PIP-II Project Overview and Status

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV superconducting radio frequency (SRF) linac, which comprises a room temperature front end followed by an SRF section. The SRF section consists of five different flavors of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at, or above, state-of-the-art parameters. The first two PIP-II cryomodules, Half Wave Resonator (HWR) and Single Spoke Resonator 1 (SSR1) were installed in the PIP-II Injector Test facility (PIP2IT) and have accelerated beam to above 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was baselined in April 2022, and the construction phase is underway.

43 PARTICLE ACCELERATORS↗

Improvements to the Recycler/Main Injector to Deliver 850 kW+

The Main Injector is used to deliver a 120 GeV high power proton beam for Neutrino experiments. The design power of 700 kW was reached in early 2017 but further improvements have seen a new sustained peak power of 893 kW. Two of the main improvements include the shortening of the Main Injector ramp length as well optimizing the slip-stacking procedure performed in the Recycler to reduce the amount of uncaptured beam making its way into the Main Injector. These improvements will be discussed in this paper as well future upgrades to reach higher beam powers.

43 PARTICLE ACCELERATORS↗

An Upgrade Path for the Fermilab Accelerator Complex

The completion of the PIP-II project and its superconducting linear accelerator will provide up to 1.2 MW of beam power to the LBNF/DUNE facility for neutrino physics. It will also be able to produce high-power beams directly from the linac that can be used for lower-energy particle physics experiments as well, such as directing beam toward the Muon Campus at Fermilab for example. Any further significant upgrade of the beam power to DUNE, however, will be impeded by the limitations of the present Booster synchrotron at the facility. To increase the power to DUNE by a factor of two would require a new accelerator arrangement to feed the Main Injector that does not include the Booster. In what follows, a path toward upgrading the Fermilab accelerator complex to bring the beam power for DUNE to 2.4 MW is presented, using a new rapid-cycling synchrotron plus an energy upgrade to the PIP-II linac. The path includes the ability to instigate a new lower-energy, very high-power beam delivery system for experiments that can address much of the science program presented by the Booster Replacement Science Working Group. It also allows for the future possibility to go beyond 2.4 MW up to roughly 4 MW from the Main Injector.

43 PARTICLE ACCELERATORS↗

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler

The Fermilab Main Injector system delivers 700 kW of 120 GeV Proton beam for neutrino experiments. Since 2013 this has been achieved using slip stacking accumulation in the Recycler with up to 12 batches from the Fermilab Booster per Main Injector Ramp Cycle. To control activation from beam loss, collimation systems in the Booster to Recycler transfer line, in the Recycler and in the Main Injector are employed. Residual radiation measurements around the ring with detailed studies at the collimators are required to maintain adequate loss control. We will review design considerations, operational parameters and activation results for more than ten years of operation. Simulations with MARS15 are used to explore the activation rates and the isotopic composition of the resulting activation.

43 PARTICLE ACCELERATORS↗

FLUKA-MARS15 simulations to optimize the Fermilab PIP-II movable beam absorber

PIP-II is the Fermilab's flagship project to provide powerful, high-intensity proton beams to the laboratory's experiments. The heart of the PIP-II project is an H- 800 MeV superconducting linear accelerator. In order to commission the beam and operate safely the linac, several constraints were evaluated. The design of a movable 5 kW beam absorber was finalized to allow staged beam commissioning in different linac locations. Prompt and residual radiation levels were calculated, and radiation shields were optimized to keep those values within the acceptable levels in the areas surrounding beam absorber. Monte Carlo calculations with FLUKA and MARS15 codes are presented in the paper to support these studies.

43 PARTICLE ACCELERATORS↗

Energy Deposition, Radiological and Thermal Studies for Linac-to-Booster Transfer Line Beam Absorber

The PIP-II Linac-to-Booster transfer line will transport the beam from the end of the superconducting Linac to the Injection Girder of the Booster. The transfer line consists of two arcs and a straight section in between (see Fig. 1). The straight section splits into two separate lines: Beam Absorber and Mu2e experiment lines. In this paper, results of energy deposition studies for the Beam Absorber, performed with MARS15 Monte Carlo code for normal operation, are presented. Also, corresponding thermal analyses with ANSYS code are described. According to PIP-II design parameters, the beam energy as high as 1 GeV is considered. Two beam power options were studied: (i) 50 kW as a conservative estimate for a permanent absorber; (ii) 5 kW as an option for a portable absorber required for a commissioning stage.

43 PARTICLE ACCELERATORS↗

High Intensity Proton Stacking at Fermilab: 700 kW Running

As part of the Nova upgrades in 2012, the Recycler was repurposed as proton stacker for the Main Injector with the aim to deliver 700 kW. Since January 2017, this design power has been run routinely. The steps taken to commission the Recycler and run at 700 kW operationally will be discussed as well as plans for future running.

