Search NASA⌕ Search

Engineering topics

Kourbanis, I.

Publications and source records attributed to Kourbanis, I..

At least 19 records

FLUKA-MARS15 Simulations to Optimize Fermilab PIP-II Movable Beam Absorber

PIP-II is the Fermilab's flagship project to provide powerful, high-intensity proton beams to the laboratory's experiments. The heart of the PIP-II project is an H- 800 MeV superconducting linear accelerator. In order to commission the beam and operate safely the linac, several constraints were evaluated. The design of a movable 5 kW beam absorber was finalized to allow staged beam commissioning in different linac locations. Prompt and residual radiation levels were calculated, and radiation shields were optimized to keep those values within the acceptable levels in the areas surrounding beam absorber. Monte Carlo calculations with FLUKA and MARS15 codes are presented in the paper to support these studies.

43 PARTICLE ACCELERATORS↗

New constraints on oscillation parameters from {nu}e appearance and {nu}{mu} disappearance in the NOvA experiment

We present updated results from the NOvA experiment for v(mu) -> v(mu) and v(mu) -> v(e) oscillations from an exposure of 8.85 x 10(20) protons on target, which represents an increase of 46% compared to our previous publication. The results utilize significant improvements in both the simulations and analysis of the data. A joint fit to the data for v(mu) disappearance and v(e) appearance gives the best-fit point as normal mass hierarchy, Delta m(32)(2) = 2.44 x 10(-3) eV(2)/c(4), sin(2) theta(23) = 0.56, and delta(CP) = 1.21 pi. The 68.3% confidence intervals in the normal mass hierarchy are Delta m(32)(2) is an element of[2.37, 2.52] x 10(-3) eV(2)/c(4) , sin(2) theta(23) is an element of [0.43; 0.51] boolean OR [0.52; 0.60], and delta(CP) is an element of [0, 0.21 pi] boolean OR [0.91 pi, 2 pi]. The inverted mass hierarchy is disfavored at the 95% confidence level for all choices of the other oscillation parameters.

Acero, M. A.↗

Search for active-sterile neutrino mixing using neutral-current interactions in NOvA

Here, we report results from the first search for sterile neutrinos mixing with active neutrinos through a reduction in the rate of neutral-current interactions over a baseline of 810 km between the NOvA detectors. Analyzing a 14-kton detector equivalent exposure of 6.05 × 10 20 protons-on-target in the NuMI beam at Fermilab, we observe 95 neutral-current candidates at the Far Detector compared with 83.5 ± 9.7(stat) ± 9.4(syst) events predicted assuming mixing only occurs between active neutrino species. No evidence for νμ→νs transitions is found. Interpreting these results within a 3+1 model, we place constraints on the mixing angles θ 24 < 20.8° and θ 34 < 31.2° at the 90% C.L. for 0.05 eV 2 ≤ Δm 41 2 ≤ 0.5 eV 2 , the range of mass splittings that produce no significant oscillations over the Near Detector baseline.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Constraints on oscillation parameters from v e appearance and v μ disappearance in NOvA

Results are reported from an improved measurement of ν μ → ν e transitions by the NOvA experiment. Using an exposure equivalent to 6.05 × 10 20 protons on target, 33 νe candidates are observed with a background of 8.2 ± 0.8 (syst.). In this paper, combined with the latest NOvA νμ disappearance data and external constraints from reactor experiments on sin 2 2θ 13 , the hypothesis of inverted mass hierarchy with θ 23 in the lower octant is disfavored at greater than 93% C.L. for all values of δ CP .

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Transition Crossing in the Main Injector for PIP-II

Proton Improvement Plan-II (PIP-II) [1] is Fermilab’s plan for providing powerful, high-intensity proton beams to the laboratory’s experiments. PIP II will include upgrades to the Booster, Recycler and Main Injector which will be required to accelerate 50% more beam as well as increasing the Booster repetition rate from 15 to 20 Hz. To accommodate the faster rate, the momentum separation of the slip stacking beams in the Recycler must increase which will result in in larger longitudinal emittance bunches in MI. In order to cross transition without losses, it is expected a gamma-t jump will be needed. Gamma-t jump schemes for the MI are investigated.

