Search NASA⌕ Search

Engineering topics

King, Lawrence

Publications and source records attributed to King, Lawrence.

LCLS-II Cryomodule Production at JLAB

The LCLS-II cryomodule construction program leverages the mature XFEL cryomodule design to produce technologically sophisticated cryomodules with a minimum of R&D according to an accelerated manufacturing schedule. Jlab, as one of the partner labs, is producing 18 cryomodules for LCLS-II. To meet the quality and schedule demands of LCLS-II, many upgrades to the JLAB cryomodule assembly infrastructure and techniques have been made. JLab has installed a new cleanroom for string assembly and instituted new protocols to minimize particulate transfer into the cavities during the cryomodule construction process. JLab has also instituted a set of magnetic hygiene protocols to be used during the assembly process to minimize magnetic field impingement on the finished cavity structure. The goal has been to have gradients, both maximum and field emission onset, that do not degrade between the cavity vertical test and final cryomodule qualification, while maximizing the Q0 of each finished cavity. Results from the prototype and first production cryomodule assembly are presented.

Davis, Giles↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

43 PARTICLE ACCELERATORS↗

Summary Report for the C50 Cryomodule Project

The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons that produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Paper High power RF tests on WR650 pre-stressed planar windows

A new planar, ceramic window intended to be used with WR650 waveguide fundamental power couplers at 1300 MHz or 1500 MHz has been developed. It is based on the pre-stressed planar window concept tested in PEP II and LEDA. A test stand that made use of the 100kW CW 1500 MHz RF system in the JLAB FEL was commissioned and used to apply up to 80 kW traveling wave (TW)to the windows. Two different types of RF windows (brazed and diffusion bonded ceramics) with design specification of 50 kW CW in TW mode were successfully tested both as a gas barrier (intended to operate up to 2 psi) and as a vacuum barrier. The vacuum windows were able to maintain UHV quality vacuum and were successfully operated in the 10-9 mbar range. An overview of the pre-stressed power windows, RF test stand, procedures and RF power testing results will be presented.

Stirbet, Mircea↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be replaced as well. Currently, five refurbished cryomodules have been installed in CEBAF and are currently operational. This paper will summarize the test results and current operational experience.

Drury, Michael↗

Overview of the First Five Refurbished CEBAF Cryomodules

The Thomas Jefferson National Accelerator Facility is currently engaged in a cryomodule refurbishment project known as the C50 project. The goal of this project is robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project includes removing, refurbishing and replacing ten CEBAF cryomodules at a rate of three per year. Refurbishment includes reprocessing of SRF cavities to eliminate field emission and increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New "dogleg" couplers between the cavity and helium vessel flanges will intercept secondary electrons that produce arcing at the 2 K ceramic window in the fundamental Power Coupler (FPC). Modifications of the external Q (Qext) of the FPC will allow higher gradient operations. Other changes include new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Any damaged or worn components will be repla

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