43 PARTICLE ACCELERATORS↗

Automating Orbit Correction in the Main Injector 8 GeV Line

The Main Injector 8 GeV line (MI8 line) transports beam from Fermilab's Booster accelerator to either the Booster Neutrino experiments (BNB), the Recycler or the Main Injector. Often the orbit of the beam through the MI8 line differs depending on the beam destination. The beam is collimated in the MI8 line, so increasing intensities and repetition rates make controlling orbits through the collimators a necessity. The current method of regulating the MI8 line orbit with DC corrector settings is insufficient. A system named MITUNE is being developed to sample and categorize all beams through the MI8 line and automatically calculate and apply proper dipole corrector ramps to maintain desired orbits for pulses to any destination.

43 PARTICLE ACCELERATORS↗

Simulations and Measurements of Stopbands in the Fermilab Recycler

Fermilab has recently completed an upgrade to the complex with the goal of delivering 700 kW of beam power as 120 GeV protons to the NuMI target. A major part of boosting beam power is to use the Fermilab Recycler to stack protons. Simulations focusing on the betatron resonance stopbands are presented taking into account different effects such as intensity and chromaticity. Simulations are compared with measurements.

43 PARTICLE ACCELERATORS↗

Estimating the Transverse Impedance in the Fermilab Recycler

Impedance could represent a limitation of running high intensity bunches in the Fermilab recycler. With high intensity upgrades foreseen, it is important to quantify the impedance. To do this, studies have been performed measuring the tune shift as a function of bunch intensity allowing the transverse impedance to be derived.

43 PARTICLE ACCELERATORS↗

Space Charge Simulations in the Fermilab Recycler for PIP-II

Proton Improvement Plan-II (PIP-II) is Fermilab's plan for providing powerful, high-intensity proton beams to the laboratory's experiments. Upgrades are foreseen for the recycler which will cope with bunches containing fifty percent more beam. Of particular concern is large space charge tune shifts caused by the intensity increase. Simulations performed using Synergia are detailed focusing on the space charge footprint.

43 PARTICLE ACCELERATORS↗

Fast Transverse Instability and Electron Cloud Measurements in Fermilab Recycler

A new transverse instability is observed that may limit the proton intensity in the Fermilab Recycler. The instability is fast, leading to a beam-abort loss within two hundred turns. The instability primarily affects the first high-intensity batch from the Fermilab Booster in each Recycler cycle. This paper analyzes the dynamical features of the destabilized beam. The instability excites a horizontal betatron oscillation which couples into the vertical motion and also causes transverse emittance growth. This paper describes the feasibility of electron cloud as the mechanism for this instability and presents the first measurements of the electron cloud in the Fermilab Recycler. Direct measurements of the electron cloud are made using a retarding field analyzer (RFA) newly installed in the Fermilab Recycler. Indirect measurements of the electron cloud are made by propagating a microwave carrier signal through the beampipe and analyzing the phase modulation of the signal. The maximum betatron amplitude growth and the maximum electron cloud signal occur during minimums of the bunch length oscillation.

43 PARTICLE ACCELERATORS↗

Progress Towards Doubling the Beam Power at Fermilab's Accelerator Complex

After a 16 month shutdown to reconfigure the Fermilab Accelerators for high power operations, the Fermilab Accelerator Complex is again providing beams for numerous Physics Experiments. By using the Recycler to slip stack protons while the Main Injector is ramping, the beam power at 120 GeV can reach 700 KW, a factor of 2 increase. The progress towards doubling the Fermilab's Accelerator complex beam power will be presented.

43 PARTICLE ACCELERATORS↗

Project X

Particle physics has made enormous progress in understanding the nature of matter and forces at a fundamental level and has unlocked many mysteries of our world. The development of the Standard Model of particle physics has been a magnificent achievement of the field. Many deep and important questions have been answered and yet many mysteries remain. The discovery of neutrino oscillations, discrepancies in some precision measurements of Standard-Model processes, observation of matter-antimatter asymmetry, the evidence for the existence of dark matter and dark energy, all point to new physics beyond the Standard Model. The pivotal developments of our field, including the latest discovery of the Higgs Boson, have progressed within three interlocking frontiers of research – the Energy, Intensity and Cosmic frontiers – where discoveries and insights in one frontier powerfully advance the other frontiers as well.

43 PARTICLE ACCELERATORS↗

Operational Use of Ionization Profile Monitors in the Fermilab Main Injector

Ionization profile monitors (IPMs) are used in the Fermilab Main Injector (MI) to monitor injection lattice matching by measuring turn-by-turn sigmas at injection and to measure transverse emittance of the beam during the acceleration cycle. The IPMs provide a periodic, non-destructive means of performing turn-by-turn emittance measurements where other techniques are not applicable. As Fermilab is refocusing its attention on the intensity frontier, non-intercepting diagnostics such as IPMs are expected to become even more important. This paper gives an overview of the operational use of IPMs for emittance measurements and injection lattice matching measurements at Fermilab, and summarizes the future plans.

43 PARTICLE ACCELERATORS↗