Mutual Inductance Level Sensor for Use in Liquid Metals

Electromagnetic instrumentation capable of measuring the level of liquid metal has been developed at Argonne National Laboratory’s (ANL) Mechanisms Engineering Test Loop (METL). The mutual inductance level sensor (MILS) utilizes the electromagnetic coupling between two coil conductors and a surrounding liquid metal to determine the level of the liquid metal. Mineral insulated cables wrapped on a stainless steel core provide a durable sensor construction. The use of a sealed stainless steel thimble isolates the sensor from the high-temperature liquid metal, allowing for easy sensor maintenance. Modern digital electronics allow for reliable and accurate operation of the sensor. Two sensor variations have been designed and fabricated, and the first variation has seen extensive testing in a non-sodium testing stand as well as in the high-temperature sodium environment of METL. Electromagnetic finite-element analysis studies have been performed using the COMSOL Magnetic Fields Solver. Regular operation of the MILS will commence following in-situ calibration of the sensors in the METL environment.

36 MATERIALS SCIENCE↗

Thermal Hydraulic Experimental Test Article - Report of THETA Commissioning for METL Testing

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, [1], further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned before installing into METL test vessel #4. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article (FY2020 Status Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed. Since the FY19 THETA status report, the THETA primary system components have been assembled and tested using de-ionized water. Some results of this testing at select Richardson and Reynolds numbers are included herein. The custom THETA sodium flowmeter (permanent magnet submersible sodium flowmeter) has been built and calibrated using sodium in an auxiliary facility against a NIST traceable vortex shedder type flowmeter. The permanent magnet flowmeter showed excellent performance, following the theoretical equation for measured voltage quite well, with an error < 3.5% at flow rates ranging from 3-24 GPM at temperatures up to 400 °C. The secondary sodium system for heat rejection from intermediate heat exchanger has been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger have been procured.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2020)

This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2020. The METL facility had a very successful second year of operations having logged over 730 days (as of September 19, 2020) of operations with molten sodium either flowing or static. The METL piping and vessel system was filled with sodium on September 19, 2018 after a successful transfer of sodium from fifteen 55-gallon drums. FY2020 saw the successful reconditioning and insertion of the Gear Test Assembly (GTA) for its second round of testing, the full use of the 18-inch Flexi-Cask system, the second extraction of the GTA from METL, and the removal of sodium from the GTA test article by the carbonation process followed by an alcohol wash. In addition, METL is being prepared to support a second larger experiment, a thermal hydraulic experiment, called Thermal Hydraulic Experimental Test Article (THETA).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gear Test Assembly - Report on Experimental Testing (FY2020)

The Gear Test Assembly (GTA) has completed Campaign #2 of in-sodium testing at the Mechanisms Engineering Test Loop (METL). Campaign #1 was conducted in 2019 and completed 19,600 cycles, correlating to 9,800 fuel assembly maneuvers. Campaign #1 was terminated following a shaft seizure caused by a failed bearing in the sodium gearbox. Campaign #2 was conducted in the spring of 2020 and completed 2,768 cycles, correlating to 1,384 fuel assembly maneuvers. Campaign #2 was terminated following elevated vibration measurements coming from the sodium gearbox. Following cleaning and disassembly, a bearing was found to have failed in the sodium gearbox. Campaign #1 used tapered roller bearings made of 52100 steel with a heat treatment from the manufacturer that allows for operation to 350°C. Campaign #2 used the same tapered roller bearings, but with no heat treatment. A new dynamic shaft seal design was used in Campaign #2 that led to significant reductions in argon consumption and graphite debris generation. A modified external gearbox system led to no external bearing failures and allowed for higher torque output. Finally, modifications to the Carbonation System led to a more effective carbonation process and all-around reduction in turnaround time.