Ainsworth, R.↗

Measurement of the neutrino mixing angle θ 23 in NOvA

This Letter reports new results on muon neutrino disappearance from NOvA, using a 14 kton detector equivalent exposure of $6.05\times10^{20}$ protons-on-target from the NuMI beam at the Fermi National Accelerator Laboratory. The measurement probes the muon-tau symmetry hypothesis that requires maximal mixing ($\theta_{23} = \pi/4$). Assuming the normal mass hierarchy, we find $\Delta m^2 = (2.67 \pm 0.11)\times 10^{-3}$ eV$^2$ and $\sin^2 \theta_{23}$ at the two statistically degenerate values $0.404^{+0.030}_{-0.022}$ and $0.624^{+0.022}_{-0.030}$, both at the 68% confidence level. Finally, our data disfavor the maximal mixing scenario with 2.6 $\sigma$ significance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

Transition Crossing in the Main Injector for PIP-II

Proton Improvement Plan-II (PIP-II) is Fermilab’s plan for providing powerful, high-intensity proton beams to the laboratory’s experiments. PIP II will include upgrades to the Booster, Recycler and Main Injector which will be required to accelerate 50% more beam as well as increasing the Booster repetition rate from 15 to 20 Hz. To accommodate the faster rate, the momentum separation of the slip stacking beams in the Recycler must increase which will result in in larger longitudinal emittance bunches in MI. In order to cross transition without losses, it is expected a gammat jump will be needed. Gamma-t jump schemes for the MI are investigated

43 PARTICLE ACCELERATORS↗

Resistive Wall Growth Rate Measurements in the Fermilab Recycler

Impedance could represent a limitation of running high intensity beams in the Fermilab recycler. With high intensity upgrades foreseen, it is important to quantify the impedance. To do this,studies have been performed measuring the growth rate of presumably the resistive wall instability. The growth rates at varying intensities and chromaticities are shown. The measured growth rates are compared to ones calculated with the resistive wall impedance.

Ainsworth, R.↗

Fermilab Recycler Collimation System Design

To provide 700 kW proton beams for neutrino production in the NuMI facility, we employ slip stacking in the Recycler with transfer to the Main Injector for recapture and acceleration. Slip stacking with 12 Booster batches per 1.33 sec cycle of the Main Injector has been implemented and briefly tested while extensive operation with 8 batches and 10 batches per MI cycle has been demonstrated. Operation in this mode since 2013 shows that loss localization is an essential component for long term operation. Beam loss in the Recycler will be localized in a collimation region with design capability for absorbing up to 2 kW of lost protons in a pair of 20-Ton collimators (absorbers). This system will employ a two stage collimation with a thin molybdenum scattering foil to define the bottom edge of both the injected and decelerated-for-slipping beams. Optimization and engineering design of the collimator components and radiation shielding are based on comprehensive MARS15 simulations predicting high collimation efficiency as well as tolerable levels of prompt and residual radiation. The system installation during the Fermilab 2016 facility shutdown will permit commissioning in the subsequent operating period.

43 PARTICLE ACCELERATORS↗

The Measurement of the Anomalous Magnetic Moment of the Muon at Fermilab

The anomalous magnetic moment of the muon is one of the most precisely measured quantities in experimental particle physics. Its latest measurement at Brookhaven National Laboratory deviates from the Standard Model expectation by approximately 3.5 standard deviations. The goal of the new experiment, E989, now under construction at Fermilab, is a fourfold improvement in precision. Here in this article, we discuss the details of the future measurement and its current status.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.

43 PARTICLE ACCELERATORS↗

Issues and R&D Required for the Intensity Frontier Accelerators

Operation, upgrade and development of accelerators for Intensity Frontier face formidable challenges in order to satisfy both the near-term and long-term Particle Physics program. Here we discuss key issues and R&D required for the Intensity Frontier accelerators.

43 PARTICLE ACCELERATORS↗