Search NASA⌕ Search

Engineering topics

Keys, Denney J.

Publications and source records attributed to Keys, Denney J..

Wilkinson Microwave Anisotropy Probe (WMAP) Battery Operations Problem Resolution Team (PRT)

The NASA Technical Discipline Fellow for Electrical Power, was requested to form a Problem Resolution Team (PRT) to help assess the health of the flight battery that is currently operating aboard NASA's Wilkinson Microwave Anisotropy Probe (WMAP) and provide recommendations for battery operations to mitigate the risk of impacting science operations for the rest of the mission. This report contains the outcome of the PRT's assessment.

Keys, Denney J.↗

Earth Observing System (EOS) Terra Spacecraft 120 Volt Power Subsystem: Requirements, Development and Implementation

Built by the Lockheed-Martin Corporation, the Earth Observing System (EOS) TERRA spacecraft represents the first orbiting application of a 120 Vdc high voltage spacecraft electrical power system implemented by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC). The EOS TERRA spacecraft's launch provided a major contribution to the NASA Mission to Planet Earth program while incorporating many state of the art electrical power system technologies to achieve its mission goals. The EOS TERRA spacecraft was designed around five state-of-the-art scientific instrument packages designed to monitor key parameters associated with the earth's climate. The development focus of the TERRA electrical power system (EPS) resulted from a need for high power distribution to the EOS TERRA spacecraft subsystems and instruments and minimizing mass and parasitic losses. Also important as a design goal of the EPS was maintaining tight regulation on voltage and achieving low conducted bus noise characteristics. This paper outlines the major requirements for the EPS as well as the resulting hardware implementation approach adopted to meet the demands of the EOS TERRA low earth orbit mission. The selected orbit, based on scientific needs, to achieve the EOS TERRA mission goals is a sun-synchronous circular 98.2degree inclination Low Earth Orbit (LEO) with a near circular average altitude of 705 kilometers. The nominal spacecraft orbit is approximately 99 minutes with an average eclipse period of about 34 minutes. The scientific goal of the selected orbit is to maintain a repeated 10:30 a.m. +/- 15 minute descending equatorial crossing which provides a fairly clear view of the earth's surface and relatively low cloud interference for the instrument observation measurements. The major EOS TERRA EPS design requirements are single fault tolerant, average orbit power delivery of 2, 530 watts with a defined minimum lifetime of five years (EOL). To meet these mission requirements, while minimizing mass and parasitic power losses, the EOS TERRA project relies on 36, 096 high efficiency Gallium Arsenide (GaAs) on Germanium solar cells adhered to a deployable flexible solar array designed to provide over 5,000 watts of power at EOL. To meet the eclipse power demands of the spacecraft, EOS TERRA selected an application of two 54-cell series connected Individual Pressure Vessel (IPV) Nickel-Hydrogen (NiH2) 50 Ampere-Hour batteries. All of the spacecraft observatory electrical power is controlled via the TERRA Power Distribution Unit (PDU) which is designed to provide main bus regulation of 120 Vdc +/- -4% at all load interfaces through the implementation of majority voter control of both the spacecraft's solar array sequential shunt unit (SSU) and the two battery bi-directional charge and discharge regulators. This paper will review the major electrical power system requirement drivers for the EOS TERRA mission as well as some of the challenges encountered during the development, testing, and implementation of the power system. In addition, spacecraft test and early on orbit performance results will also be covered.

Keys, Denney J.↗

EOS-AM1 Nickel Hydrogen Cell

This paper reports the interim results of the Earth Observing System AM-1 project (EOS-AM-1) nickel hydrogen cell life test being conducted under contract to National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) at the Lockheed Martin Missile and Space (LMMS) facility in East Windsor, NJ; and at COMSAT Labs., Clarksburg, MD. The purpose of die tests is to verify that the EOS-AM-1 cell design can meet five years of real-time Low Earth Orbit (LEO) cycling. The tests include both real-time LEO and accelerated stress tests. At LMMS, the first real-time LEO simulated 99 minute orbital cycle started on February 7, 1994 and the test has been running continuously since that time, with 18,202 LEO cycles completed as of September 1, 1997. Each cycle consists of a 64 minute charge (VT at 1.507 volts per cell, 1.06 C/D ratio, followed by 0.6 ampere trickle charge) and a 35 minute constant power discharge at 177 watts (22.5% DOD). At COMSAT, the accelerated stress test consists of 90 minute orbital cycles at 60% DOD with a 30 minute discharge at 60 amperes and a 60 minute charge at 40 amperes (VT at 1.54 volts per cell to 1.09 C/D ratio, followed by 0.6 ampere trickle charge). The real-time LEO life test battery consists of seven, 50AH (nameplate rating) Eagle-Picher, Inc. (EPI) Mantech cells manufactured into three, 3-cell pack assemblies (there are two place holder cells that are not part of the life test electrical circuit). The test pack is configured to simulate the conductive thermal design of the spacecraft battery, including: conductive aluminum sleeves, 3-cell pack aluminum baseplate, and honeycomb panel all mounted to a liquid (-5 C) cold plate. The entire assembly is located in a thermal chamber operating at +30 C. The accelerated stress test unit consists of five cells mounted in machined aluminum test sleeves and is operating at +10 C. The real-time LEO life test battery has met all performance requirements through the first 18,202 cycles, including: end of charge mid discharge cell voltages and voltage gradients; end of charge and discharge cell pressures; within cell and between cell temperature gradients; discharge capacity; current and power levels; and all charge parameters. The accelerated stress test battery has completed 11,998 cycles when the test was terminated. The stress test unit met all test parameters. This paper reports battery perfortnances as a funcfion of cycle life for both the real-time LEO and the accelerated life test regimes.

Bennett, Charles W.↗