Search NASA⌕ Search

Engineering topics

Klebaner, A.

Publications and source records attributed to Klebaner, A..

Status of the PIP-II Cryoplant

The Proton Improvement Plan-II (PIP-II) is an essential upgrade to the Fermilab accelerator complex featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac). The Linac contains 23 SRF cryomodules with the SRF cavities operating at 2 K, a high temperature thermal shield at 40 K and low temperature intercepts at 4.5 K. The PIP-II cryoplant will provide the necessary cooling for the cryomodules and the cryogenic distribution system interconnecting cryoplant and cryomodules. This paper describes the evolution of the PIP-II cryoplant conceptual design and specifications, including the expected heat loads, required cooling features and the integrated design. The cryoplant capacity margin analysis and fast cool-down mode will also be discussed.

43 PARTICLE ACCELERATORS↗

LCLS-II helium cryoplant and cryo distribution system installation

The helium cryoplant and cryo distribution system (CDS) are key elements of the new superconducting Linac Coherent Light Source (LCLS-II) and will provide superfluid helium to the accelerator. The cryoplant consists of two helium refrigerators with an equivalent 4.5 K refrigeration capacity of 18 kW each. The 37 cryomodules of the LINAC will be operated at a temperature of 2.0 K to accelerate a 4 GeV electron beam that will generate extremely bright X-ray laser light. Two five-stage cold compressor cold boxes will be utilized to provide superfluid helium II for the superconducting cavity structures with a total cooling capacity of 8 kW at 2.0 K. This paper describes the installation of the LCLS-II cryoplant and CDS. The LCLS-II cryoplant was designed and contributed by Jefferson Lab. To expedite the project completion the reuse of proven design and technology from the Jefferson Lab CHL-2 cryoplant was the preferred strategy. The CDS consists of ~260 m thermally shielded and vacuum super insulated transfer lines, two distribution boxes and eight feed and end caps, and was designed and contributed by Fermilab. SLAC installed the cryoplant components into a newly erected building and the CDS components into the existing accelerator tunnel and klystron gallery with strong engineering support from both partner labs.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II Cryogenic Distribution System

The LINAC Coherent Light Source II (LCLS-II) located at SLAC National Accelerator Laboratory (SLAC) in Menlo Park, CA, is a U.S. Department of Energy project tasked to design and build a world-class x-ray free-electron laser facility for scientific research. The Linac has superconducting radio frequency cryomodules that are connected to the cryogenic plant by the Cryogenic Distribution System (CDS), which consists of distribution boxes with heat exchangers and reliefs, feed caps, end caps, and surface, vertical, and bypass transfer lines. The CDS components were designed and built to specification by industry. The components have been delivered and their installation at SLAC will be discussed. The as-built relief system design will be presented, showing minimization of relief inlet pressure drops while meeting capacity requirements. The relieving flow pressure drops along the lengths of the CDS to centrally located reliefs at the distribution box were analysed to satisfy Pressure Vessel and Process Piping Code criteria to ensure relief performance. The sub-atmospheric 2 K circuit relieving approach will be discussed, which includes a three-way diverter isolation valve suitable for sub-atmospheric service. The component anchoring load design approach and installation into concrete floor will be discussed. This addresses loading, including seismic loading, along the component’s load path to floor anchoring system.

43 PARTICLE ACCELERATORS↗