Search NASA⌕ Search

Engineering topics

Knudsen, James K

Publications and source records attributed to Knudsen, James K.

June 2021 SAPHIRE 8 Algorithm Enhancements Status Report

This letter report documents the accomplishments and recommendations for the two subtasks that are part of this contract, SAPHIRE Algorithm Enhancements, as set forth in the NRC IAA NRC-HQ-60-17-T-0007 for the period of June 2020 through June 2021.

97 MATHEMATICS AND COMPUTING↗

Common-Cause Component Group Modeling Issues in Probabilistic Risk Assess

Common cause failures (CCFs) have been recognized as significant risk contributors in probabilistic risk assessments (PRAs) for commercial nuclear power plants (NPPs) since 1980s. A series of reports including those of United States Nuclear Regulatory Commission (NRC) regulations (NUREGs) have been published from late 1980s to early 2000s to provide guidelines for performing CCF event data analysis and modeling CCF in PRA. However, there are still some issues existed in CCF modeling and CCF parameter estimations. One of such issues is the modeling of multiple common-cause component group (CCCG) for the same component in a PRA model. This paper exams the CCCG definition and the requirements from the PRA standard, investigates the CCCG modeling practices and issues existing in PRAs, and presents systematic approaches and guidelines to model CCCG in PRA properly and consistently.

99 GENERAL AND MISCELLANEOUS↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Coupling RAVEN to SAPHIRE for Performing Time Dependent Probabilistic Risk Assessment

Cost Risk Analysis Framework Tool (CRAFT) was recently developed by Idaho National Laboratory (INL) to perform economical risk analysis by combining physics, risk and cost information of components in a Nuclear Power Plant (NPP) that can be quickly deployable through the nuclear industry to evaluate the risk associated to capital projects and asset management [1]. In this framework, RAVEN is coupled with SAPHIRE to perform the time dependent risk/safety assessment of NPPs. Traditionally, the risk associated to the NPPs can be determined by classical Probabilistic Risk Assessment (PRA) tools, such as SAPHIRE, under the assumption that all failure rates are constant over time. In some circumstances, however, the assumption is rendered invalid since that the failure rate of a component may gradually change in a systematic way, for example, because of aging and degradation. In addition, recent data analysis in [2] has suggested decreasing values of failure rates for several important components of NPPs. A PRA that includes these components should employ the time-dependent failure rates in order to accurately estimate the risk at any given time. This time-dependent PRA is achieved by the coupling between RAVEN and SAPHIRE.

42 ENGINEERING↗

Evaluation Between Existing and Improved CCF Modeling Using the NRC SPAR Models

Abstract: The NRC SPAR models currently employ the alpha factor common cause failure (CCF) methodology and model CCF for a group of redundant components as a single “rolled-up” basic event. These SPAR models will be updated to employ a more computationally intensive and accurate approach by expanding the CCF basic events for all active components to include all terms that appear in the Basic Parameter Model (BPM). A discussion is provided to detail the differences between the rolled-up common cause group (CCG) and expanded BPM adjustment concepts based on differences in core damage frequency and individual component importance measures. Lastly, a hypothetical condition is evaluated with a SPAR model to show the difference in results between the current adjustment method (rolled-up CCF events) and the newer method employing all of the expanded terms in the BPM. The event evaluation on the SPAR model employing the expanded terms will be solved using the graphical evaluation module (GEM) and the proposed method discussed in Reference 1.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