Search NASA⌕ Search

Engineering topics

Kimberly Robinson

Publications and source records attributed to Kimberly Robinson.

CubeSat Payloads on NASA’s Space Launch System Pave the Way for Artemis Moon Missions

Preparing for first launch in 2021, NASA’s Space Launch System (SLS) super heavy-lift launch vehicle will usher in a new era of human spaceflight, returning astronauts to the Moon as part of the Artemis program. Although designed to send crew in the Orion spacecraft and large payloads to the Moon and beyond, SLS also provides CubeSats with rideshare opportunities for missions to deep space. The first launch of SLS and Orion, Artemis I, has 13 6U CubeSats manifested. The payloads have been tested and will soon ship to Kennedy Space Center (KSC) to be integrated into commercial off-the-shelf (COTS) dispensers and integrated into the SLS Block 1 vehicle. Leveraging launches for the Artemis program to deploy rideshare smallsats to deep space provides a low-cost opportunity to perform missions that previously would have required a larger spacecraft and a dedicated launch, and offers additional benefits to both NASA and the smallsat community. CubeSats, including those manifested on the Artemis I flight, have a valuable role to play in the Artemis program, providing data to address NASA’s identified Strategic Knowledge Gaps (SKGs) in its plans to permanently establish humanity in deep space. Payload sponsors and developers for the Artemis I CubeSats hail from a variety of NASA industry partners and mission directorates, as well as international space agencies and universities. Several payloads destined for cislunar space will demonstrate propulsion systems and other technologies useful to future exploration. Science missions manifested on the Artemis I flight include characterizing the effects of deep space radiation on living organisms, searching for hydrogen and other volatiles on the Moon’s South Pole, and studying the lunar radiation environment. Three of the payloads were selected through NASA’s Centennial Challenges Program. Those payloads are competing for prize money while meeting specific technical development goals, such as communication with Earth from millions of miles in space. Student involvement in almost half of the Artemis I payload development allows STEM engagement with SLS and NASA’s Artemis program. As the initial vehicle to fly, the SLS Block 1 vehicle will lay the foundation for a generation of human and robotic deep space exploration missions. The Block 1 core stage is undergoing final testing at Stennis Space Center in 2020 before transportation to KSC for integration and launch in 2021. Following the Block 1 vehicle, the Block 1B and Block 2 vehicles will incorporate propulsion system upgrades and other changes to increase lift capability. In addition to sending the Orion vehicle to TLI, SLS can also be outfitted with large-diameter fairings to send robotic probes to deep space. With unparalleled lift, volume and departure energy, SLS is poised to usher in a new generation of spaceflight. In addition to launching Orion and large-volume missions, CubeSats may also be a part of Artemis missions to deep space.

Kimberly Robinson↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