42 ENGINEERING↗

Gripper Test Assembly Status Report (FY2020)

Refueling systems for fast reactors are designed to handle fresh and used core assemblies (fuel, reflector, and shield core assemblies) within the reactor vessel in an opaque coolant environment without visual reference. These refueling machines are designed to work in a sodium (or other fast reactor coolant) and argon vapor space environment and are engineered with the rotatable plug system to allow for the movement of fresh and spent fuel into and out of the reactor core. The refueling machines are a critical component in any reactor and thus need to undergo extensive testing in a prototypic environment to ensure that they will meet all of the system functions and requirements. Argonne has developed an innovative compact refueling system design for the Advanced Fast Reactor-100 that is based upon some mechanisms used in previous reactor designs, such as the U.K.’s Prototype Fast Reactor (PFR) and some mechanisms that have not been used in sodium. This compact refueling machine supports the reduction in size of the AFR-100’s reactor vessel, and if fully developed, would support and inform the development of the in-vessel refueling machines for such commercial reactors as the GEH PRISM reactor plant, the ARC Clean Energy’s ARC-100 reactor, and the Natrium reactor, among others. This refueling system is a vital component of a fast reactor that supports reducing the cost of the reactor and increasing its reliability. During the development of the compact fuel handling machine conceptual design for the AFR-100, a lack of testing data for many mechanical components in sodium under typical in-reactor loads and conditions was discovered. The reduction in lifetime of the various mechanical components in the liquid sodium environment needs to be quantified versus the calculated component lifetimes under normal conditions in the testing while they are subjected to typical loading profiles experienced in the past. The Gripper Test Assembly discussed here includes a full-size gripper device with appropriate mechanical features that will be tested in sodium to provide this testing data. The Gripper Test Assembly is used to test various mechanical fuel handling components submerged in high temperature liquid sodium. These mechanisms are gears, bearings, gripper jaws and head, universal joints and shafts, ball screws, among others. These components will be tested under the typical sodium environmental conditions experienced during refueling operations with appropriate loading conditions that simulate the removal and insertion of core assemblies into a fast reactor grid plate structure. This Gripper Test Assembly is the second in a series of refueling system mechanisms developed for testing in sodium. The first test assembly is the Gear Test Assembly (GTA) which was used to test the performance of gears and bearings operating in sodium. Because of the successful testing conducted with the GTA, it was decided to continue with the development of the Gripper Test Assembly which uses the same gears and bearings tested in GTA. Using the data collected during operation of this gripper test assembly, lifetime reduction factors of the various mechanical components can be calculated for the material combinations selected. These lifetime reduction factors can be used in the design of future mechanical systems which operate in these environments to accurately predict component end of life. In addition, an understanding of the ability of these components and mechanisms to operate under-sodium with the chosen materials will be accomplished. Again, this Gripper Test Assembly is the follow-on test article to the Gear Test Assembly which was testing the ability of gears and bearings operating in a sodium environment. Once fabricated and qualified, it will be tested in the Mechanism Engineering Test Loop (METL) facility located in Building 308 at Argonne National Laboratory.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article - Status Report FY20 Q2

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (like a redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed, most primary component have been fabricated, primary components are being assembled in preparation for initial testing, and procurement is continuing with the secondary system components. Since the FY19 THETA status report, The THETA primary system components are at Argonne National Laboratory (ANL) and have been dry assembled. The secondary sodium system for heat rejection from intermediate heat exchanger has all been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger has been procured.

42 ENGINEERING↗

Status of GTA Gear Inspection after Testing in Sodium

The Mechanisms Engineering Test Loop (METL) is an intermediate-scale liquid metal experimental facility that provides purified reactor-grade (R-grade) sodium to various experimental test vessels. In these test vessels, components that are required to operate in an advanced fast reactor can be tested in a prototypical sodium environment. Experiments conducted in METL significantly assist in the development and maturation of systems and components for advanced reactors. The METL facility consists of multiple test segments including: a purification and diagnostic loop (cold trap was designed after EBR-II), two 18” diameter test vessels with 150 L capacities capable of operating in static or dynamic flow at 538°C, two 28” diameter test vessels with 644 L capacities capable of operating in static or dynamic flow at 650°C, a 3,180 L dump tank with 21 instrumentation ports, and the infrastructure to expand capacity in the future.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mechanisms Engineering Test Loop - Flexicask Design and Testing Report

This report documents the design development and testing of the Flexicask system for the Mechanisms Engineering Test Loop (METL). Currently, METL has completed Phase I construction and has been operating for over a year. The Flexicask system (Figure 1) was designed to allow for the removal and insertion of test articles into a METL test vessel while maintaining an acceptable inert atmosphere to minimize contamination of the METL sodium. This report discusses the design development of the Flexicask system, the commissioning and testing of the system, and the initial use of the Flexicask system to remove the Gear Test Assembly (GTA) from the METL Test Vessel 1.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Thermal Hydraulic Experimental Test Article - Status Report for FY2019 (Rev. 1)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in an SFR. High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. The design work for the facility has been completed and is currently in the procurement, manufacturing and initial testing stage. The THETA primary system, including the redan, inlet and outlet plenum, 38 kW electric core simulant heater, submerged flowmeter, pump, and all instrumentation has either been procured or is currently being tested at Argonne. The secondary sodium system for cooling the tube-side sodium of the intermediate heat exchanger has all been analyzed according to ASME code and is in the final development stages before procurement.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gear Test Assembly - Status Report For FY2019

