoff. The following paper details the methodology used in this analysis for loads for the Artemis Flight Readiness assessment. This paper focuses on the stacking and assembly loads, the loads induced by fueling, and the load seen during rollout to the pad. Methods for integrating multiple structural models in dynamic simulations using interface forces, constraint modes, and residual vectors is discussed. Both linear and nonlinear responses are addressed. Simulation results are compared to measured data from the Dynamic Rollout Test (DRT) and Wet Dress Rehearsal (WDR).

SLS↗

Space Launch System: SLS Real Time Rollout Monitoring for MPCV

The NASA Space Launch System (SLS) rocket, Orion spacecraft, and Mobile Launcher (ML) are transported to Pad 39B from the Vehicle Assembly Building on a large, tracked vehicle known as the Crawler Transporter (CT). The CT is a holdover from the Apollo and Space Shuttle programs but has been extensively upgraded to accommodate the SLS. The Dynamic Rollout Test (DRT) on March 17, 2022 marked the first full rollout of the SLS and ML. Analysis indicated that loads and vibrations would be well below design limits, but out of an abundance of caution it was decided to monitor the response in real time during the rollout to assure that loads remained within predicted limits. This first rollout was outfitted with extensive test instrumentation such as accelerometers, pressure sensors, and strain gauges. This instrumentation remained in place following the integrated vehicle modal test and was being used for additional Operational Modal Analysis (OMA) during the rollout in addition to the real-time monitoring. This presentation discusses the specific loads and accelerations monitored during the rollout, how and why those responses were chosen, and how the system was implemented. Finally, a post-rollout loads reconstruction is used to assess the process and the analysis tools used for the rollout analysis.

SLS↗