Liquid Fuel Qualification for Molten Salt Reactors: Identification of Gaps and Challenges

This report identifies and describes challenges in implementing the MSR fuel qualification process described in NUREG/CR-7299 Fuel Qualification for Molten Salt Reactors. This report provides additional information including examples and additional use case descriptions to assist applicants in understanding the content and structure of the information necessary to develop a fuel qualification report. In particular, the current report emphasizes the relationship of fuel salt qualification to the contents of the plant safety analysis report. This report is limited to the safety functions relevant to the reactor aspects of the nuclear power plant. MSRs that include significant fuel salt processing would also need to address the safety aspects of the processing facility. No significant gaps were found in NUREG/CR-7299. However, NUREG/CR-7299 focuses on generic descriptions of how the fuel salt supports achievement of plant fundamental safety functions. A fuel salt qualification report will need explicitly address the role of the fuel salt in meeting regulatory requirements for a particular plant. NUREG/CR-7299 also provides a regulatory mapping between NRC rules and the safety functions. However, by remaining at a fundamental level, NUREG/CR-7299 does not address plant specific safety analysis. Some aspects of the safety analysis may require additional emphasis for designs that incorporate particular features (such as additional confirmation of decay heat rejection performance for higher power reactors). This report provides additional structure to enable an applicant to develop their plant-specific safety analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Molten Salt Sampling Techniques and Analytical Approaches

Recent global interest in pyroprocessing and molten salt reactors has brought salt sampling methods and techniques back to the forefront of nuclear safeguards concerns. Issues with uranium supplies have also encouraged various countries to pursue advanced nuclear fuel cycles. Tracking nuclear material in molten salt has proven to be a challenge and updating molten salt sampling will greatly help in this endeavor. Molten salt is problematic to sample due to salt stratification, lack of homogeneity, solids, and difficulty with hot cell adaptations. Various salt sampling techniques have been used since before the 1960s including surface, spoon/spatula, and bar solidification. Since then, new types of sampling techniques have been developed to improve sampling results. These include rod/dip, pipet, suction, filtered sampling along with devices such as the Valve Core Sampler and the Multi-Level Sampler. These different approaches are being analyzed and improved upon along with developing requirements for an improved salt sampling device. Work continues to develop salt samplers that are more robust, easier to segment, collect at a specific depth, can work with filters, and can collect fines. Sampling parameters are also being narrowed in terms of stirring, settling time, filtration, depth, etc. In the future, we hope to address deficiencies for process control and nuclear material accountancy control by determining the best way to collect samples that minimizes contaminants and is representative. A compilation of salt sampling approaches, analyses techniques, and an evaluation of findings will be presented.