New Tool Evaluates the Financial Viability of Pumped Storage Hydropower

The rapidly evolving electricity system with increasing variable renewable energy (VRE) resources provides both opportunities and challenges for the power sector. With the significant ramps and intermittency associated with VRE resources, the requirements and need for additional flexible resources increase. Pumped storage hydropower (PSH) provides flexibility to the electricity grid to replace fossil fuel plants, which are responsible for 25% of U.S. emissions. PSH projects support various aspects of power system operations, including flexibility, ramping capability, energy, ancillary service, black start, and others. The significant potential of hydropower requires understanding the different value drivers to the electricity system specific to the location of a project and then optimizing the plant for the different system values. Thus, determining the value of PSH projects and their many services and contributions to the electricity system can be a challenge for potential developers, system owners, regulators, policy makers, and consultants.

13 HYDRO ENERGY↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

Reservoir Lining for Pumped Storage Hydropower: Scoping Study of Geomembrane Lining Systems

This report summarizes the results of a scoping study performed to research the use of geomembrane lining systems for pumped storage hydropower (PSH) reservoirs. The study consisted of a literature review for pertinent and publicly available information about geomembrane lining materials and their use in dams, reservoirs, and PSH as well as an assessment of the applicability of geomembrane lining systems to PSH reservoirs.

13 HYDRO ENERGY↗

Techno-Economic Studies for Pumped Storage Hydropower (Final CRADA Report)

The research focused on estimating the value of various services and contributions that pumped storage hydropower (PSH) provides to the grid, especially in locations characterized by high penetration of variable renewable energy resources. Under this CRADA, the Participant provided the Contractors with non-proprietary data and information on the proposed Banner Mountain PSH project that describe project’s technoeconomic and environmental characteristics, planned market and business models, and other relevant information necessary to describe the proposed project and its planned operations. The Contractors analyzed this information and performed various technoeconomic studies to estimate the value of different services and contributions that PSH project could provide to the grid. The outcome of this CRADA was a detailed technoeconomic analysis conducted in a comprehensive cost–benefit and decision analysis framework.

13 HYDRO ENERGY↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

1.2.4.403 - Pumped Storage Hydropower FAST Commissioning Prize

The Pumped Storage Hydropower (PSH) FAST Commissioning Prize aimed to reduce the time, cost, and risk required to commission PSH projects by crowdsourcing ideas via a three-stage prize. Objectives were to reduce the time to commission PSH projects from 10+ years to less than 5 years and to develop a baseline analysis for PSH.

HYDRO ENERGY↗

A Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation

Energy storage technologies—including pumped storage hydropower (PSH), batteries, and other technologies—have been technically proven to be capable of providing transmission services by regulating power flows and providing voltage support. These technologies will potentially increase the flexibility of transmission infrastructure and may defer (or eliminate) the need for transmission upgrades or new investments. On the regulatory side, Congress and the Federal Energy Regulatory Commission (FERC) have issued several orders over decades that have established energy storage’s (ES) eligibility as a transmission asset. The orders have required transmission planning entities to provide a level playing field where ES can participate in the transmission planning process (TPP) without undue discrimination and preference of technology. These developments pave the way for ES to participate in transmission planning as a transmission asset. On the other hand, as a flexible resource, ES can play an important role in the electricity market to enable more renewable energy integration by providing energy and grid reliability services. This could bring more revenue in return.

25 ENERGY STORAGE↗

A Review of Technology Innovations for Pumped Storage Hydropower

Although pumped storage hydropower (PSH) has been around for many years, the technology is still evolving. At present, many new PSH concepts and technologies are being proposed or actively researched. This study performs a landscape analysis to establish the current state of PSH technology and identify promising new concepts and innovations.

13 HYDRO ENERGY↗

Modeling Power Plant Siting Opportunities and Constraints in the Eastern Interconnection

The electrical transmission grid is a critical part of the U.S. national infrastructure, and its modernization is a U.S. Department of Energy (DOE) priority. We describe the Energy Zones Mapping Tool (EZMT), a unique, powerful, and public web-based system with multi-criteria decision analysis (MCDA) models for more than 20 power plant technologies and many other capabilities. Through a case study on natural gas combined cycle (NGCC) power plants in the Eastern Interconnection (EI), we provide an example of incorporating an EZMT MCDA model into a larger planning context, with projections of interconnection-level capacity expansion, thermoelectric power plant retirements, and water availability. Our results provide insights on candidate NGCC site distributions and the criteria influencing them. The case study provides both an efficient methodology for performing similar analyses and hundreds of candidate NGCC power plant sites that can be studied in more detail as potential project sites.

