Search NASA⌕ Search

Engineering topics

Kim, Woohyun

Publications and source records attributed to Kim, Woohyun.

Implementation and validation of optimal start control strategy for air conditioners and heat pumps

Commercial buildings are responsible for approximately 20 % of the total energy consumption and greenhouse gas emissions in the United States. Over 85 % of these buildings lack building automation systems, and many are small (<50,000 square feet), underserved, and use rooftop units (RTUs) for heating, ventilation, and air-conditioning needs. Because these buildings lack proper energy management systems, several operational deficiencies lead to excess energy consumption. Studies have shown that managing the RTUs’ heating and cooling set points, schedules, setbacks, and optimal start can result in a 20 % to 25 % reduction in electricity consumption in small commercial buildings. These buildings typically use fixed schedules to start the RTUs 60 to 120 min before occupancy begins, which results in excess energy consumption. This paper presents research that demonstrates and evaluates the performance of four optimal start methods, which utilize data-based modeling as a key element in facilitating adaptive control in response to time-varying inputs while requiring minimal sensor inputs. The evaluation found energy savings in two commercial buildings equipped with RTUs by periodically alternating four different optimal start models during the cooling and heating season. The resulting energy savings are positive for all models and range from 2 to 5 kWh/day/unit. The units on the east side of the building showed higher savings, while interior units showed greater variability in savings due to the differences in capacities and room sizes. Savings were considerably greater during the heating season compared to the cooling season. The performance of all four models on Mondays was poor; models suggested a shorter optimal start time, which resulted in relatively larger errors. Finally, the future work will look at using a different model for the days after weekends and holidays.

42 ENGINEERING↗

Prevalence of typical operational problems and energy savings opportunities in U.S. commercial buildings

In the United States, as much as 30% of the 19 EJ that commercial buildings consume is considered excess. Much of the excess energy is due to the inability to manage building operations efficiently. Because almost 20% of the total primary energy consumption is associated with commercial buildings, significant energy reductions in this sector are needed to mitigate climate change. Therefore, many cities and states are mandating periodic “tune-ups” of these buildings to eliminate excess energy consumption. Although the benefits of tune-ups and retro-commissioning are clear, focusing these mandates to look for specific opportunities has been a challenge because of the lack of studies that document the prevalence of opportunities. Therefore, we analyzed building automation system data from 151 buildings across the United States to document common operational problems and opportunities to improve building operations. This analysis showed that opportunities to improve building operations exist in almost every building. These opportunities were not strongly correlated with building vintage or size, but were reflective of how the buildings are operated. The prevalence of the top 20 opportunities ranged between 74% and 23%, with 40% of these associated with air-handling units. The rest of the opportunities are associated with schedules, chilled and hot-water distribution, and zone controls. Of the 151 buildings, 69 of them implemented corrective actions of some or all opportunities that were identified. Implementation varied across the Re-tuning categories, with 60% for schedule opportunities, 50% for zone opportunities, over 40% for the air-handling unit and hot-water opportunities, and 35% of the chilled-water opportunities. There was wide variation in whole building energy savings, ranging from 0 to 50% and 0 to 18 $/m2 with median percent annual whole building savings of 12% and median normalized annual cost savings of $1.75/m2. In addition to documenting these key findings, the paper provides a list of opportunities that can be automatically and continuously identified and corrected and offers a list of those opportunities that should be the focus of the mandates.

Katipamula, Srinivas↗

Sequence-to-sequence neural networks for short-term electrical load forecasting in commercial office buildings

The U.S. power grid is transforming to become smarter, cleaner, and more effi- cient. This is leading to the addition of significant distributed variable renew- able generation. Due to the variable nature of renewable generation, the short- and long-term supply-demand imbalances are less predictable, and conventional approaches to mitigating the imbalance will not be efficient or cost-effective. To address this challenge, transactive control technologies have been proposed which balance energy generation and consumption with market activity and in- frastructural limitations. Transactive control requires the ability of individual end-use loads to express flexibility as a function of a transactive signal (e.g., price). Empirical gray- and black-box models have been widely used to express flexibility, and although these approaches are generally easy to construct and simple to use, they do not capture the non-linear behavior that some end-use loads represent . Machine learning approaches have been proposed to address this limitation. Although deep learning approaches for forecasting end-use loads have been explored, certain aspects of the application of deep models to load forecasting are not well understood. These aspects include how much training data is required, and how models should be structured and trained. To that end, this work explores how to approach applying deep recurrent neural networks to short-term electrical load forecasting with a case study of four commercial office buildings. We identify data requirements for training accurate models of whole building electricity use conditioned on outdoor temperature, provide insight into model hyperparameter sensitivity, and demonstrate how readily models can be generalized to unseen buildings.

Skomski, Elliott↗

Application of Intelligent Load Control to Manage Building Loads to Support Rapid Growth of Distributed Renewable Generation

Electricity utilities are faced with the mounting challenge of providing a stable supply of power to meet the growing demand while also integrating rapid growth in distributed variable renewable generation. Traditional means of balancing short- and long-term supply and demand imbalance will be expensive. Alternative approaches of using flexible loads in buildings are needed to mitigate the imbalance at a lower cost. This paper shows how the intelligent load control (ILC) process can be used to manage loads in buildings by dynamically prioritizing loads for curtailment using both quantitative and qualitative criteria. The ILC process can be deployed on low-cost computing platforms without the need for any additional sensing. ILC was first validated in a simulation environment to provide two grid service use cases: (1) managing monthly peak electricity demand and (2) managing buildings’ electricity consumption during a capacity bidding event. After being successfully tested in a simulation environment, ILC was deployed on real buildings to manage electricity consumption to provide two different use cases under different outdoor operating conditions. Both the simulation tests and the real building experiments were deployed using VOLTTRON™, a distributed sensing and control platform. The results from the tests and experiments showed that ILC was able to manage the controllable loads (heat pumps) in the building to maintain the electricity consumption at the desired level without a significant impact on occupant comfort. Overall, the results demonstrate that the ILC allows coordination of the controllable loads and provides a more intelligent means of load management than the traditional duty-cycling approach.

Kim, Woohyun↗