Search NASA⌕ Search

Engineering topics

Krasnykh, A

Publications and source records attributed to Krasnykh, A.

S-Band Loads for SLAC Linac

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

36 MATERIALS SCIENCE↗

A Stability of LCLS Linac Modulators

Information concerning to a stability of LCLS RF linac modulators is allocated in this paper. In general a 'pulse-to-pulse' modulator stability (and RF phase as well) is acceptable for the LCLS commission and FEL programs. Further modulator stability improvements are possible and approaches are discussed based on our experimental results.

43 PARTICLE ACCELERATORS↗

Measurements of the Electron Cloud Density in the PEP-II Low Energy Ring

Clouds of low energy electrons in the vacuum beam pipes of accelerators of positively charged particle beams present a serious limitation for operation of these machines at high currents. Because of the size of these accelerators, it is difficult to probe the low energy electron clouds over substantial lengths of the beam pipe. We have developed a novel technique to directly measure the electron cloud density via the phase shift induced in a TE wave that is independently excited and transmitted over a section of the accelerator. We infer the absolute phase shift with relatively high accuracy from the phase modulation of the transmission due to the modulation of the electron cloud density from a gap in the positively charged beam. We have used this technique for the first time to measure the average electron cloud density over a 50 m straight section in the positron ring of the PEP-II collider at the Stanford Linear Accelerator Center. We have also measured the variation of the density by using low field solenoid magnets to control the electrons.

43 PARTICLE ACCELERATORS↗

High-Current Effects in the PEP-II Storage Ring

The PEP-II B-Factory operated at peak and integrated luminosity several times the original design values. Its storage rings operated at world-record beam currents with bunch lengths of about 10 mm. Correspondingly significant heat load was imposed on the vacuum system, both due to synchrotron radiation and by energy loss into higher-order modes. The latter in turn would lead to local heating or discharges wherever such energy got absorbed. Over the course of PEP-II running we experienced numerous such effects, which lead to upgrade programs of significant scope. In the following we will describe the most significant of such effects and their mitigation: (1) Upgrades and repairs of RF seals and shields in both rings; (2) Redesign of overheating stripline kicker electrodes to withstand higher powers; and (3) Redesign and replacement of BPM buttons following failure.

43 PARTICLE ACCELERATORS↗

A Solid-State Nanosecond Beam Kicker Modulator Based on the DSRD Switch

A fast solid-state beam kicker modulator is under development at the SLAC National Accelerator Laboratory. The program goal is to develop a modulator that will deliver 4 ns, {+-}5 kV pulses to the ATF2 damping ring beam extraction kicker. The kicker is a 50 {Omega}, bipolar strip line, 60 cm long, fed at the downstream end and terminated at the upstream end. The bunch spacing in the ring is 5.6 ns, bunches are removed from the back end of the train, and there is a gap of 103.6 ns before the next train. The modulator design is based on an opening switch topology that uses Drift Step Recovery Diodes as the opening switches. The design and results of the modulator development are discussed. There are many applications that benefit from very fast high power switching. However, at MW power levels and nanosecond time scales, solid state options are limited. One option, the Drift Step Recovery Diode (DSRD) has been demonstrated as capable of blocking thousands of volts and switching in nanosecond to sub-nanosecond ranges. When used as an opening switch, the DSRD exhibits a very fast turn off transient. The process is described in detail by its pioneers in [5,6]. In essence, charge is pumped into and then extracted from the DSRD under pulsed conditions. The turn off transient occurs precisely when the pumped charge is equal to the extracted charge and the DSRD is switched off. At the SLAC National Accelerator Laboratory, a DSRD is being used as an opening switch in the development of a fast kicker modulator. The modulator is designed to create {+-}5kV pulses with <1ns rise and fall time on a 50{Omega} strip line kicker. As is common in beam optics, the absence of power in the kicker before and after the pulse is very important. The entire {+-}5kV kicker modulator is composed of two identical 5kV pulsing circuits, each with its own DSRD component. This paper describes the modulator topology and the status of tests on one of the two 5kV pulse circuits.

43 PARTICLE ACCELERATORS↗