20 FOSSIL-FUELED POWER PLANTS↗

Pumped Storage Hydropower Valuation Guidebook: A Cost-Benefit and Decision Analysis Valuation Framework

As an energy storage technology, pumped storage hydropower (PSH) supports various aspects of power system operations. However, determining the value of PSH plants and their many services and contributions to the system has been a challenge. While there is a general understanding that PSH resources provide many services and benefits for the operation of power systems, estimating the value of these services—and especially the monetary value of some of those services—has been a challenge. The objective of this project, funded by the U.S. Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), is to advance the state of the art in assessing the value of PSH plants and their contributions to the power system. The specific goal is to develop detailed, step-by-step valuation guidance that PSH developers, plant owners or operators, and other stakeholders can use to assess the value of existing or potential new PSH plants and their services. The specific goals of this project are: (1) to develop comprehensive and transparent valuation guidance that will support consistent valuation assessments and comparisons of PSH projects or project design alternatives, (2) to test the PSH valuation guidance and its underlying methodology by applying it to two selected PSH projects, and (3) to transfer and disseminate the PSH valuation guidance to the hydropower industry, PSH developers, and other stakeholders. The authors believe that the application of a consistent, transparent, and repeatable valuation process will advance valuation assessments and allow stakeholders to compare valuation analyses performed for different PSH projects or design alternatives. It will also increase the acceptance of valuation results and enable better understanding of the true value that PSH technology brings to the grid.

13 HYDRO ENERGY↗

Pumped Storage Hydropower (PSH) FAST Commissioning Prize Technical Analysis

The US energy landscape has undergone major changes over the past 10 years and will continue to see significant changes in future decades as the power grid increases its reliance on variable renewable energy resources. Because of the inherent variability of these resources, renewable energy growth may require additional energy storage capacity to provide flexible load-following capabilities and other grid services that can quickly adjust to changes in energy demand and generation. Pumped storage hydropower (PSH)—one such energy storage technology—uses pumps to convey water from a lower reservoir to an upper reservoir for energy storage and releases water back to the lower reservoir via a powerhouse for hydropower generation. PSH facility pump and generation cycling often follows economic and energy demand conditions. Across the United States, 43 PSH facilities are in operation and 55 projects are in various permitting or licensing stages. Altogether, the 43 operational projects provide the wide majority (95%) of utility-scale electricity storage in the United States. These facilities also provide significant power and nonpower grid benefits, including large-scale electrical system reserve capacity, grid reliability support, and electricity supply-demand balancing through quick-response capabilities and operational flexibility. PSH systems can accomplish these at a scale (e.g., size) and cost that makes these systems highly attractive from a technical standpoint. Although these research concepts are still in their infancy, they demonstrate promising potential as future PSH energy storage technologies. Although PSH has many advantages, development in the United States has effectively stalled since the 1990s, partially because of the magnitude of project costs and financing interest during development and construction, the length of time from project investment until project revenue begins, permitting challenges, construction risks, competition from other storage technologies (e.g., batteries, hydrogen storage), and electricity market evolution and uncertainty. In short, the time, cost, and risk associated with modern PSH development have resulted in limited growth in the United States recently, despite the growing energy storage demand stemming from increased wind and solar power deployment. Technology innovation is needed to help reduce PSH commissioning time, cost, and risk, particularly during the post-licensing phase of project development. To address challenges facing the PSH industry and to improve PSH commissioning timelines, the US Department of Energy (DOE) Water Power Technologies Office (WPTO) initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning Prize project.

13 HYDRO ENERGY↗

An Evaluation of Energy Storage Cost and Performance Characteristics

The energy storage industry continues to expand globally as costs continue to fall and opportunities in consumer, transportation and grid applications are defined. As the rapid evolution of the industry continues, it has become increasingly important to understand how varying technologies compare in terms of cost and performance. This paper defines and evaluates cost and performance parameters of six battery energy storage technologies (BESS) - lithium-ion batteries, lead-acid batteries, redox flow batteries, sodium-sulfur batteries, sodium metal halide batteries, and zinc-hybrid cathode batteries - four non-BESS storage technologies - pumped storage hydropower, flywheels, compressed air energy storage, and ultracapacitors - and combustion turbines. Cost and performance information was compiled based on an extensive literature review, conversations with vendors and stakeholders, and costs of systems procured at sites across the United States. Detailed cost and performance estimates are presented for 2018 and projected out to 2025. Annualized costs were also calculated for each technology.

Mongird, Kendall↗