Search NASA⌕ Search

Engineering topics

Knight, Ed

Publications and source records attributed to Knight, Ed.

Landsat 9: Mission Status and Prelaunch Instrument Performance Characterization and Calibration

Landsat 9 is currently under development as a joint effort between NASA and the United States Geological Survey (USGS). Landsat 9 is essentially a rebuild of Landsat 8 and has the same two sensors, the Operational Land Imager (OLI) and the Thermal Imaging Sensor (TIRS). The OLI-2 on Landsat 9, is being built by Ball Aerospace and has completed its pre-launch characterization and calibration and is scheduled to be delivered in the summer of 2019. The TIRS-2, being built by Goddard Space Flight Center, is currently undergoing testing through Spring 2019 and also scheduled for summer 2019 delivery. Several improvements to the characterization of both instruments have been incorporated into the testing plan, including improved spectral and radiometric characterization. The instruments will then be integrated onto the spacecraft being built by Northrop Grumman Innovation Systems (NGIS). The mission is targeted to launch as early as December 2020 on an Atlas-5.

Markham, Brian↗

Landsat 9: Mission Status and Prelaunch Instrument Performance Characterization and Calibration

Landsat 9 is currently under development as a joint effort between NASA and the United States Geological Survey (USGS). Landsat 9 is essentially a rebuild of Landsat 8 and has the same two sensors, the Operational Land Imager (OLI) and the Thermal Imaging Sensor (TIRS). The OLI-2 on Landsat 9, is being built by Ball Aerospace and has completed its pre-launch characterization and calibration and is scheduled to be delivered in the summer of 2019. The TIRS-2, being built by Goddard Space Flight Center, is currently undergoing testing through Spring 2019 and also scheduled for summer 2019 delivery. Several improvements to the characterization of both instruments have been incorporated into the testing plan, including improved spectral and radiometric characterization. The instruments will then be integrated onto the spacecraft being built by Northrop Grumman Innovation Systems (NGIS). The mission is targeted to launch as early as December 2020 on an Atlas-5.

Markham, Brian↗

Landsat Data Continuity Mission Calibration and Validation

The primary payload for the Landsat Data Continuity Mission (LDCM) is the Operational Land Imager (OLI), being built by Ball Aerospace and Technologies, under contract to NASA. The OLI has spectral bands similar to the Landsat-7 ETM+, minus the thermal band and with two new bands, a 443 nm band and 1375 nm cirrus detection band. On-board calibration systems include two solar diffusers (routine and pristine), a shutter and three sets of internal lamps (routine, backup and pristine). Being a pushbroom opposed to a whiskbroom design of ETM+, the system poses new challenges for characterization and calibration, chief among them being the large focal plane with 75000+ detectors. A comprehensive characterization and calibration plan is in place for the instrument and the data throughout the mission including Ball, NASA and the United States Geological Survey, which will take over operations of LDCM after on-orbit commissioning. Driving radiometric calibration requirements for OLI data include radiance calibration to 5% uncertainty (1 q); reflectance calibration to 3% uncertainty (1 q) and relative (detector-to-detector) calibration to 0.5% (J (r). Driving geometric calibration requirements for OLI include bandto- band registration of 4.5 meters (90% confidence), absolute geodetic accuracy of 65 meters (90% CE) and relative geodetic accuracy of 25 meters (90% CE). Key spectral, spatial and radiometric characterization of the OLI will occur in thermal vacuum at Ball Aerospace. During commissioning the OLI will be characterized and calibrated using celestial (sun, moon, stars) sources and terrestrial sources. The USGS EROS ground processing system will incorporate an image assessment system similar to Landsat-7 for characterization and calibration. This system will have the added benefit that characterization data will be extracted as part of the normal image data processing, so that the characterization data available will be significantly larger than for Landsat-7 ETM+.

Markham, Brian L.↗