Configuration Studies for an ST-Based Fusion Nuclear Science Facility
Abstract not provided
Engineering topics
Publications and source records attributed to Kessel, C.
Abstract not provided
A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant. The mission of the pilot plant was set to encompass component test and fusion nuclear science missions yet produce net electricity with high availability in a device designed to be prototypical of the commercial device. The objective of the study was to evaluate three different magnetic configuration options, the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS) in an effort to establish component characteristics, maintenance features and the general arrangement of each candidate device. With the move to look beyond ITER the fusion community is now beginning to embark on DEMO reactor studies with an emphasis on defining configuration arrangements that can meet a high availability goal. This paper reviews the AT pilot plant design, detailing the selected maintenance approach, the device arrangement and sizing of the in-vessel components. Details of interfacing auxiliary systems and services that impact the ability to achieve high availability operations will also be discussed.
A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.
The Tokamak simulation code (TSC) is used to provide initial conditions for predictive TRANSPort and integrated modeling code (PTRANSP) simulations of ITER target steady state scenarios. The PTRANSP simulations are carried out using the new multi-mode (MMM7.1) and the gyro-Landau-fluid (GLF23) transport models. It is found that there are circumstances under which the total fusion power decreases with increasing pedestal temperature height. When the total current (from magnetic axis to plasma edge) is fixed, an increased fraction of the current is concentrated in the pedestal region as the pedestal height is increased. As a consequence of the fixed total current, this results a smaller fraction of the current in the core plasma and, consequently, lower energy confinement. In previous simulations of ITER, in which the fusion power increased with increasing pedestal temperature height, the plasma current from the top of the pedestal to the magnetic axis was held fixed independent of the pedestal temperature. Simulations presented in this paper also indicate that improvement in fusion power production occurs when the lower hybrid current drive is replaced with electron cyclotron current drive. Again, the improvement results from the redistribution of plasma current since the lower hybrid power generally drives current closer to the plasma edge than does the electron cyclotron power. ITER simulation results obtained using the MMM7.1 transport model are compared with those using the GLF23 model. It is found that, in simulations of target steady state scenarios, momentum transport and flow-shear suppression features of the new MMM7.1 model can lead to predictions of internal transport barriers in temperature and rotation frequency.
ITER simulations, in which the temperatures, toroidal angular frequency and currents are evolved, are carried out using the PTRANSP code starting with initial profiles and boundary conditions obtained from TSC code studies. The dependence of heat deposition and current drive on ICRF frequency, number of poloidal modes, beam orientation, number of Monte Carlo particles and ECRH launch angles is studied in order to examine various possibilities and contingencies for ITER steady state and hybrid discharges. For the hybrid discharges, the fusion power production and fusion Q, computed using the Multi-Mode MMM v7.1 anomalous transport model, are compared with those predicted using the GLF23 model. The simulations of the hybrid scenario indicate that the fusion power production at 1000 sec will be approximately 500 MW corresponding to a fusion Q = 10.0. The discharge scenarios simulated aid in understanding the conditions for optimizing fusion power production and in examining measures of plasma performance.
LHCD on Alcator C-Mod is being used in plasmas with parameters similar to those expected on ITER for the purpose of tailoring the plasma current profile. LHCD experiments have also produced intriguing results related to momentum transport and edge pedestal physics that affect the toroidal rotation profile and the temperature and density profiles. Quantitative comparisons between local measurements and theory/simulation have been performed, confirming the off-axis localization of the current drive, as well as its magnitude and location dependence on the launched n{sub parallel} spectrum and electron temperature. Applying LHCD during the current ramp saves volt-seconds and delays the peaking of the current profile. Counter current toroidal rotation during LHCD has been observed in both L and H-mode plasmas. In H-mode plasmas the edge pedestal collisionality is reduced while the overall pressure in the pedestal increases slightly.
For a more detailed account of the results summarized here and for references, see C.T. Holcomb et al., Phys. Plasmas 16, 056116 (2009). Advanced tokamak research on DIII-D is focused on developing a high fusion gain, steady-state scenario that would eliminate or greatly reduce the demands on an inductive transformer in future machines. Steady-state operation requires the inductively driven current density (j{sub Ind}) be zero everywhere. Most of the total current I{sub p} is typically from self-driven bootstrap current, with the remainder driven by external noninductive sources, such as neutral beam and radiofrequency current drive. This paper describes an extension of the fully noninductive condition (f{sub NI} {approx} 100%) to {approx}0.7 current relaxation times that was achieved by a combination of more available ECCD and new scientific insights. The insights are an optimization of performance through variation of the plasma shape parameter known as squareness ({zeta}) and an optimization of divertor magnetic balance. These optimizations simultaneously improve stability, confinement, and density control. These are each essential for achieving fully noninductive operation.