FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Developments Towards FRIB Upgrade to 400 MeV/u for Heaviest Uranium Ions

High-Q₀ medium-velocity (beta opt = 0.6) 5-cell elliptical cavities for superconducting linacs are critical technology for advancing current and future projects such as the Proton Improvement Plan II linac and the proposed energy upgrade of Michigan State University’s Facility For Rare Isotope Beams linac, FRIB400. Previous work established the validity of the novel geometry of the FRIB400 prototype 644 MHz 5-cell elliptical β = 0.65 cavities for future high Q₀ development. In collaboration with FNAL, two leading-edge high-Q₀ recipes, N-doping and Mid-T baking, were tested in the 5-cell format. 2/0 N-doping + cold electropolishing was successful at achieving FRIB400 and PIP-II Q₀ requirements, achieving an unprecedented 3.8 x 10¹⁰ at 17.5 MV/m, satisfying the FRIB400 Q₀ requirements by 1.75 times in a low-gauss environment. Mid-T baking exceeded FRIB400 Q₀ requirements by 1.4 times, and benefitted from decreased residual resistance compared to the N-doped cavity test. Systematic ultrasonic thickness measurements in single-cell revealed bulk (150 microns) EP with the modified EP tool is consistent across the inner surfaces of the cavity walls.

43 PARTICLE ACCELERATORS↗

First N-Doping and Mid-T Baking of Medium-ß 644 MHz 5-Cell Elliptical Superconducting RF Cavities for Michigan State University’s Facility for Rare Isotope Beams

Two hadron linacs currently under development in the US, the PIP-II linac at Fermi National Accelerator Laboratory (FNAL) and the upgrade for Michigan State University’s Facility For Rare Isotope Beams (FRIB), will employ 650 and 644 MHz ß-0.6 elliptical superconducting cavities respectively to meet their design energy requirements. The desired CW operation modes of these two linacs sets Q-factor requirements well above any previously achieved for cavities at this operating frequency and velocity, driving the need to explore new high-Q treatments. The N-doping technique developed at FNAL and employed at an industrial scale to the LCLS-II cryomodules is a strong candidate for high-Q treatments, but work is needed to refine the treatment to the lower operating frequency and velocity regime. We present the first results of the first N-doping tests and a "mid-T" bake test in the FRIB 644 MHz 5-cell elliptical cavities.

43 PARTICLE ACCELERATORS↗

Toward Qualifications of HB and LB 650 MHz Cavities for the Prototype Cryomodules for the PIP-II Project

High-beta (HB) and low-beta (LB) 650 MHz cryomodules are key components of the Proton Improvement Plan II (PIP-II) project. In this contribution we present the results of several 5-cell HB650 cavities that have been processed and tested with the purpose of qualifying them for the prototype cryomodule assembly, which will take place later this year. We also present the first results obtained in LB650 single-cell cavities process optimization. Taking advantage of their very similar geometry, we are also analyzing the effect of different surface treatments in FRIB’s 5-cell medium-beta 644MHz cavities. Cavities processed with N-doping and mid-T baking showed very promising results in term of both Q-factors and accelerating gradient for these low-beta structures.

43 PARTICLE ACCELERATORS↗