Search NASA⌕ Search

Engineering topics

Kraly, E. F.

Publications and source records attributed to Kraly, E. F..

Payload influences on technology development and utilization of the Space Shuttle extravehicular mobility unit

Historical EVA approaches are examined. The considered data emphasize the overall importance of EVA for Shuttle payload operations. Twenty requirement categories related to crew protection, crew performance, and payload protection are listed in a table. Attention is given to a preliminary assessment of payload related requirements, an evaluation of the natural thermal environment in the case of the Shuttle orbiter bay, and the ability of the extravehicular mobility unit (EMU) to protect the crewman from induced or natural radiation as found in the Van Allen radiation belt South Atlantic anomaly. On the basis of the evaluation it appears very likely that design improvements alone can make the EMU meet payload requirements without requiring significant technology advances.

Patrick, J. W.↗

Study to evaluate the effect of EVA on payload systems. Volume 1: Executive summary

Programmatic benefits to payloads are examined which can result from the routine use of extravehicular activity (EVA) during space missions. Design and operations costs were compared for 13 representative baseline payloads to the costs of those payloads adapted for EVA operations. The EVA-oriented concepts developed in the study were derived from these baseline concepts and maintained mission and program objectives as well as basic configurations. This permitted isolation of cost saving factors associated specifically with incorporation of EVA in a variety of payload designs and operations. The study results were extrapolated to a total of 74 payload programs. Using appropriate complexity and learning factors, net EVA savings were extrapolated to over $551M for NASA and U.S. civil payloads for routine operations. Adding DOD and ESRO payloads increases the net estimated savings of $776M. Planned maintenance by EVA indicated an estimated $168M savings due to elimination of automated service equipment. Contingency problems of payloads were also analyzed to establish expected failure rates for shuttle payloads. The failure information resulted in an estimated potential for EVA savings of $1.9 B.

Patrick, J. W.↗