The final stages of pre-sodium commissioning were completed for the Gear Test Assembly (GTA) in late 2018 and all the components were moved to building 308 for final preparations for insertion into the Mechanisms Engineering Test Loop (METL). The GTA was fully assembled in the experimental test assembly workstation and all supporting electrical and hardware systems were installed on the METL Mezzanine. The GTA was installed in Test Vessel 1 after performing a final systems check, and the vessel and article were raised to operating temperature and held for two weeks to bake-out any moisture present in the components. Test Vessel 1 was filled with sodium and a purification process was completed using the cold trap system. When the sodium was sufficiently clean, Test Vessel 1 was isolated from the rest of METL, and experimental operation of the GTA commenced. The experimental operations consisted of rotating two shafts using Parker servomotors to apply a prototypic torque of a fuel handling mechanism removing and inserting a sodium fast reactor fuel assembly. This removing and inserting motion was repeated until the system seized, indicating component degradation of either the gears or the bearings in the test gearbox. A total of 19,600 cycles were completed, corresponding to the removal and insertion of 9,800 fuel assemblies. The system was shut down and then prepared for removal. The Flexicask System was successfully used to remove the GTA from Test Vessel 1 while keeping both vessel and article inert during the process. The GTA was installed in the Carbonation System, where the process of slowly reacting the sodium away using moist CO 2 has been started. Once the GTA is fully cleaned, it will be disassembled and the gears will undergo the same NDE process performed before testing to quantify the wear that occurred. A report on this, along with the data analysis from the experimental operations will be submitted in late 2019.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report - FY2019

This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2019. The METL facility had a very successful initial year of operations having logged over 365 days of operations with molten sodium either flowing or static. FY2019 saw the commissioning, insertion, and extraction of the first test assembly in METL. In addition, METL is being prepared to support a second experiment, a thermal hydraulic experiment, called Thermal Hydraulic Experimental Test Article (THETA).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Thermal Hydraulic Experimental Test Article: Status Report for FY2019

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in an SFR. High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, the secondary system in the 18-inch Test Vessel #6, and its sodium-to-air heat exchanger will occupy the location for 18-inch Test Vessel #5 (Test Vessel #5 will not be installed), Figure 2. The design work for the facility has been completed and is currently in the procurement, manufacturing and initial testing stage. The THETA primary system, including the redan, inlet and outlet plenum, 38 kW electric core simulant heater, submerged flowmeter, pump, and all instrumentation has either been procured or is currently being tested at Argonne. The secondary sodium system for cooling the tube-side sodium of the intermediate heat exchanger has all been analyzed according to ASME code and is in the final development stages before procurement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mechanisms Engineering Test Loop - Phase I Status Report - FY2018 (Update to FY2017 Report)

This report documents the current status of the Mechanisms Engineering Test Loop (METL) as of August 2018. Currently, METL has completed Phase I construction, performed an initial heat-up of the METL piping, vessels, and components, baked out the facility under vacuum (minus the test vessels), addressed a variety of punchlist items, transferred sodium from 15 55-gallon drums to the dump tank, in the final commissioning/operations stage.

42 ENGINEERING↗

Gear Test Assembly - Status Report FY2018

The gear test assembly completed testing in air and distilled water successfully under a range of loading conditions. An external torque sensor assembly was designed and added to confirm the torque readings provided by the Parker control system. Hand calculations were performed to determine the time range that the heaters could be turned on without exceeding the ASME Boiler and Pressure Vessel code Fatigue Stress Limits for 1,000,000 cycles. Transient computational fluid dynamics analyses were performed to determine the heater cycle on/off time. Steady state computational fluid dynamics analyses were performed to determine the final temperature distribution throughout the insulated assembly using a thinner but more effective insulation configuration. The initial heating tests were completed (without insulation installed) to check the heater control system. Testing of the argon pressurized seal chambers were performed and indicated the need for re-machining of several components to eliminate some leaks. Nondestructive examination of the gears continued successfully using eddy current and ultrasonic inspection techniques.